Balrathboyne , Cortown Kells , Co. Meath
the development will consist of (a) demolition of existing flat roof extension to rear of house and partial demolition of existing adjacent outbuilding. (b) Construct single storey pitched roof extension to front and new flat roof extension to rear. (c) Modifications to existing elevations and internal plan layout, (d) Decommissioning of existing septic tank and percolation area and install new proprietary waste water treatment system and polishing filter, (e) all associated site works
The application
- Reference
- 2661069 · full record
- Authority
- Meath County Council
- Type
- PERMISSION
- Status
- PRE_VALIDATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 2,583 m²
- Received
- 25 Aug 2026
- We first saw it
- 11 Sept 2026, 18:51
- Decision due
- 19 Oct 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/MeathCC/AppFileRefDetails/2661069/0.
- Write your observation.Quote
2661069at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Meath County Council takes it online with the submission or at the counter.
- Submit before 29 Sept 2026.Online through the register above, or in writing to the Planning Department, Meath County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660493 | Conditional | 11 Jun 2026 | 0 | 0 m | the original planning permission for the development is 01/996. The development will consist of an application to retain (retention planning permission) a domestic garage on the site |
| 2660072 | Conditional | 10 Jun 2026 | 0 | 47 m | the development will consist of the following: (1) to retain single storey domestic garage/ store consisting of 79 sqm (2) To retain single storey pump house and boiler house / storage consisting of 10sqm (3) All ancillary site works |
| 23780 | Conditional | 6 Mar 2024 | 0 | 46 m | planning permission to retain existing domestic garage and storage areas and for planning permission to construct a dormer style extension over same for use as a games room together with all associated site development works on site |
| 22939 | Conditional | 23 Jan 2023 | 1 | 86 m | the development will consist of the following: (1) to construct a one and a half storied type dwelling house with an attached domestic garage and domestic store to the side of the dwelling house. This is a revision to a previous grant of permission Ref: 211725 which had included a detached domestic garage adjacent to the house (2) minor revisions to the site layout from that granted under planning Ref: 211725 and (3) all ancillary site works |
| 22595 | Conditional | 1 Jul 2022 | 0 | 0 m | the development will consist of laying of underground 33kV medium voltage electrical cables with associated ducting, 4 no. joint bays, with associated communication chambers and ancillary development within the Local public roads L6835, L6836, and L80021 for a distance of approximately 2,991 metres. Permission is sought for a period of 10 years. The underground cable is intended to connect the South Parcel, in Moyagher Lower townland, with the North Parcel, in Milltown townland, of Milltown Solar Farm, which was permitted by An Bord Pleanala following appeal pursuant to An Bord Pleanala Reference number PL17.311460 and Meath County Council Planning Reference number 21/396. A Strategic infrastructure Development Application for the associated 110kV Substation was also permitted by An Bord Pleanala in the North Parcel of the permitted solar farm pursuant to An Bord Pleanala Reference number VA17.310029. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application. |
| 211725 | Conditional | 26 Oct 2021 | 1 | 94 m | the development will consist of the following: (1) To construct a one and a half storied type dwelling house and a detached domestic garage. (2) To install a proprietary waste water treatment unit and percolation area (3) To make a new entrance onto the road to serve the proposed development along with all necessary ancillary site development works |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 25 Aug 2026 New application · observations close 29 Sept 2026
- 25 Aug 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Sept 2026, 18:51. Not legal advice — confirm the deadline with Meath County Council before relying on it.