Ballindarra , Birr , Co. Offaly Ireland
1/ Proposed subdivision of existing site into 2No. sites. 2/ Construction of new site entrance to service the proposed new dwelling on proposed Site No.2. 3/ Construction of new dwelling house incorporating existing site entrance in proposed Site No. 2 and all ancillary works
The application
- Reference
- 2660587 · full record
- Authority
- Offaly County Council
- Type
- PERMISSION
- Status
- PRE_VALIDATION
- Site area
- 5,341 m²
- Received
- 11 Nov 2026
- Decision due
- 14 Jan 2027
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/OffalyCC/AppFileRefDetails/2660587/0.
- Write your observation.Quote
2660587at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Offaly County Council takes it online with the submission or at the counter.
- Submit before 16 Dec 2026.Online through the register above, or in writing to the Planning Department, Offaly County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| R2 Existing residential | Existing Residential: This zoning allows for the conservation and enhancement of the quality and character of existing residential areas, to protect residential amenities and to allow for small scale infill development. | offaly county development plan 2021 2027 | 22 Oct 2021 → 21 Oct 2027 |
| R2 Existing residential | Existing Residential: This zoning allows for the conservation and enhancement of the quality and character of existing residential areas, to protect residential amenities and to allow for small scale infill development. | offaly county development plan 2021 2027 variation no 1 | 22 Oct 2021 → 22 Oct 2027 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Offaly County Council development plan zoning · fetched 25 Oct 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Offaly County Council development plan zoning | — | 25 Oct 2026, 23:00 | open |
Designations on or near the site within 100 m
- NIAH-recorded building × 322400516 · Riverstown House · bridge
- Recorded monument × 5Castle - tower house · Bawn · Bridge
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660605 | Conditional | 30 Oct 2026 | 87 m | the widening of existing vehicular entrance, removal of existing wall and gates, construction of entrance piers and gates together with associated site works | |
| 2652 | Conditional | 21 Jul 2026 | 1 | 460 m | DOMESTIC GARAGE/FUEL SHED WITH FIRST FLOOR ARTS/CRAFTS ROOM AND ATTACHED SINGLE STOREY LEAN TO/OPEN SHED AREA AND ALL ANCILLARY SITE WORKS |
| 2560342 | Refused | 15 May 2026 | 1 | 0 m | Full planning permission for the following: 1/ Proposed subdivision of existing site into 2No. sites. 2/ Construction of new site entrance to service the existing dwelling on proposed Site No.1. 3/ Construction of new dwelling house incorporating existing site entrance in proposed Site No. 2 and all ancillary works |
| 2560109 | Conditional | 8 Oct 2025 | 1 | 111 m | the construction of a new dwelling house, entrance and ancillary works |
| 2592 | Conditional | 15 Sept 2025 | 148 m | 1) the construction of a new agricultural slatted shed complete with an underground slurry storage tank, 2) extension to existing concrete silage slab, 3) all associated ancillary site works to complete the development | |
| 2560404 | Conditional | 30 Jun 2025 | 282 m | a single storey extension to the rear of the house, amendments to existing fenestration and all ancillary site works | |
| 2429 | Conditional | 27 Aug 2024 | 5 | 228 m | (A) CONVERSION OF ATTIC SPACE TO LIVING ACCOMMODATION AND ALTERATIONS TO DOMESTIC GARAGE PREVIOUSLY GRANTED PERMISSION UNDER PL2/02/741. (B) RETENTION PERMISSION OF ADDITIONAL DOMESTIC GARAGE/FUEL SHED, (C) RETENTION PERMISSION OF STEEL FABRICATED GARDEN EQUIPMENT SHED, (D) RETENTION PERMISSION OF FREIGHT CONTAINER WITH ATTACHED ENCLOSURE FOR THE HOUSING OF DOMESTIC ANIMALS AND ALL ANCILLARY SITE WORKS |
| 2360763 | Refused | 16 Nov 2023 | 159 m | (1) The construction of 7 no. wind turbines and associated hardstand areas with the following parameters a) total tip height range of 179.5m – 185m, b) rotor diameter range of 149m – 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. permanent 38kV electrical substation which will be constructed in the townland of Faddan Beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) All works (within County Tipperary) associated with the connection of the proposed wind farm to the national electricity grid, via the provision of underground electrical cabling (38kV) to the existing Dallow 110kV substation in the townland of Clondallow, Co. Offaly; (4) Provision of 10 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (5) reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; (6) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (7) 1 no. meteorological mast with a height of 107m above ground and associated foundation and hard-standing area; (8) upgrade of existing tracks and roads and the provision of new site access roads; (9) all works associated with the provision of a new permanent site entrance off the L5040 local road; (10) provision of 5 no. new access and egress points along the L5041 local road in the townlands of Cloncorig, Faddan More and Coolderry; (11) Provision of 4 no. peat repository areas and 3 no. spoil repository areas; (12) 2 no. temporary construction compounds with temporary site offices and staff facilities; (13) Accommodation works along the public road network along the N52 national secondary road in the townland of Ballyloughnane to facilitate the delivery of turbine components and other abnormal sized loads; (14) Site Drainage; (15) Tree Felling; (16) Operational stage site signage; and, (17) all associated site development works, ancillary works and apparatus. - Works within the curtilage of Protected Structures RPS Ref. TRPS336 (Ballyloughnane Bridge) and RPS Ref. TRPS519 (Croghan Bridge) |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 324279 | pending | 8 May 2026 | 159 m | |
| 324220 | Withdrawn | 20 Apr 2026 | 159 m | |
| 318689 | Granted with conditions | 30 Jun 2025 | 159 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 11 Nov 2026 New application · observations close 16 Dec 2026
- 11 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Offaly County Council before relying on it.