Downestown , Duleek , Co. Meath
the development will consist of the following: 1. Construction of a new detached, storey-and-half, 5-bedroom dwelling. 2. Restoration of existing cottage for ancillary use to the proposed dwelling. 3. New vehicular entrance to site. 4. New proprietary wastewater treatment system & percolation area. 5. All associated site works
The application
- Reference
- 2661154 · full record
- Authority
- Meath County Council
- Type
- PERMISSION
- Status
- PRE_VALIDATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 1
- Floor area
- 350 m²
- Site area
- 3,455 m²
- Received
- 17 Sept 2026
- We first saw it
- 22 Sept 2026, 16:10
- Decision due
- 11 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/MeathCC/AppFileRefDetails/2661154/0.
- Write your observation.Quote
2661154at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Meath County Council takes it online with the submission or at the counter.
- Submit before 22 Oct 2026.Online through the register above, or in writing to the Planning Department, Meath County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
- Radon risk area × 2About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 5 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660467 | Conditional | 17 Jun 2026 | 0 | 378 m | the development consists of modifications to the existing building, granted permission under Planning reference number LB-191719, to redesignate one existing 20 square metre bedroom at 1st floor level from a family member bedroom to a resident bedroom, revising the number of resident bedrooms from 120 as granted, to 121 bedrooms, with no changes to the plans, elevations, size or fabric of the building |
| 2460866 | Conditional | 14 Feb 2025 | 1 | 473 m | planning Application for the construction of a new 3m walking track complete with 8m lighting columns, a new floodlit playing pitch complete with 16m high floodlighting columns, a new Information Sign and all associated works. Significant further information/revised plans submitted on this application |
| 23458 | Conditional | 20 Jun 2023 | 0 | 0 m | The proposed development will consist of an uprate of the existing Gorman to Platin 110 kV Overhead line (OHL) (19.76 km long and comprising 109no. supporting structures between the existing Gorman substation in the townland of Causetown, Co. Meath and the existing Platin 110kV substation in the townland of Platin, Co. Meath). The proposed project is located within the townlands of Graigs, Ardmulchan, Dollardstown, Dunmoe, Carranstown, Platin, Haystown and Carnuff, Stackallan, Harmanstown, Causetown, Garballagh, Commons, Downestown, Gillinstown, Longford, Rathdrinagh, Painestown, Thurstianstown, Knockcommon, Drumman, Laugher, Newtown and Platin.The proposed uprate project will comprise: • the replacement ("restringing") of the existing OHL circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the replacement of 42no. existing polesets - any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, will be along the same alignment as existing, and will be of a similar height and appearance; • the replacement of steel members at 8no. steel angle masts; • replacement of hardware and fittings at all structure locations; • replacement and relocation of fibre communication structures; • all associated site development works; • Earthwire to be replaced between Angle Mast 94 and End Mast 108; • Tower painting at 10no. steel Angle/End masts; • foundation strengthening works at 4no. Angle Masts; • Anti-climbing guards to be installed at lno. location; • all associated works within the existing Gorman substation and Platin 110 kV substation to accommodate the uprated 110 kV overhead line including alterations to existing apparatus; • all associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts/ piers and removal and reinstatement of existing fencing; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings ..... |
| 22972 | Conditional | 2 May 2023 | 0 | 385 m | the development will consist of a 10-year permission for the construction of a solar PV energy development within a total site area of approximately 18.92ha, include solar PV panels ground mounted on steel support structures, IPP electrical control building and associated compound, electrical transformer/inverter station modules, battery storage modules, storage containers, CCTV cameras, access tracks, fencing and associated electrical cabling, ducting and ancillary infrastructure. Significant further information/revised plans submitted on this application |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 322060 | — | Other | 2 Jul 2025 | 0 m |
| 317568 | — | Granted with conditions | 22 Oct 2024 | 0 m |
| 317209 | — | Granted with conditions | 16 Aug 2024 | 152 m |
| 310502 | — | Granted with conditions | 10 May 2023 | 484 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 17 Sept 2026 New application · observations close 22 Oct 2026
- 17 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 22 Sept 2026, 16:10. Not legal advice — confirm the deadline with Meath County Council before relying on it.