Clonin Coolcor , Rhode , Co. Offaly
The provision of a 110kV AIS substation at Clonin, Coolcor, Rhode, Co. Offaly. The proposed development will extend the existing Derryiron 110kV transmission node. The proposed development includes the following: (i) EirGrid compound comprising EirGrid control building and external Air Insulated Switchgear (AIS), (ii) Independent Power Producer (IPP) compound, adjoining the north-western area of the proposed substation, comprising IPP control building, external grid transformer and AIS, and an underground electrical connection to the energy storage development permitted under planning application Ref. 2460289, (iii) underground 110kV electrical connection from the proposed substation to the existing Derryiron 110kV transmission node, including cabling in the public road (L10093-2), (iv) underground 110kV electrical connection from the proposed substation to underground transmission cable in the public road (L10093-2) consented under ABP-309491-21, (v) new vehicular access road (“spine road”) connecting to the RGEP road network, providing access to the proposed 110kV substation, revised access arrangements to the development permitted under planning application Ref. 2460289, and planning application Ref. 20238, (vi) new foul sewer line, serving the proposed 110kV substation and the development permitted under planning applications Ref. 2460289 and Ref. 20238, discharging to the existing local public network, (vii) removal of existing disused medium voltage substation and ancillary items, and (viii) all associated civil engineering and electrical engineering works, including underground electrical cables and ducting, temporary construction compound, surface water and foul water drainage, landscaping, lighting and security…
The application
- Reference
- 2660554 · full record
- Authority
- Offaly County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Site area
- 8.00 ha
- Received
- 21 Oct 2026
- Decision due
- 15 Dec 2026
The council’s feed cuts this description short. The full text and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/OffalyCC/AppFileRefDetails/2660554/0.
- Write your observation.Quote
2660554at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Offaly County Council takes it online with the submission or at the counter.
- Submit before 25 Nov 2026.Online through the register above, or in writing to the Planning Department, Offaly County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| C2.2 Economic development and employment | Industrial and Warehousing: The purpose of this zoning is to facilitate opportunities for industrial and warehousing uses, activities and processes which would in general give rise to land use conflict if located within other zonings. | offaly county development plan 2021 2027 | 22 Oct 2021 → 21 Oct 2027 |
| C2.2 Economic development and employment | Industrial and Warehousing: The purpose of this zoning is to facilitate opportunities for industrial and warehousing uses, activities and processes which would in general give rise to land use conflict if located within other zonings. | offaly county development plan 2021 2027 variation no 1 | 22 Oct 2021 → 22 Oct 2027 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Offaly County Council development plan zoning · fetched 25 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Offaly County Council development plan zoning | — | 25 Oct 2026, 23:00 | open |
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660378 | Conditional | 5 Nov 2026 | 0 m | provision of research and development equipment. The proposed development includes the following: (i) one new super capacitor container, (ii) two new two-storey modular DC containers, (iii) one new control room container, (iv) one new transformer and concrete bund, (v) one new IPP module, (vi) one new ESB MV substation module, (vii) one new PCS module, (viii) internal site access roads and connection to Rhode Green Energy Park road network, (ix) all civil engineering and electrical engineering work, including temporary construction compound, surface water and foul water drainage, landscaping, lighting and security fencing | |
| EX26009 | Conditional | 21 Jul 2026 | 0 m | PL2/20/238 FOR AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A 2.7-HECTARE SITE. THE DEVELOPMENT WILL COMPRISE: (i) AN OPEN AREA BATTERY ENERGY STORAGE SYSTEM (BESS) COMPOUND (AREA OF 3,407 SQM) CONTAINING 16 NO. BATTERY ENCLOSURES (13.716M LONG X 2.90M WIDE X 3.796M HIGH), 16 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (12.192M LONG X 2.438M WIDE X 3.396M HIGH), (ii) SYNCHRONOUS CONDENSER COMPOUND (AREA OF 4,706SQM) CONTAINING SYNCHRONOUS CONDENSER BUILDING (30.0M LONG X 18.0M WIDE X 12.15M HIGH), CONTROLS BUILDING (12.486M LONG 12.192M WIDE X 4.865M HIGH), ASSOCIATED BUNDED TRANSFORMERS AND ELECTRICAL PLANT, (iii) ELECTRICAL SUBSTATION (AREA OF 2,325SQM) CONTAINING CUSTOMER BUILDING (10.032M LONG X 7.627M WIDE X 6.169M HIGH), EIRGRID BUILDING (13.507M LONG X 12.509M WIDE X 7.577M HIGH), AND ELECTRICAL PLANT AND BUNDED TRANSFORMER WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE EXISITING DERRYION 110KV SUBSTATION LOCATED ON LANDS ADJOINING THE SITE TO THE SOUTH , (iv) CONTROL BUILDING (17.075M LONG X 5.830M WIDE X 5.960M HIGH), AND (v) ALL ANCILLARY DEVELOPMENT, INCLUDING; LIGHTING MAST PROTECTION, PERIMETER PALISADE FENCING WITH ACCESS GATE AT PRIMARY VEHICLE SITE ENTRANCE WHICH WILL CONNECT TO THE EXISTING ROADS OF THE ADJACENT RHODE BUSINESS PARK PROVIDING ACCESS TO THE R400, LANDSCAPING, LIGHTING,CAR PARKING, INTERNAL ACCESS ROADS AND ALL CIVIL ENGINEERING WORKS FOR THE DISPOSAL OF FOUL AND SURFACE WATER. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THIS PLANNING APPLICATION | |
| 2660001 | Conditional | 26 Feb 2026 | 402 m | to demolish part of, alter, renovate and extend existing dwelling. Permission is also sought to construct a garage, alter existing entrance, install a new wastewater treatment system and polishing filter & decommission existing septic tank and all associated site works | |
| 2560345 | Conditional | 22 Sept 2025 | 4 m | A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation comprising (i) an increase to the footprint of the substation compound by 190 square metres (m2) arising from the realignment of the existing palisade fence; (ii) the installation of electrical equipment including circuit breakers, cable sealing ends and voltage transformers; (iii) the installation of approximately 20m of 110kV underground electricity line; and, (iv) all associated ancillary site development works. This planning application is accompanied by an Appropriate Assessment Screening Report | |
| 2560129 | Conditional | 2 Sept 2025 | 0 m | an Operations Building with a floor area of approximately 285m2. The Operations Building will consist of: - 1 No. Kitchen/Mess - 1 No. Locker Room including welfare facilities - 1 No. Accessible Toilet - 1 No. Toilet - 3 No. Offices - 1 No. Workshop/Store - 2 No. Server/IT store - 1 No. Meeting room - 1 No. External compound - 6 No. Permanent storage containers - Roof mounted solar panels - Connection to existing water, storm water and sewage infrastructure at Rhode Green Energy Park - Temporary cabins to be used during the construction phase - External parking, EV charging, lighting, CCTV, fencing etc. and ancillary site works | |
| 2460289 | Conditional | 8 Aug 2025 | 0 m | development of a 22-hectare site. The proposed development comprises (i) two (2no.) air dome structures for the storage of carbon dioxide at atmospheric pressure (each 500m x 120m x 34m high) and associated cooling, compression, pumping and power generation equipment and machinery (ii) a single-storey storage and control building, (iii) internal site access roads and connection to existing and consented roads at Rhode Green Energy Park, (iv) underground electrical cable connection to Derryiron 110kV substation, (v) all civil engineering works, surface water and foul water drainage, landscaping, lighting and security fencing | |
| 2460479 | Conditional | 4 Feb 2025 | 0 m | (i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on existing concrete slabs, (ii) one new inverter container measuring 5.9m x 2.35m x 2.37m placed on an existing concrete slab, (iii) access to the site is from the L-10093-2 which connects the R400 regional road, (v) all civil engineering and electrical engineering works to provide for connection to the electricity distribution network on site via the existing medium voltage substation within the site. | |
| 2460260 | Conditional | 29 Aug 2024 | 1 | 455 m | the construction of a storey and a half type dwelling house, a detached garage, vehicular entrance, installation of an effluent treatment system/polishing filter and any other associated site works |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 319023 | Granted with conditions | 28 Apr 2026 | 24 m | |
| 315436 | Withdrawn | 15 Jan 2024 | 0 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 21 Oct 2026 New application · observations close 25 Nov 2026
- 21 Oct 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Offaly County Council before relying on it.