PlanningRegister.ie
Observation pack · South Dublin County Council

St. Thomas' Junior National School, Jobstown, Tallaght, Co. Dublin

Demolition of the existing single-storey c. 2,605sq.m. Junior School building; demolition of the existing single-storey c. 211sq.m. Junior School ancillary structures; construction of a new part three/part two-storey c. 4,998sq.m - Junior School building, located to the west of the existing Senior School building. The new school will accommodate 27 classrooms, a 3-class base Special Education Needs facility and all ancillary accommodation (the Senior School does not form part of planning application); 2 single-storey temporary accommodation units, c. 400sq.m, located to the south of the site, to facilitate the construction of the new school building; renewable energy design measures, PV Panels and/or heat pumps located at roof level; new school signage comprising wall-mounted lettering on the front elevation of the new building; external hard play area and 2 Multi-Use Games Areas; all located to the south of the site; redevelopment of the existing staff car parking and set-down facilities within the school site comprising: provision of 40 Junior school staff car parking spaces and 6 car set-down spaces, resurfacing of 22 existing Senior school car parking spaces, 106 bicycle parking spaces, new access road, new footpaths, landscaping and all ancillary site works; boundary treatment comprising of repair works to the existing low-level blockwork wall and new metal railings to an overall height of 2.4m along Fortunestown Road; replacement of the existing palisade fencing with new 2.4m high railings along Kiltalown Park Rd to the south; replacement of the existing pedestrian and vehicular entrance gates; works in the public road outside the school site: including 5 set-down spaces along Fortunestown Road, and services connection required to facilitate the development.

Observations close 29 Sept 2026 14 days left
5 weeks from receipt (received 25 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 19 Oct 2026

The application

Reference
SD21A/0207/EP · full record
Authority
South Dublin County Council
Type
Extension Of Duration Of Permission
Status
Officer Allocation
Applicant
not published by the national dataset — see the council register
Units
Floor area
Site area
1.54 ha
Received
25 Aug 2026
We first saw it
15 Sept 2026, 20:40
Decision due
19 Oct 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/70916.
  2. Write your observation.Quote SD21A/0207/EP at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
  4. Submit before 29 Sept 2026.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
R2
Existing residential
RES: To protect and/or improve residential amenitySD-001:DP:south-dublin-county-development-plan-2022-20288 Mar 20228 Mar 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: SDCC SD-001:DP:south-dublin-county-development-plan-2022-2028 · fetched 11 Sept 2026, 23:18
SourceLicenceFetchedLink
SDCC SD-001:DP:south-dublin-county-development-plan-2022-202811 Sept 2026, 23:18open

Designations on or near the site

  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
SD26A/0090WRefuse permission for retention4 Jun 2026357 mRetention to retain single storey independent unit in rear garden, and all associated site works.
SD26A/0072WGrant permission for retention13 May 2026482 mRetention for the existing single storey pre-school and afterschool childcare buildings with associated site works.
SD26A/0045WGrant permission15 Apr 202676 mMinor alterations to the existing Pastoral Centre to include the formation of a new entrance door and enlarged window on the elevation to Fortunestown Road. The provision of a community café service within the existing main room of the building and all associated works including new skylights to north & south faces of the roof & minor site works.
SD26A/0060WInvalid - site notice18 Mar 2026482 mRetention of the existing single storey pre-school and afterschool childcare buildings with associated site works.
SD26A/0013WRefuse permission12 Mar 2026180 mFor the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works.
SD25A/0314WInvalid - site notice13 Jan 202679 mFor the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works
SD25A/0240WGrant permission24 Nov 2025419 mThe development will consist of the installation of approximately 658.63 sq.m of Photo-Voltaic Solar Panels onto the existing roof. The solar panels will be used to create green electricity, all of which will be used by building.
ED25/0059Declared not exempt20 Nov 2025348 mConstruction of single storey extention to the rear of the property

Appeals

ACP caseTypeOutcomeDecidedDistance
323983Referralpending17 Dec 2025333 m
318158Planning AppealRefused19 Jun 202479 m
312556Planning AppealGranted with conditions3 May 2022152 m
312453Planning AppealRefused11 Apr 2022283 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 25 Aug 2026 New application · observations close 29 Sept 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 15 Sept 2026, 20:40. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.