PlanningRegister.ie
Observation pack · South Dublin County Council

3a Mill Lane, Palmerstown, Dublin 20

The proposed development will consist of the construction of a single storey rear extension with flat roof to the currently derelict property. The property is located in an ACA (Architectural Conservation Area)

Observations close 9 Dec 2026 13 days left
5 weeks from receipt (received 4 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 7 Jan 2027

The application

Reference
SD26B/0491W · full record
Authority
South Dublin County Council
Type
Permission
Status
REFERRAL
Floor area
54 m²
Site area
359 m²
Received
4 Nov 2026
Decision due
7 Jan 2027

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/71376.
  2. Write your observation.Quote SD26B/0491W at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
  4. Submit before 9 Dec 2026.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
G3
High amenity
HA-LV: To protect and enhance the outstanding character and amenity of the Liffey Valleysouth dublin county development plan 2022 20288 Mar 2022 → 8 Mar 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: South Dublin County Council development plan zoning · fetched 11 Sept 2026, 23:18
SourceLicenceFetchedLink
South Dublin County Council development plan zoning—11 Sept 2026, 23:18open

Designations on or near the site within 100 m

  • NIAH-recorded building × 5
    house · house · graveyard/cemetery
  • Radon risk area × 3
    About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels · About 1 in 5 homes in this area is likely to have high radon levels
  • Recorded monument × 3
    Church · Graveyard · R149610

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
SD26B/0381WGrant permission15 Oct 2026472 mConversion of the existing attic with provision 1no. window at attic level to the gable side and to alter the existing hipped roof profile to a gable wall profile and for all associated site works.
FW26A/0301EGrant permission15 Sept 2026397 mThe development will consist of the placement of a portakabin structure to the rear of the school buildings at Scoil Mhuire Mount Sackville for use incidental to the enjoyment of the school and associated activities, and all associated site works and services.
SD26B/0192WGrant permission15 Jun 2026441 mConstruction of one dormer window in the main roof to the rear, amending existing hipped roof to a gable roof including a small hip with a gable window at attic level and the demolition of the existing chimney at the gable wall.
SD26B/0200WWithdraw the application11 May 2026441 mConstruction of one dormer window in the main roof to the rear alongside amending the existing hipped roof to a gable roof including a small hip with a gable window at attic level and the demolition of the existing chimney at the gable wall.
SD26B/0185WWithdraw the application22 Apr 2026441 mThe development seeking permission will consist of the construction of one dormer window in the main roof to the rear alongside amending the existing hipped roof to a gable roof including a small hip and a gable window at attic level.
SD26B/0058WGrant permission2 Apr 2026461 mAlterations to existing hipped roof to form mini-hipped roof with raised gable to provide access to converted attic space to non-habitable space; obscure window to side, 2no. roof lights to the front, a roof light and dormer window to rear with all associated site works.
SD25A/0278WGrant permission16 Jan 202639 mModifications to the existing training centre building, including the replacement of two existing side windows with new fire escape doors and the installation of access ramps to accommodate level changes, and all associated site works necessary to facilitate the development
SD25B/0643WGrant permission16 Jan 2026442 mThe development consists of; a) conversion of the existing garage into a new ground floor bedroom including a new bay window to the front; b) demolition of the existing single story extension at the rear of the dwelling including a kitchen, WC and boiler house; c) replacement of the existing shared boundary hedge at the front of the dwelling with a new shared boundary wall in agreement with the affected neighbours; d) replacement of the existing shared boundary hedge at the rear of the dwelling with a new shared boundary wall in agreement with the affected neighbours; e) construction of a new single storey extension to the rear of the dwelling incorporating a new kitchen area, living area, sitting area and home workspace and; f) widening of the existing vehicle entrance to 3.5meters wide. All of the above together with associated site works.

Appeals

ACP caseTypeOutcomeDecidedDistance
322002Planning AppealRefused23 Jun 2025433 m
314942LA Road Dev - ApplicationGranted with conditions29 Aug 2024395 m
318546Planning AppealWithdrawn5 Dec 2023408 m
311103Planning AppealGranted with conditions9 Dec 2021455 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 4 Nov 2026 New application · observations close 9 Dec 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 25 Nov 2026, 23:00. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.