Planning Register
Observation pack · South Dublin County Council

18, Drumcairn Gardens, Dublin 24, D24 HX5W

Construction of 1 no. detached two-storey, three-bedroom dwelling with a private rear garden including associated landscaping, boundary treatments, drainage and all ancillary site works to be carried out within the side garden.

Observations close 18 Sept 2026 6 days left
5 weeks from receipt (received 14 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 10 Sept 2026

The application

Reference
SD26A/0146W · full record
Authority
South Dublin County Council
Type
Permission
Status
AI Received
Applicant
not published by the national dataset — see the council register
Units
Floor area
127 m²
Site area
352 m²
Received
14 Aug 2026
We first saw it
11 Sept 2026, 18:51
Decision due
10 Sept 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/70513.
  2. Write your observation.Quote SD26A/0146W at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
  4. Submit before 18 Sept 2026.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
R2
Existing residential
RES: To protect and/or improve residential amenitySD-001:DP:south-dublin-county-development-plan-2022-20288 Mar 20228 Mar 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: SDCC SD-001:DP:south-dublin-county-development-plan-2022-2028 · fetched 11 Sept 2026, 23:18
SourceLicenceFetchedLink
SDCC SD-001:DP:south-dublin-county-development-plan-2022-202811 Sept 2026, 23:18open

Designations on or near the site

  • Radon risk area × 2
    About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
SD25A/0262WRefuse permission12 Dec 202520 mPlanning permission for the construction of 2 No. two-storey terraced houses, comprising one 2-bedroom dwelling (mid-terrace) and one 3-bedroom dwelling (end-of-terrace with attic), each with private rear gardens. The proposed development will also include associated landscaping, boundary treatments, drainage, and all ancillary site works, to be carried out within the side gardens.
SD25B/0517WGrant permission21 Oct 202585 mAmendment to planning permission Reg. Ref. SD25B/0307W: Construction of a single-storey flat-roof side extension, together with a new relocated side gate providing access to the rear garden.
SD25A/0243WInvalidate application14 Oct 20250 mThe construction of 2 No. two-storey terraced houses, comprising one 2-bedroom dwelling (mid-terrace) and one 3-bedroom dwelling (end-of-terrace with attic), each with private rear gardens. The proposed development will also include associated landscaping, boundary treatments, drainage, and all ancillary site works, to be carried out within the side garden of No. 18 Drumcairn Gardens, Dublin 24.
SD24A/0244Refuse permission11 Aug 202520 mPlanning permission for the construction of 2 No. three storey 3 bed semi-detached houses. Each dwelling with private rear gardens and car parking space. All with associated landscaping, boundary treatments, drainage, and site work to be carried out in the side gardens of No. 17 and No.18 Drumcairn Gardens Dublin 24.
SD25B/0307WGrant permission18 Jul 202585 mConstruction of a single-storey flat-roof garden room to the rear of the property.
SD25B/0273Grant permission & refuse retention9 Jul 2025186 mRetention permission for ground floor front porch with pitched roof over, canopy over front window & stone clad finish to ground floor front facade. planning permission for chimney for removal from roof & attic level. Attic conversion to habitable room & dormer roof window on rear slope of roof at attic level
SD238/0002Part 8 approved by council12 Jun 2023282 mUpgrade of Jobstown Park. he upgrade of the Jobstown Park will consist of: Upgrade of existing boundaries and access points including provision of focal entrances. A shared pedestrian/cycle route with lighting columns linking Butler McGee Park to Whitestown Stream Park, via Dromcarra Estate. Upgrading existing footpaths where required, install new secondary footpath linkages and realignment of other footpaths. Retention of existing sports pitches (northern pitch re-orientated) - refurbished where necessary with drainage and re-levelling. Four new pedestrian entrances to provide access into the Leisure Centre, in the southeast, southwest and the northeast of the site. Retaining existing kissing gates and upgrade where required. An activity circuit 900m long - with seats and play/exercise equipment A provision for teenspace area, fitness/workout area, natural play areas, pump track and natural play mounds. The provision of on-street parking and associated hard and soft landscaping on Fortunestown Way. Retention and replanting of existing hedgerows. Attenuation swales for enhanced biodiversity. Planting of trees, shrubs, hedgerows, and bulbs. All associated landscape works. All ancillary works.
SD23A/0013Grant permission16 Mar 2023331 mMaterial alteration to a single school wing consisting of the installation of an external insulation with rendered finish to the junior school wing and the installation of an external biomass boiler unit to the north elevation / creche wing as part of the pathfinder 2022 energy upgrade programme.

Appeals

ACP caseTypeOutcomeDecidedDistance
500625Planning AppealRefused29 Apr 20260 m
322103Licences S89/S254(6)(A)Other21 Jul 202553 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 10 Aug 2026 Further information requested
  • 14 Aug 2026 New application · observations close 18 Sept 2026
  • 14 Aug 2026 Further information received

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Sept 2026, 18:51. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.