The Planning Application is subject to Section 34D of the Planning and Development Act 2000 (as amended) and in accordance with Article 16(2) of the Renewable Energy Directive III (Directive 2023/2413) i.e. Completeness Check. Permission for development which will consist of a relevant solar farm development comprising: i. Installation of PV panels on ground mounted frames in rows with a max height of 3.2m. ii. An ESB electricity substation compound including single storey substation building and electrical infrastructure. iii. Up to 6 no. single inverter stations (or an alternative string inverter provision). iv. Internal underground electrical and communications cabling and ducting. v. Use of already approved farm access tracks (PD/26/60040) and provision of additional new internal access tracks vi. All ancillary site development works and landscaping, including temporary construction compound, deer-type fencing, security fencing, security gates and CCTV cameras. vii. Widening of existing west site-entrance and relocation of existing east site-entrance. viii. Construction access via L75814, post-construction ESB maintenance access via L20271. ix. The decommissioning and reinstatement of the solar farm at the end of its operational life. x. On a site area of approximately 16.3 hectares. xi. A Natura Impact Statement accompanies this submission. The solar farm will have an operational lifespan of 40 years and an estimated export capacity of approx. 10MW of electricity. Planning permission is sought for a period of 10 years for construction, with an operational life of 40 years from the date of commissioning, including the decommissioning and reinstatement of the solar farm at the end of its operational life. In accordance with Article 239 of the Planning and Development Regulations 2001 (as amended), notice is hereby given that a Natura Impact Statement is submitted to the planning authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application is subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The proposed development is at

Observations close 23 Sept 2026 2 days left
5 weeks from receipt (received 19 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 26 Nov 2026

The application

Reference
2660426 · full record
Authority
Roscommon County Council
Type
PERMISSION
Status
PRE_VALIDATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
16.41 ha
Received
19 Aug 2026
We first saw it
18 Sept 2026, 15:44
Decision due
26 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/RoscommonCC/AppFileRefDetails/2660426/0.
  2. Write your observation.Quote 2660426 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Roscommon County Council takes it online with the submission or at the counter.
  4. Submit before 23 Sept 2026.Online through the register above, or in writing to the Planning Department, Roscommon County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660040Conditional8 Jun 202600 mPermission is sought to install a farm roadway on farm lands at
2550Conditional19 Dec 20251107 mPermission 1. To construct an extension to the rear of existing single storey dwelling house and to decommission existing septic tank and install new treatment unit & percolation area. 2. To construct an extension to existing stables to form garage and general storage and all associated site works at
2560197Conditional24 Jun 20250349 mRetention Permission to retain as constructed agricultural entrance and all ancillary site development works at
2560070Conditional22 Apr 20250494 mPermission for the retention of development, consisting of existing granny flat extension and retention of existing farm sheds at
2560019Conditional13 Mar 20250400 mRetention Permission 1.To retain as constructed agricultural entrance and all ancillary site development works at
2316Refused15 Mar 20231299 mRetention Permission for the retention of existing groundworks which consists of a surface water drainage system together with Permission for the proposed construction of a bungalow type dwelling house, entrance, boundary fence/wall, suitable on site sewerage system with polishing filter and all ancillary site works at

Appeals

ACP caseTypeOutcomeDecidedDistance
501666open2 Jul 20260 m
501664open2 Jul 20260 m
322045Granted with conditions20 Nov 202544 m
323019open14 Jul 2025349 m
316211Refused6 Mar 2024299 m
316188Invalid3 Apr 2023299 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 19 Aug 2026 New application · observations close 23 Sept 2026
  • 19 Aug 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Roscommon County Council before relying on it.