PlanningRegister.ie
Observation pack · South Dublin County Council

Unit F, Priorsgate, Dublin 24

Change of use to a recreational special care facility (day service) with new signage to front and a new external ramp to existing side access with all internal modifications and all related works

Observations close 15 Dec 2026 19 days left
5 weeks from receipt (received 10 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 13 Jan 2027

The application

Reference
SD26A/0269W · full record
Authority
South Dublin County Council
Type
Permission
Status
REFERRAL
Floor area
224 m²
Site area
268 m²
Received
10 Nov 2026
Decision due
13 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/71414.
  2. Write your observation.Quote SD26A/0269W at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
  4. Submit before 15 Dec 2026.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
M2
Major town centre
VC: To protect, improve and provide for the future development of Village Centressouth dublin county development plan 2022 20288 Mar 2022 → 8 Mar 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: South Dublin County Council development plan zoning · fetched 11 Sept 2026, 23:18
SourceLicenceFetchedLink
South Dublin County Council development plan zoning—11 Sept 2026, 23:18open

Designations on or near the site within 100 m

  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument × 2
    Castle - tower house · R187890
  • OPW flood extent nearby floodinfo.ie
    Shown as a flag only — the OPW licence does not allow us to redistribute the extent.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
ED26/0113Declared not exempt16 Nov 2026380 mWe are planning to create some painted art on the wall of this building and the adjacent barbers shop. This forms part of a wider research project designed to improve responses to the impact of climate change on deaf and disabled people. https://sensing-climate.com/
WEB3293/26Further information10 Nov 2026474 mCHANGE OF USE: Cruisevale Limited intend to apply for permission for development at 1-3 High Street, Dublin 8, D08 R990. The development will consist of: a) The change of use of the existing building across all levels (lower ground floor to fourth floor level) from vacant office use to tourist hostel accommodation use; b) Internal demolition works and the reconfiguration of the existing vacant office building to accommodate a 35 no. bedroom tourist hostel (approx. 1,852 sqm) accommodating 224 no. bedspaces in a mixture of accessible and 3-12 no. person bedrooms from first to fourth floor level. c) The hostel development will comprise a reception / lobby area (with pedestrian access via the existing building entrance located off High Street) (approx. 109 sqm), luggage storage room (approx. 6 sqm), staff office (approx. 6 sqm), guest kitchen (approx. 24 sqm), guest dining room / lounge area (approx. 55 sqm), guest laundry facility (approx. 34 sqm) and staff lounge and changing rooms (approx. 49 sqm) all at ground floor level. Additional amenities including a bicycle store (approx. 16 sqm) providing for 20 no. bicycle parking spaces for guests and employees, plant room (approx. 32 sqm), storage (approx. 28 sqm), an ancillary BOH room (18 sqm) and a bin store (approx. 15 sq. m) will be provided at the lower ground floor level together with the introduction of a new fire exit along St. Michael's Close; d) The demolition of the rear car park boundary walls and railings and the construction of a 3-4 storey extension (approx. 570 sqm) to the rear of the existing building to accommodate 4 no. 2-bedroom residential apartment units located across the ground to third floor level, each with an associated private open space in the form of a balcony. Separate pedestrian access to the residential apartment units is proposed at lower ground floor level via St. Michael's Close. A bicycle store (approx. 30 sqm) providing for 11 no. bicycle parking spaces for residents, a plant room (approx. 20 sqm) and a residents bin store (approx. 11 sqm) will also be located on the lower ground floor level. The development will also provide for all associated site development works and infrastructure works including green roofs, roof plant, PV panels, boundary treatments, site services and connections for foul drainage, surface water infrastructure and water supply.
WEB3230/26Grant permission2 Nov 2026474 mCHANGE OF USE. The development will consist of change of use of existing first floor mezzanine storage within the warehouse to proposed office use for the HSSCU comprising a floor area of 90.4 sqm and provision of new bay window to the rear (North) facade facing on to Borris Court, and 9 number roof lights , the building is located in a conservation area and Liberties Strategic Development and Regeneration area (SDRA 16).
SD26B/0410Grant permission30 Oct 2026257 mSingle storey extended lounge extension to the front of the existing dwelling with a new extended tiled roof to match existing over: remove existing tiled roof to the side and form a new first floor extension over the external finishes to match existing: internal alterations and associated site works.
WEB3128/26Application declared invalid3 Sept 2026474 mThe development will consist of change of use of existing first floor mezzanine storage within the warehouse to proposed office use for the HSSCU comprising a floor area of 90.4 sqm and provision of new bay window to the rear (North) facade facing on to Borris Court, and 9 number roof lights , the building is located in a conservation area and Liberties Strategic Development and Regeneration area (SDRA 16).
SD26A/0040WGrant permission22 Jun 2026454 mThe proposed development will comprise the change of use of Unit 2 (c. 120 sq m) from retail to education/day centre, including all associated internal alterations.
SD26A/0019WGrant permission19 Mar 2026140 m2 number signs (1 main fascia sign & 1 menu sign) to the front elevation of the oriental take away business
SD25A/0053WGrant permission3 Feb 20263842 mIrish Residential Properties REIT PLC intends to apply for Planning Permission for development on a c.0.34 ha site formally known as Bruce House, Main Road, Tallaght, Dublin 24. The development will consist of the construction of a 6-storey residential building (c.2,792 sqm) comprising enclosed bicycle parking spaces, plant, bin stores, and an ESB substation at the ground floor level and 38 no. apartment units at the ground to fifth floor levels, including 4 no. 1-bedroom units, 34 no. 2-bedroom units, with private balconies/terraces. The development will also include the provision of car and bicycle parking spaces in the existing basement level of the adjoining mixed-use Priorsgate scheme to the south and west. Vehicle and pedestrian access to the site is provided from Old Blessington Road below. The development will include the removal of the existing boundary treatment between the Priorsgate development and the subject site to facilitate a pedestrian connection between the existing and proposed residential scheme. The development will also include piped infrastructure and ducting; roof plant including lift overrun; changes in level; attenuation areas; site landscaping; communal open space including a children's play space (c. 99 sqm) and all associated site development and excavation works above and below ground.

Appeals

ACP caseTypeOutcomeDecidedDistance
500879Planning AppealRefused30 Jun 202642 m
500367Planning Appealpending28 Nov 202592 m
318078Building Control - Fire Safety CertificateGranted with conditions18 Oct 2024452 m
316828LA Road Dev - ApplicationGranted with conditions17 Oct 202461 m
319167Planning AppealGranted with conditions24 Sept 2024112 m
315985Building Control - Fire Safety CertificateGranted with conditions22 Jan 2024452 m
316649Draft Map AppealOther18 Oct 2023184 m
315210Planning AppealOther6 Sept 2023358 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 10 Nov 2026 New application · observations close 15 Dec 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 25 Nov 2026, 23:00. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.