Leamore , Blueball , Co. Offaly
construction of a new dwelling house and waste water treatment system and all associated site works
The application
- Reference
- 2660439 · full record
- Authority
- Offaly County Council
- Type
- PERMISSION
- Status
- INCOMPLETED APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 2,390 m²
- Received
- 22 Aug 2026
- We first saw it
- 18 Sept 2026, 15:44
- Decision due
- —
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/OffalyCC/AppFileRefDetails/2660439/0.
- Write your observation.Quote
2660439at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Offaly County Council takes it online with the submission or at the counter.
- Submit before 28 Sept 2026.Online through the register above, or in writing to the Planning Department, Offaly County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2560406 | Conditional | 21 Jan 2026 | 1 | 155 m | (1) the construction of a new dwelling, Garage, Effluent Treatment System with polishing filter, new entrance and all associated site works (2) retention permission for an existing front boundary wall and entrance, and (3) permission for alterations to existing front boundary wall and entrance to provide a splayed entrance |
| 2560014 | Conditional | 7 Aug 2025 | 0 | 375 m | the development of a recreational shared cycle and walkway located on Bord Na Móna lands within the townlands of Cloncraff or Bloomhill, Clonascra, Ballyduff, Clonaderg, Doon Demesne, Lackagh Beg, Lackagh More, Cormore and Corbeg, Corbane, Ballydaly, Kilcolgan Beg, Turraun, Leabeg, Leamore, Oughter, Derrymore, Bunakeeran, Lumcloon and Broughal in County Offaly. The development proposes the following; a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 16,919 meters of existing former rail bed and 8,960 meters along existing bog headlands / former high fields. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Greenway, The Offaly Way, and the Lough Boora Discovery Park. c) The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; i. 5 no. Type 2 Gateways (including 2 no. upgrades to existing parking and 3 no. proposed parking facilities) ii. 6 no. Type 3 Gateways iii. 1 no. Type 4 Gateways iv. 2 no. Major Rest Points v. 2 no. Minor Rest Points d) Upgrade works to Brosna Bridge (Ref 15-100). e) The construction of a new pedestrian and cycle bridge spanning the Grand Canal within the Turraun townland. f) Upgrade works to 10 no. local access road crossings, and 8 no. agricultural crossings. g) The erection of wayfinding and interpretative signage at Gateway locations along the route. h) The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. i) Fencing and screening will be erected where required for health and safety and biodiversity reasons which will include 14,909 meters of ecological screening. j) All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS) |
| 22121 | Refused | 4 Aug 2022 | 1 | 464 m | CONSTRUCTION OF A SINGLE STOREY DWELLING, DOMESTIC GARAGE WITH PROPRIETARY EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED WORKS |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 22 Aug 2026 New application · observations close 28 Sept 2026
- 22 Aug 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Offaly County Council before relying on it.