PlanningRegister.ie
Observation pack · Limerick City and County Council

White Oaks , Lisnagry , Co. Limerick

• Demolition of an existing rear conservatory. • Construction of a new single-storey, flat-roof extension to the rear of the dwelling. • Alterations to the existing North-East elevation at ground level. • Modifications, upgrades and associated remedial works to the existing wastewater and surface water drainage systems, including associated pipework. • All associated site works

Observations close 10 Dec 2026 22 days left
5 weeks from receipt (received 5 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 8 Jan 2027

The application

Reference
2661261 · full record
Authority
Limerick City and County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
2,063 m²
Received
5 Nov 2026
Decision due
8 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://eplanning.ie/LimerickCCC/AppFileRefDetails/2661261/0.
  2. Write your observation.Quote 2661261 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Limerick City and County Council takes it online with the submission or at the counter.
  4. Submit before 10 Dec 2026.Online through the register above, or in writing to the Planning Department, Limerick City and County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • Recorded monument × 1
    R188549

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2561316Conditional12 Feb 2026494 mconstruction of a new spectator covered stand and new viewing terraced area and all associated site works
2561090Conditional12 Dec 20251451 mthe demolition of existing substandard dwelling house, construction of a replacement dwelling house and domestic waste water treatment system with polishing filter, improvement of existing vehicular to include set back of existing front boundary wall, together with all associated site works
25274Conditional6 Oct 20250 mconservatory to rear of house
2461010Conditional20 Jan 2025202 mthe upgrade of existing waste water treatment system and all associated site works
2460085Conditional7 Aug 2024204 mthe construction of a new single storey extension and the addition of a new dormer window to the rear of the existing house to include the removal of an existing single storey extension house, new windows throughout and all ancillary site works
2460177Refused24 Apr 20241212 mthe subdivision of the existing site, the construction of a new dwelling, installation of a new waste water treatment system for the new dwelling and the upgrade of the existing wastewater treatment system servicing the existing dwelling and all associated site works
2355Conditional23 Mar 20231190 ma new two storey house with attached garage, an effluent treatment system and a new site entrance
22815Conditional11 Jan 2023333 mthe conversion and extension to an existing single storey garage to form a new granny flat consisting of bedroom, bathroom, kitchen/dining room and porch all linked to existing house with new off street car parking and for upgrading of existing main porch to house and installation of new treatment system

What has happened on this file

  • 5 Nov 2026 New application · observations close 10 Dec 2026
  • 5 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 17 Nov 2026, 23:00. Not legal advice — confirm the deadline with Limerick City and County Council before relying on it.