9 Haydens Park Way, Lucan, Co. Dublin, K78X5Y6
Hip build up into dutch hip at attic level with window in gable wall at attic level. Dormer roof window on rear slope of roof. Dormer roof window & 2No. roof lights on front slope of roof all at attic level. Attic conversion with w.c.. First floor internal alterations
The application
- Reference
- SD26B/0461W · full record
- Authority
- South Dublin County Council
- Type
- Permission
- Status
- Valid
- Floor area
- 16 m²
- Site area
- 230 m²
- Received
- 12 Oct 2026
- Decision due
- 7 Dec 2026
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/71187.
- Write your observation.Quote
SD26B/0461Wat the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
- Submit before 16 Nov 2026.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| R2 Existing residential | RES: To protect and/or improve residential amenity | south dublin county development plan 2022 2028 | 8 Mar 2022 → 8 Mar 2028 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: South Dublin County Council development plan zoning · fetched 11 Sept 2026, 23:18
| Source | Licence | Fetched | Link |
|---|---|---|---|
| South Dublin County Council development plan zoning | — | 11 Sept 2026, 23:18 | open |
Designations on or near the site within 100 m
- Radon risk area × 2About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Distance | Description |
|---|---|---|---|---|
| ED26/0068 | Declared not exempt | 17 Aug 2026 | 159 m | Shed / Outhouse in rear garden - 25 sq.m in area. |
| SD26B/0297W | Grant permission & grant retention | 7 Aug 2026 | 235 m | Attic conversion with hip to gable roof to rear and dormer to side to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to both sides. Retention for extended vehicle access all with associated ancillary works. |
| SD26B/0263W | Grant permission | 10 Jul 2026 | 489 m | Conversion of existing attic space comprising of modification of existing roof structure; raising of existing gable c/w window, new access stairs; 2no. roof windows to the front and flat roof dormer to the rear. |
| ED26/0055 | Declared not exempt | 3 Jul 2026 | 160 m | Shed / Outhouse in rear garden - 25 Sq.m. in area. |
| SD26A/0109W | Grant permission for retention | 25 Jun 2026 | 316 m | The relocation and amalgamation of previously permitted bike stores (Reg. Ref. [SD21A/0359]) to a revised location north of Block 2, together with all associated site works. |
| SD26B/0224W | Invalid - site notice | 26 May 2026 | 235 m | Attic conversion with hip to gable roof to rear and dormer to side to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to both sides. Retention for extended vehicle access all with associated ancillary works. |
| SD26B/0143W | Grant permission | 18 May 2026 | 436 m | Construction of single storey extension to the side of existing dwelling comprising of family room, bedroom with en-suite and all associated site works. Pedestrian access from Griffen Dene. |
| SD25A/0187 | Grant permission | 18 May 2026 | 488 m | For the continued use for a period of 3 years of the existing 30 metre high, free-standing lattice communications structure carrying associated communications equipment to be shared with third party operators, all within at 2.4m high palisade compound following parent permission SD23A/0033. The proposed development is located within the Clonburris Strategic development zone |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 323650 | Amend Planning Schema/Add Planning Schema | pending | 15 Sept 2025 | 253 m |
| 322164 | Planning Appeal | Granted with conditions | 25 Jul 2025 | 398 m |
| 316119 | Railway Order Application | Other | 13 Nov 2024 | 226 m |
| 320895 | Planning Appeal | Invalid | 25 Sept 2024 | 397 m |
| 314272 | Planning Appeal | Granted with conditions | 7 Mar 2024 | 316 m |
| 312478 | Planning Appeal | Granted with conditions | 3 May 2022 | 356 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 12 Oct 2026 New application · observations close 16 Nov 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 28 Oct 2026, 01:34. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.