PlanningRegister.ie
Observation pack · South Dublin County Council

15 Tullyhall Green, Lucan, Co. Dublin, K78W254

Single-storey pitched-roof front extension incorporating a gable feature over the front entrance door, installation of three rooflights to the front roof slope, and widening of the existing vehicular entrance.

Observations close 13 Nov 2026 15 days left
5 weeks from receipt (received 9 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 3 Dec 2026

The application

Reference
SD26B/0457W · full record
Authority
South Dublin County Council
Type
Permission
Status
Referral
Applicant
not published by the national dataset — see the council register
Units
—
Floor area
10 m²
Site area
228 m²
Received
9 Oct 2026
We first saw it
28 Oct 2026, 01:34
Decision due
3 Dec 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/71175.
  2. Write your observation.Quote SD26B/0457W at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
  4. Submit before 13 Nov 2026.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
R2
Existing residential
RES: To protect and/or improve residential amenitysouth dublin county development plan 2022 20288 Mar 2022 → 8 Mar 2028
R2
Existing residential
RES: To protect and/or improve residential amenitysouth dublin county development plan 2022 20288 Mar 2022 → 8 Mar 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: South Dublin County Council development plan zoning · fetched 11 Sept 2026, 23:18
SourceLicenceFetchedLink
South Dublin County Council development plan zoning—11 Sept 2026, 23:18open

Designations on or near the site

  • Radon risk area × 2
    About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
ED26/0068Declared not exempt17 Aug 2026—116 mShed / Outhouse in rear garden - 25 sq.m in area.
SD26B/0297WGrant permission & grant retention7 Aug 2026—361 mAttic conversion with hip to gable roof to rear and dormer to side to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to both sides. Retention for extended vehicle access all with associated ancillary works.
ED26/0055Declared not exempt3 Jul 2026—119 mShed / Outhouse in rear garden - 25 Sq.m. in area.
SD26A/0109WGrant permission for retention25 Jun 2026—278 mThe relocation and amalgamation of previously permitted bike stores (Reg. Ref. [SD21A/0359]) to a revised location north of Block 2, together with all associated site works.
SD26B/0224WInvalid - site notice26 May 2026—361 mAttic conversion with hip to gable roof to rear and dormer to side to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to both sides. Retention for extended vehicle access all with associated ancillary works.
SDZ25X/0001Grant approval31 Mar 2026—114 mSOUTH DUBLIN COUNTY COUNCIL NOTICE PURSUANT TO SECTION 175 OF THE PLANNING AND DEVELOPMENT ACT, 2000 (AS AMENDED) APPLICATION TO AN BORD PLEANÁLA In accordance with Section 175 of the Planning and Development Act, 2000 (as amended) South Dublin County Council gives notice of its intention to make an application for approval to An Bord Pleanála under Section 175(3) of the Planning and Development Act, 2000 (as amended), to carry out development at lands cumulatively measuring c. 29.39 hectares, comprising three sites referred to as Site 3, Site 4, and Site 5, located predominantly within the Kishoge Development Area of Clonburris Strategic Development Zone (SDZ), in the townlands of Kishoge, Esker South, Grange, and Balgaddy, Clonburris, County Dublin. The proposed development at Sites 3, 4 and 5 broadly comprises the development of 1,252no. residential units in a mix of houses, duplexes, triplexes and apartments; 2no. childcare facilities; 1no. community building; retail uses; refurbishment works to Grange House for future reuse: - Site 3: Located within ‘Development Area 7- Kishoge North West’ and ‘Development Area 6- Kishoge Urban Centre’ of the Clonburris SDZ Planning Scheme and bounded generally by Lucan East Educate Together National School and Oldbridge housing estate to the north; Tullyhall residential housing estate to the west; Adamstown Avenue and Kishoge train station and Dublin-Cork rail line to the south; and, Grange Castle Road (R136) to the east. The proposed development at Site 3 comprises the construction of 580no. dwellings, including 130no. 2-storey 3-bedroom houses; 15no. 3-storey 3-bedroom houses; 76no. apartment units (32no. 1-bedroom, 36no. 2-bedroom and 8no. 3-bedroom) accommodated in 2no. 5-storey apartment buildings with balconies on all elevations; 356no. duplex units (108no. 1-bedroom, 115no. 2-bedroom, and 133no. 3-bedroom) and 3no. 3-bedroom triplex units accommodated in 24no. 3-storey duplex blocks, with balconies on rear and/or front elevations. 1no. 2-storey childcare facility (c.553 sq. m). And all associated and ancillary site development, landscape and boundary works, including public open space (c. 7,015 sq. m) and communal open space (c. 3,079sqm); 456no. surface car parking spaces (total); 1,116no. bicycle parking spaces (total); 7no. ESB substations; and the diversion and rerouting of ESB 10KV and 38KV cabling; public lighting. New vehicular site, pedestrian and cycle access to Site 3 is proposed from existing Adamstown Avenue, the consented Northern Link Street (SDZ24A/0033W) and from the existing site entrance at Tullyhall Rise. New pedestrian access is proposed via the permitted green link (SDZ24A/0033W) adjacent to Lucan East Educate Together National School to the north and via the existing public open space at Rossberry Park to the north east. Site 4: Located within ‘Development Area 8- Kishoge South West’ of the Clonburris SDZ Planning Scheme and bounded to the north by the Dublin-Cork rail line, to the west by Griffeen Valley Park extension, by a linear park permitted under SDCC Reg. Ref. SD228/0003 to the east and the Grand Canal corridor to the south. The proposed development at Site 4 comprises the construction of 436no. dwellings, including 141no. houses (133no. 3-bedroom and 8no. 4-bedroom) ranging from 2 to 3-storeys in height; 124no. apartment units (62no. 1-bedroom and 62no. 2-bedroom) accommodated in 3no. apartment buildings ranging from 4 to 6-storeys in height, with balconies/terraces on all elevations; 106no. duplex units (53no. 2-bedroom and 53no. 3-bedroom) and 57no. 2-bedroom triplex units accommodated in 19no. 3-storey duplex blocks, with a combination of rear gardens, and balconies/ terraces on all elevations; 3no. 1-bedroom age-friendly apartments accommodated in a 1-storey apartment building, with a rear courtyard garden; 5no. 2-bedroom garden apartments accommodated in a 1 to 2-storey apartment building with a front and rear courtyard garden. 1no. childcare facility (c. 544 sqm) and 1no. retail unit (c. 150 sqm) at ground floor of apartment Block F and 1no. community building/ pavilion (c. 683 sq m), all fronting Griffeen Valley Park; and, proposed refurbishment of existing Grange House for employment reuse (c. 173 sq m). And all associated and ancillary site development, landscape and boundary works, including public open space (c. 778 sqm) and communal open space (c. 1,621 sqm); 408no. surface car parking spaces (total); 793no. bicycle parking spaces (total); 3no. ESB substations and 5no. ESB substation kiosks; public lighting; bin stores; demolition of existing outbuildings associated with Grange House (c. 118.0sqm) and isolated buildings (c. 98.0sqm). New vehicular, pedestrian and cycle access to the site is proposed from the permitted Southern Link Road (SDZ20A/0021). Site 5: Primarily located within Development Area 6- Kishoge Urban Centre and Development Area 10- Kishoge North East of the Clonburris SDZ Planning Scheme. Site 5 consists of two parcels (5a & 5b) located to the north of Kishoge Train Station and east of the R136 roundabout, intersected by Thomas Omer Way. One parcel is bounded by the Foxborough and Omer Walk housing estates to the north, Griffeen Community College and Thomas Omer Way to the south, and the second parcel is bounded by Thomas Omer Way to the north, Lynch’s Lane to the east and Grange Castle Road (R136) to the west. The eastern portion of Site 5b lies outside of the Clonburris SDZ Planning Scheme area. The proposed development at Site 5 will consist of: the construction of 236 no. residential units comprising 35 no. 2-storey 3-bedroom houses; 110 no. 3-storey duplex units (53 no. 2-bedroom and 57 no. 3-bedroom); 33 no. 3-storey 2-bedroom triplex units; and 58 no. apartments (37 no. 1-bedroom and 21 no. 2-bedroom) in a 6-storey over basement apartment block. And all associated and ancillary site development, landscape and infrastructural works, including: public open space (3,101 sq.m); communal open space (332 sq.m) to serve the apartment building; balconies/terraces for the apartments and duplex/triplex units; 219 no. car parking spaces (total); 628 no. bicycle parking spaces (527 no. resident spaces and 101 no. visitor spaces); ESB substation, public lighting, boundary treatments, waste storage areas, drainage and open attenuation ponds. To facilitate development, it is proposed to remove a section of the concrete noise barrier along Thomas Omer Way (within the Site 5 boundary only) and remnants of derelict structures and hardstand on lands to the south of Thomas Omer Way. Vehicular, pedestrian and cycle access to the parcel in the south will be from Thomas Omer Way via a new left-in-left-out junction at Lynch’s Lane and from the R136 via the permitted Northern Link Street (granted under Reg. Ref. SDZ24A/0033W). Vehicular, pedestrian and cycle access to the north parcel will be from Thomas Omer Way via a new signalised junction. New pedestrian connections are facilitated to the Foxborough and Omer Walk residential estates. This application is being made in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme, as defined by Statutory Instrument No. 604 of 2015. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application documentation including the Environmental Impact Assessment Report may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy) during public opening hours from Tuesday 03 June 2025 to Monday 14 July 2025 at the following locations: The Office of An Bord Pleanála, 64 Marlborough Street, Dublin 1, D01 V902 (between 9.15am and 5.30 pm Monday to Friday); South Dublin County Council, County Hall, Town Centre, Tallaght, Dublin 24 (between 9:00am to 4:00pm., Monday to Friday); The application (including EIAR) may also be viewed/downloaded on the following website: www.kishoge-part10.com. Submissions or observations may be made in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1, D01 V902 on payment of the prescribed fee of €50 within 6-weeks of receipt of the application by An Bord Pleanála (submissions or observations may also be made through the Board’s website at the following address https://www.pleanala.ie/en-IE/Observation-on-a-strategic-Infrastructure-devel) to be received on or before 5.30 p.m. Monday 14 July 2025 relating to: (i) The implications of the proposed development for proper planning and sustainable development of the area in which the proposed development is concerned; and (ii) The likely effects on the environment of the proposed development, if carried out. An Bord Pleanála may give approval to the application for development with or without conditions or may refuse the application for development. A person may question the validity of any such decision by An Bord Pleanála by way of an application for judicial review under Order 84 of the Rules of the Superior Courts (S.I. No. 15 of 1986, as amended), in accordance with section 50 of the Planning and Development Act, 2000 (as amended). Practical information on the judicial review mechanism can be accessed under the heading Legal Notices – Judicial Review Notice on the An Bord Pleanála website www.pleanala.ie or on the Citizens Information website www.citizensinformation.ie
SD25B/0606WGrant permission24 Nov 2025—19 mAttic conversion with dormer window to the rear. Flat-roof porch extension to the front. Single-storey flat-roof extension to the rear. Installation of two garden rooms to the rear of the property with a pergola linking both.
SD25B/0547WGrant permission29 Oct 2025—442 mThe development will consist of: the construction of a single-storey outbuilding in the rear garden, with a footprint of 35 sq.m, for use as a home office and amenity space.

Appeals

ACP caseTypeOutcomeDecidedDistance
323650Amend Planning Schema/Add Planning Schemapending15 Sept 2025108 m
322487Planning AppealInvalid9 May 2025429 m
316119Railway Order ApplicationOther13 Nov 202482 m
314272Planning AppealGranted with conditions7 Mar 2024278 m
312496Planning AppealRefused29 Jul 2022456 m
312478Planning AppealGranted with conditions3 May 2022492 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 9 Oct 2026 New application · observations close 13 Nov 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 28 Oct 2026, 01:34. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.