PlanningRegister.ie
Observation pack · Mayo County Council

Kilkeeran , Ballinrobe , Co Mayo

To erect a steel framed roof canopy to existing private horse riding arena and to carry out all ancillary site works

Observations close 25 Nov 2026 11 days left
5 weeks from receipt (received 21 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 15 Dec 2026

The application

Reference
2660829 · full record
Authority
Mayo County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
1,857 m²
Received
21 Oct 2026
Decision due
15 Dec 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/MayoCC/AppFileRefDetails/2660829/0.
  2. Write your observation.Quote 2660829 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Mayo County Council takes it online with the submission or at the counter.
  4. Submit before 25 Nov 2026.Online through the register above, or in writing to the Planning Department, Mayo County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • NIAH-recorded building × 1
    Springvale House

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2660032Conditional23 Mar 2026270 mThe proposed development consists of: permission to discharge condition 14 of the previously granted permission under Planning Permission 16/218; minor alterations and additions to the dwelling house including: installation of a garage door at east elevation; installation of additional roof lights to north, east and west elevations; installation of additional windows to east and west elevations; installation of ground floor corridor linking east wing and west wing; installation of new waste water treatment system; and all associated site development works above and below ground.
2560186Conditional18 Sept 2025388 mRetention of an existing 2-unit annex building and the construction of a wastewater treatment system with all associated site works at the above address.
2560256Refused23 Jun 2025270 mThe development consists of: the retention of the part-constructed two-storey dwelling house (as permitted under Reg. Ref. 06/2306 and Reg. Ref. 16/218, with unauthorised works also carried out); and permission for the completion of the structure with a revised design layout and a change of use to a sheltered housing scheme comprising 6 No. single-occupancy sheltered housing units; decommissioning of the existing wastewater treatment system and percolation area and provision of new wastewater treatment system and percolation area; hard and soft landscaping; and all associated site and development works above and below ground. The completed scheme will have a total gross floor area of 703 sq m.
2460592Conditional18 Nov 2024270 mThe proposed development consists of: the retention of the part constructed two-storey dwelling house (as permitted under Reg. Ref.06/2306, with unauthorised works carried out thereafter); the completion of the 6 No. bedroom dwelling house with a revised design, as previously permitted under Reg. Ref. 16/218; hard and soft landscaping; decommissioning of the existing waste water treatment system and percolation area and provision of new waste water treatment system and percolation area; and all associated site development works above and below ground.

Appeals

ACP caseTypeOutcomeDecidedDistance
321462Withdrawn29 Jan 2025270 m
321398Invalid6 Dec 2024270 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 21 Oct 2026 New application · observations close 25 Nov 2026
  • 21 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Mayo County Council before relying on it.