PlanningRegister.ie
Observation pack · Monaghan County Council

Glynch , Killeevan , Co Monaghan

permission for development consisting of the re-contouring of existing undulating agricultural farmland to include the importation of green field soil and stone (not exceeding 25,000 tonnes) in order to raise the levels of the land together with all ancillary site works

Observations close 16 Oct 2026 21 days left
5 weeks from receipt (received 11 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 5 Nov 2026

The application

Reference
2660387 · full record
Authority
Monaghan County Council
Type
PERMISSION
Status
PRE_VALIDATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
2.44 ha
Received
11 Sept 2026
We first saw it
22 Sept 2026, 16:10
Decision due
5 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/MonaghanCC/AppFileRefDetails/2660387/0.
  2. Write your observation.Quote 2660387 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Monaghan County Council takes it online with the submission or at the counter.
  4. Submit before 16 Oct 2026.Online through the register above, or in writing to the Planning Department, Monaghan County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2460182Conditional21 Jan 2025041 mpermission for a two storey extension to the existing childcare facility comprising of preschool and afterschool rooms, signage, connection to the existing wastewater treatment system, provision of additional car parking spaces together with all ancillary site works, Significant Further Information relates to, Revised site layout plan, Revised Location plan and Road Safety Audit
2360253Conditional27 Mar 2024063 mpermission for development consisting of: • Construction of a single storey new indoor playing arena with attached two storey structure consisting changing rooms, meeting rooms, social room, gym and ancillary rooms. • Construction of new outdoor playing field with soil retaining structures, boundary fencing, flood lighting and all required ancillary works. • Construction of new internal access roadways, car parking together with associated hard and soft landscaping. • Widening of existing access route, installation of new culvert to link existing access route to proposed internal roadways. • Installation storm water drainage system including attenuation tank. • Installation of proprietary wastewater treatment system. • Signage to proposed building. Significant Further Information submitted relates to Revised Site Services Plan, Revised site layout plan, Site Drainage Plan, Landscaping Plan, Flood Risk Assessment
23210Conditional23 Nov 20230312 mpermission to retain (i) Changes to existing bungalow and septic tank (ii) Domestic garage & store (iii) Exit on to public road by existing entrance
2335Conditional16 Mar 20230145 mpermission for development consisting of erecting a new perimeter floodlighting system to the perimeter of existing GAA pitch together with all ancillary site works

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 11 Sept 2026 New application · observations close 16 Oct 2026
  • 11 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 22 Sept 2026, 16:10. Not legal advice — confirm the deadline with Monaghan County Council before relying on it.