PlanningRegister.ie
Observation pack · South Dublin County Council

Old Nangor Road, Clondalkin, Dublin,22, D22 W5C1

Proposed new vehicular entrance to south boundary to provide access to Old Nangor Road, minor adjustment to internal road layout including provision of bollards to previous vehicular link via Scoil Mochua to East, and associated drainage and ancillary works

Observations close 16 Nov 2026 2 days left
5 weeks from receipt (received 12 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 7 Dec 2026

The application

Reference
SD26A/0247W · full record
Authority
South Dublin County Council
Type
Permission
Status
Valid
Site area
4,113 m²
Received
12 Oct 2026
Decision due
7 Dec 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/71192.
  2. Write your observation.Quote SD26A/0247W at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
  4. Submit before 16 Nov 2026.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
R2
Existing residential
RES: To protect and/or improve residential amenitysouth dublin county development plan 2022 20288 Mar 2022 → 8 Mar 2028
R2
Existing residential
RES: To protect and/or improve residential amenitysouth dublin county development plan 2022 20288 Mar 2022 → 8 Mar 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: South Dublin County Council development plan zoning · fetched 11 Sept 2026, 23:18
SourceLicenceFetchedLink
South Dublin County Council development plan zoning—11 Sept 2026, 23:18open

Designations on or near the site within 100 m

  • NIAH-recorded building × 2
    house · Sky Lawn
  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
SD26A/0118WGrant permission15 Jul 2026489 mTwo bed, two/three storey, gable roof, end of terrace house with rooflights to front, dormer attic window to rear, new parking and widened shared vehicular access to front, and all associated works.
ED26/0041Declared not exempt2 Jun 2026359 mInstallation of a fixed canopy structure over the existing balcony. The structure is to be securely anchored to the external wall and supported by 2 posts at the outer edge where required. The roof covering will consist of translucent or lightly frosted polycarbonate panels, designed to provide weather protection while allowing natural light in. The system will include integrated rainwater management.
SD26A/0105WInvalid - site notice15 May 2026489 mTwo bed, two/three storey, gable roof, end of terrace house with rooflights to front, dormer attic window to rear, new parking and widened shared vehicular access to front, and all associated works.
SD26B/0028WGrant permission19 Mar 2026472 mSingle storey extension to the side of existing dwelling with all associated site works.
SD25A/0306WGrant permission18 Feb 2026307 mNew External Signage & Beer Wine Spirits Retail Off Licence subsidiary to main retail use
SD25B/0450WGrant permission3 Feb 2026371 mReconstruction of northern boundary wall to height of 2m, including plastering and wall cappings.
SD25A/0265WRefuse permission15 Dec 20251489 mA new two bed, two/three storey, gable roof, end of terrace house with rooflights to front, dormer attic window to rear, new parking and access to front/rear, new front garden gate, new vehicular access to side facing Cherrywood Villas and all associated works.
SD25B/0602WRefuse permission5 Dec 2025304 mThe construction of a new vehicular entrance and the change of use of a portion of the side garden to a residential driveway, Including all associated side works. Description of Proposed Development:- This application seeks permission for the formation of a new vehicular access point and the change of use of a portion of the side garden to a hardstanding driveway. The primary purpose of the development is to provide safe, convenient off-street parking for the residential property, thereby reducing on-street vehicle presence and improving overall site safety. The proposed works comprise: 1. New Vehicular Entrance & Dropped Kerb: The formation of a new vehicular crossover from the public roadway. This will involve the modification of the existing public footpath kerb to create a standard-width dropped kerb access point ("dishing"). The width will be precisely 2.9 m (or advised by council) to comfortably accommodate domestic vehicles while minimizing the impact on the footpath. 2. Change of Use: The formal change of use of a defined portion of the existing side garden from domestic amenity space to a hardstanding residential driveway. 3. Driveway Construction & Sustainable Drainage (Suds): The construction of the driveway within the property boundary will be executed as follows: Excavation and removal of topsoil and vegetation from the delineated area. Installation of a compacted, mechanically stabilized sub-base layer to ensure a stable and durable foundation that prevents settlement. Laying of a permeable surface using concrete block paving with a copper/charcoal finish. Crucially, the blocks will be laid on a permeable bedding layer (e.g., sharp sand) with jointing gaps to allow surface water to infiltrate the ground below. This design ensures compliance with Sustainable Drainage (Suds) principles by managing rainfall runoff at source and preventing increased pressure on public surface water sewers. 4. Dimensions:- 12m length x 3.5m width driveway to park 2 vehicles. Proposed vehicle entry 3.5m 5. Associated Site Works & Amenity Protection: Landscaping: Minor soft landscaping will be undertaken along the periphery of the new driveway to soften its appearance and integrate it with the remaining garden, strictly preserving the natural ambience and character of the estate. Access Control: The installation of a new double-leaf gate. The gate will be identical in design and material to the existing boundary fence for visual consistency and will be hung to open inwards onto the property, ensuring it does not encroach upon or pose a hazard to pedestrians on the public footpath. The proposed development will facilitate the installation of a dedicated electric vehicle (EV) charging point. This will support the charging of a hybrid electric vehicle at the property, reducing reliance on public charging facilities, to conserve fossil fuel and a step closer to achieving national energy target. Upon approval, this initiative will contribute to a more sustainable transport solution, with the potential to utilise off-peak electricity tariffs, thereby aligning with broader environmental objectives and energy demand management for the council, ESB and Eirgrid. The proposal is a modest, domestic-scale development that enhances the functionality of the property without altering the built footprint of the main dwelling. It is designed to be sympathetic in scale, materials, and design to the host property and the surrounding area.

What has happened on this file

  • 12 Oct 2026 New application · observations close 16 Nov 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 28 Oct 2026, 01:34. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.