The Keerhan , Woodmill Tullyallen , Co. Louth
Permission for amendments to granted planning application reference No LH/2560001 consisting of omission of the machinery store, dispatch office, kitchenette, toilet & changing room, Revisions to loading bay area, extending agricultural apple storage shed by 3.6m, roof pitch design revised and addition of panel room, plant room and drying room aswell as all associated site works
The application
- Reference
- 2660666 · full record
- Authority
- Louth County Council
- Type
- PERMISSION
- Status
- PRE_VALIDATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 1.18 ha
- Received
- 29 Sept 2026
- We first saw it
- 30 Sept 2026, 23:22
- Decision due
- 23 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/LouthCC/AppFileRefDetails/2660666/0.
- Write your observation.Quote
2660666at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Louth County Council takes it online with the submission or at the counter.
- Submit before 3 Nov 2026.Online through the register above, or in writing to the Planning Department, Louth County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2560001 | Conditional | 12 Dec 2025 | 0 | 0 m | Demolition of existing Machine Storage shed and Construction of new Agricultural Apple storage shed, New Machine storage shed, Loading dock area, dispatch office, kitchenette, toilet & changing room and as well as all associated site works *Significant Further Information Received on 18/11/2025* |
| 2460006 | Conditional | 22 Feb 2024 | 0 | 475 m | the proposed development will consist of the replacement of existing packaged wastewater treatment system and soil polishing filter serving the existing dwelling house, to a new packaged wastewater treatment plant and raised Tertiary sand polishing filter and all associated site works |
| 2360375 | Conditional | 18 Dec 2023 | 1 | 445 m | the development will consist of a redesigned single storey dwelling and garage from that approved under application LB191338 along with a repositioned vehicular entrance to site and a repositioned wastewater treatment system and polishing filter. All other aspects of the development to remain as previously approved |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 29 Sept 2026 New application · observations close 3 Nov 2026
- 29 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 30 Sept 2026, 23:22. Not legal advice — confirm the deadline with Louth County Council before relying on it.