The existing Grange Castle 110kV Substation, Grange Castle Business Park, Clondalkin, Co. Dublin
Physical extension of c. 1260sq.m. to the existing electricity substation compound and will comprise of an extension of the existing 110kV busbar from bay H18 to create a new 110kV line bay H20, including the installation of new electrical equipment; fencing and all other ancillary development works to facilitate the proposed development.
The application
- Reference
- SD26A/0195W · full record
- Authority
- South Dublin County Council
- Type
- Permission
- Status
- Referral
- Applicant
- not published by the national dataset — see the council register
- Units
- —
- Floor area
- —
- Site area
- 1.95 ha
- Received
- 13 Aug 2026
- We first saw it
- 11 Sept 2026, 18:51
- Decision due
- 7 Oct 2026
- Decision
- not yet decided
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/70841.
- Write your observation.Quote
SD26A/0195Wat the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
- Submit before 17 Sept 2026.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| C2.1 Economic development and employment | EE: To provide for enterprise and employment related uses | SD-001:DP:south-dublin-county-development-plan-2022-2028 | 8 Mar 2022 → 8 Mar 2028 |
| C2.1 Economic development and employment | EE: To provide for enterprise and employment related uses | SD-001:DP:south-dublin-county-development-plan-2022-2028 | 8 Mar 2022 → 8 Mar 2028 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Sources: SDCC SD-001:DP:south-dublin-county-development-plan-2022-2028, SDCC SD-001:DP:south-dublin-county-development-plan-2022-2028 · fetched 11 Sept 2026, 23:18
| Source | Licence | Fetched | Link |
|---|---|---|---|
| SDCC SD-001:DP:south-dublin-county-development-plan-2022-2028 | — | 11 Sept 2026, 23:18 | open |
| SDCC SD-001:DP:south-dublin-county-development-plan-2022-2028 | — | 11 Sept 2026, 23:18 | open |
Designations on or near the site
- EPA-licensed facility × 2Grange BackUp Power Limited · Grange BackUp Power Limited
- Natural Heritage Area (incl. proposed) × 1Grand Canal
- Radon risk area × 3About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels · About 1 in 5 homes in this area is likely to have high radon levels
- OPW flood extent nearby floodinfo.ieShown as a flag only — the OPW licence does not allow us to redistribute the extent.
1 layer present but masked: flood_cfram — source licence forbids redistribution (CC-BY-NC-ND); shown as a boolean and a link only
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| SD25A/0285 | Grant permission | 23 Jan 2026 | — | 0 m | Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank to be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame erected over the proposed generator and existing telecoms equipment, (covering an area of approximately 36 sq.m., to a maximum height of 4.6 meters above local ground level.) Works to include all ancillary development works, all located within an existing fenced compound. |
| SDZ25A/0034W | Grant permission | 25 Sept 2025 | — | 64 m | The development will consist of the construction of 3 no. strategic public parks located inside the Clonburris SDZ as per the Clonburris SDZ Planning Scheme (2019) in the southern part of the overall SDZ comprising: Site A) Provision of 'Stage 3' Griffeen Valley Park Extension' public park of c. 15.94 hectares, on 2 no. parcels of land north and south of the Clonburris Southern Link Street in the western part of the SDZ lands comprising landscaped areas, 1 no. all-weather GAA pitch (with floodlighting - GAA pitch is also sized to cater for 2 no. soccer pitches), 2 no. natural soccer pitches, 3 no. tennis courts and 1 no. padel court (with floodlighting), play areas, 1 no. basketball court, 2 no. cricket practice creases, 1 no. cricket crease, rebound wall area as well as allotment areas and coach parking set down area including 27 no. car parking spaces & 78 bicycle spaces (as well as 2 no. pedestrian access points to Haydens Lane) - vehicular access from permitted access under Planning Reg. Ref. SDZ20A/0021 to the Clonburris Southern Link Street; Site B) Provision of 'Stage 4A' Grand Canal Park' public park of c. 7.32 hectares (to the south of the Grand Canal) comprising 2 no. natural soccer pitches, play areas, ESB substation, and allotment area as well as 30 no. car parking spaces [with access from Lockview Road] & 66 no. bicycle spaces; Site C) Provision of 'Stage 5' Na Cluainte Park South' of c. 4.04 hectares located centrally within the SDZ (on 2 no. sites either side of the Clonburris Southern Link Street) comprising landscaped areas, attenuation ponds, 1 x Soccer All Weather Pitch (floodlit), 1 no. natural soccer pitch, 2 no. basketball courts, play areas, 2 no. cricket practice creases, and 1 no. multi-sports pitch (weights table games etc.) and allotment areas as well as 30 no. car parking spaces & 96 no. bicycle spaces, with access provided from the permitted Clonburris Southern Link Street; Permission is also sought for all associated drainage infrastructure works to include surface water attenuation areas including attenuation ponds and revisions to the permitted 'Stage 1' infrastructure under Planning Reg. Ref. SDZ20A/0021 relating to the coach parking area and attenuation area to the north of the Clonburris Southern Link Street and associated ancillary amendments and integration of the 'Stage 1' infrastructure (under construction) with the proposed development (to include relocation of flood compensation area to the west of the Griffeen River, increased landform variation in attenuation area no. 1, revisions to internal paths, removal of retaining walls to attenuation area no. 2, additional planting). Permission is also sought for all ancillary site development (including site accommodation, site compounds, and temporary construction boundary fencing) and landscape works/planting associated with the development, including hard and soft landscaping, 3 no. temporary project signage (at 3 no. locations) and Irish water foul water diversions in Grand Canal Park. |
| SD25A/0097W | Grant permission | 11 Aug 2025 | — | 285 m | The installation of solar carports and a ground mounted solar PV array. The proposed development will consist of solar carports (three and five panel versions) over existing surface car park areas, solar panels on ground mounted frames, 1 no. single-storey low voltage / medium voltage transformer (skid) unit, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for carport areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via existing site entrances from the existing Grange Castle Business Park internal road network. |
| SD248/0012 | Part 8 approved by council | 8 Jul 2025 | — | 184 m | Change of use and modifications to Grange Cottage which is a protected structure RPS Ref: 120 from residential to a mixed-use development which includes a childcare facility, café, events space, artist’s studios, shop, and clubhouse. The development also includes a small footbridge connecting the development to the existing car parking area in Grange Castle Business Park. An Architectural Heritage Impact Assessment is included as part of this application. |
| SD15A/0061/EP2 | Grant extension of duration of permission | 23 Jan 2025 | — | 0 m | 10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended. |
| SDZ24A/0018W | Grant permission | 23 Oct 2024 | — | 368 m | Permission is sought for minor revisions to the already permitted residential development consisting of: - Minor reduction in gross floor areas and internal layout reconfiguration of 131no. houses (House Type A, B, C, D, E & F) and 142no. duplex units (Duplex Type J, K, L, M, O & P) including change of Duplex Type L from 2-bed Duplex (2 storey) to 3-bed Duplex (2 storey) and all associated elevational adjustments and adjustments to private / communal open space; Replacement of 4no. House Type D with 5no. House Type G; Replacement of 4no. House Type E with 3no. House Type H; Adjustments to the terrace of houses on Local Road 1 (4no. House: No. 278 - 281) to split the previously permitted terrace into 2no. sets of 2no. semi-detached houses (House No. 278 - 279 and House No. 280 - 281); Minor reduction in height of Apartment Block 1; Localised adjustment to landscaping where building footprints have reduced and adjustments to the landscaping around the perimeter of Apartment Block 1 and 2; Additional changes to the specification of the permitted landscaping / road surface finishes; Adjustments to bicycle stores including the addition of 9no. bicycle spaces; And all associated and ancillary site development works. The proposal is a minor amendment to development already permitted under SDCC Reg. Ref. SDZ23A/0004. The development continues to consist of the 395no. dwellings as already permitted. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and related to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015. |
| SD15A/0061/EP | Refuse ext. of duration of permission | 21 Oct 2024 | — | 0 m | 10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended. |
| SD24A/0127W | Grant permission | 26 Aug 2024 | — | 407 m | The installation of double row V-shaped duo-pitch and single row mono-pitch solar carports on the existing surface car park to the north of the QAQC Building and over part of the surface car park to the west of the Development and Drug Substance buildings, 2 no. single storey substation buildings, EV charging equipment, and all other associated works required to facilitate the proposed development including surface water drainage and landscaping |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 323650 | Amend Planning Schema/Add Planning Schema | pending | 15 Sept 2025 | 12 m |
| 316119 | Railway Order Application | Other | 13 Nov 2024 | 495 m |
| 309951 | Electricity Development Application | Granted with conditions | 22 Oct 2021 | 0 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 13 Aug 2026 New application · observations close 17 Sept 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 11 Sept 2026, 18:51. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.