PlanningRegister.ie
Observation pack · Louth County Council

Lowrath North Louth , Dundalk , Co. Louth.

Permission for a two storey dwelling house, detached domestic garage, proprietary wastewater treatment system, percolation area and all associated and ancillary site works incorporating site boundaries and entrance onto public road

Observations close 15 Dec 2026 24 days left
5 weeks from receipt (received 10 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 13 Jan 2027

The application

Reference
2660781 · full record
Authority
Louth County Council
Type
PERMISSION
Status
PRE_VALIDATION
Units
2
Floor area
227 m²
Site area
2,589 m²
Received
10 Nov 2026
Decision due
13 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/LouthCC/AppFileRefDetails/2660781/0.
  2. Write your observation.Quote 2660781 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Louth County Council takes it online with the submission or at the counter.
  4. Submit before 15 Dec 2026.Online through the register above, or in writing to the Planning Department, Louth County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660016Conditional6 Mar 20261356 mPermission will consist of internal and external alterations to the existing dwelling, including revised elevations, replacement of the existing hipped roof with a new pitched roof, revised fenestration, external finishes and front porch. Amendment to car parking layout to improve vehicular circulation within the site curtilage. The development also includes a new single-storey outdoor room and plant area to the rear, alterations to existing paving area and new entrance pier and gates, and all associated site works and services.
2560453Conditional29 Aug 20251395 mThe development will consist of permission for the construction of a single storey extension to side of existing dwelling along with all ancillary site works
2560084Refused4 Apr 202510 mOutline Permission for the development which will consist of a dwelling house, proprietary wastewater treatment system, percolation area and all associated and ancillary site works incorporating site boundaries and entrance onto public road.
2460178Conditional16 May 2024395 mRetention of single storey extensions to a detached single storey dwelling house and all associated and ancillary site works
2360296Conditional17 Nov 202398 mEirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply to Meath County Council for permission for works associated with the proposed uprate of the existing Louth – Woodland 220 kV overhead powerline (OHL) between the existing Louth 220 kV substation in the townland of Monavallet, County Louth and the existing Woodland 220 kV substation in the townland of Woodland, County Meath. The Louth – Woodland 220 kV OHL is approximately 61.5 km long and comprises 207 no. steel lattice tower structures. The existing circuit is located within the functional area of Louth County Council and Meath County Council. Approximately 38.5 km of the existing OHL circuit is located within the functional area of Meath County Council and approximately 23 km is within the functional area of Louth County Council. A separate planning application is being lodged with Louth County Council. The Proposed Development within the functional area of Meath County Council is located in the townlands of Cardrath, Broomfield, Balrenny, Higginstown (Slane Electoral Division), Coalpits, Mooretown (Slane Electoral Division), Cashel, Crewbane, Rossnaree, Fennor (Painestown Electoral Division), Newtown (Painestown Electoral Division), Rathdrinagh, Thurstianstown, Painestown (Painestown Electoral Division), Knockharley, Veldonstown, Kentstown, Danestown, Proudstown (Skreen Electoral Division), Macetown (Skreen Electoral Division), Painestown (Macetown Electoral Division), Frankstown, Riggins (Kilbrew Electoral Division), Reask (Kilbrew Electoral Division), Hallstown, Cabinhill, Flemingtown (Ratoath Electoral Division), Twentypark, Lagore Little, Brownstown (Ratoath Electoral Division), Bradystown, Curkeen, Commons (Ratoath Electoral Division), Gormanstown, Wilkinstown (Dunshaughlin Electoral Division), Powderlough, Raynestown, Derrockstown, Mill Land (Dunshaughlin Electoral Division), Parsonstown, Rathregan, Portan (Dunshaughlin Electoral Division), and Woodland. Five (5) temporary construction compounds and associated access routes are located in the townlands of Knockmooney, Slane, Rath, Flemingstown and Tuiterath. The Proposed Development works within the functional area of County Meath will comprise: ? the replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor; ? the strengthening of up to 25 no. tower foundations; ? the replacement of hardware and fittings, such as insulators, insulator ha
2360325Conditional20 Oct 2023199 mEirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intend to apply to Louth County Council for permission for works associated with the proposed uprate of the existing Louth –Woodland 220 kV overhead powerline (OHL) between the existing Louth 220 kV substation in the townland of Monavallet and the existing Woodland 220 kV substation in the townland of Woodland, County Meath. The Louth – Woodland 220 kV OHL is approximately 61.5 km long and comprises 207 no. steel lattice tower structures. The existing circuit is located within the functional area of Louth County Council and Meath County Council. Approximately 23 km of the existing OHL circuit is located within the functional area of Louth County Council and approximately 38.5 km is within the functional area of Meath County Council. A separate planning application is being lodged with Meath County Council. The Proposed Development within the functional area of Louth County Council is located in the townlands of Monavallet, Carnalughoge, Tullycahan, Priorstate, Artoney, Lowrath North, Rathbrist, Mullacrew, Kilcroney, Glydefarm, Corbollis, Bogtown, Dowdstown, Cudderstown, Scogganstown, Stickillin, Hoathtown, Baltrasna, Hacklim, Millockstown, Anaglog, Belpatrick, and Collon. The Proposed Development works within the functional area of County Louth will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor; • the strengthening of up to 26 no. tower foundations; • the replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware, anti-climbing guards and bird warning spheres at various locations; • the replacement of suspension clamps and vibration dampers at all structure locations; • all associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts / piers and removal and reinstatement of existing fencing; and • other temporary associated and ancillary development works required for the purpose of the uprate of the existing circuit, including temporary guard poles, construction compounds, the installation of silt traps, silt fences, stone tracks, ground protection mats and temporary watercourse crossings. This application includes a Natura Impact Statement (NIS)

What has happened on this file

  • 10 Nov 2026 New application · observations close 15 Dec 2026
  • 10 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 17 Nov 2026, 23:00. Not legal advice — confirm the deadline with Louth County Council before relying on it.