PlanningRegister.ie
Observation pack · South Dublin County Council

Studio, Kilakee Road, Rathfarnham, Dublin 16, D16H592

Removal of 1No. chimney from main roof & 1No. chimney from single storey rear extension. Removal of 2No. roof lights from front slope & 2No. roof lights from rear slope of roof at attic level. Removal of external timber stairs to attic room from north elevation, Demolition of ground floor glazed front porch from east elevation & ground floor glazed sunroom from south elevation. Ground floor internal alterations. Alterations to existing ground floor rear extension to create family flat of 37m sq. 3No. dormer roof windows & 2No. Velux roof lights on east elevation roof at attic level. 1No dormer roof window & 1No. roof light on west elevation roof at attic level. Internal alterations to attic level. Balcony on north elevation at attic level. Alterations to window & door layouts on south, west & east elevation at ground floor level & south elevation at attic level. Upgrade of existing septic tank to waste water treatment system, percolation area & all associated site works

Observations close 7 Jan 2027 42 days left
5 weeks from receipt (received 24 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
SD26B/0518W · full record
Authority
South Dublin County Council
Type
Permission
Status
REGISTERED APPLICATION
Floor area
27 m²
Site area
6.44 ha
Received
24 Nov 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/southdublin/application-details/71475.
  2. Write your observation.Quote SD26B/0518W at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. South Dublin County Council takes it online with the submission or at the counter.
  4. Submit before 7 Jan 2027.Online through the register above, or in writing to the Planning Department, South Dublin County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
G3
High amenity
HA-DM: To protect and enhance the outstanding natural character of the Dublin Mountains Areasouth dublin county development plan 2022 20288 Mar 2022 → 8 Mar 2028
P1
Rural
RU: To protect and improve rural amenity and to provide for the development of agriculturesouth dublin county development plan 2022 20288 Mar 2022 → 8 Mar 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: South Dublin County Council development plan zoning · fetched 11 Sept 2026, 23:18
SourceLicenceFetchedLink
South Dublin County Council development plan zoning—11 Sept 2026, 23:18open

Designations on or near the site within 100 m

  • Radon risk area × 3
    About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 5 homes in this area is likely to have high radon levels · About 1 in 5 homes in this area is likely to have high radon levels
  • Recorded monument × 1
    Cursus

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
ED26/0109Cannot determine4 Nov 2026433 mWhether the identified physical works and operations actually undertaken at Hellfire / Montpelier Hill and Massy's Wood, within the area shown on the accompanying map and associated with the Dublin Mountains Visitor Centre project and related site works from 2024 onwards, constitute development and, if so, whether they constitute exempted development. The request concerns actual physical operations, not activities merely contemplated or announced. The statutory classification is sought by reference to the nature and substance of the operations rather than the descriptions given to them by the project promoters or contractors.
SD25A/0334WDeclared withdrawn13 Jan 2026103 mThe demolition of existing dormer bungalow & associated single storey storage sheds; the provision of a new two storey detached dwelling and separate single storey garage; along with the provision of a new wastewater treatment system and all associated site works
SD24B/0266WGrant permission6 Nov 2024434 mThe demolition of an existing bedroom extension and creation of a single storey extension, including mezzanine, providing living, kitchen, dining and bedroom accommodation. The removal of the existing rear flat roof and part removal of the existing pitched roof and replacement with a new pitched roof with internal alterations to the existing house to create a master bedroom suite and all associated external alterations
SD23B/0465Grant permission & grant retention5 Jan 2024247 mThe Development requiring permission will consist if Construction of new dormer window to the front at attic level. Modifications to facades and internal layout and all associated ancillary Landscaping and site development works. The development requiting retention permission Weill consist of retention of the existing single storey detached garden storage to the front. Retention of the existing two storey detached ancillary recreational building to the rear. Retention of the existing storey porch to the ide. Retention of the retaining walls to the rear and sides
SD23B/0460Grant permission & grant retention15 Dec 202314 mRetention permission consists of the construction of a single-storey extension to the south-east and south-west of the existing main house. The development requesting permission consists of the construction of a first-floor extension over existing ground-floor extension to the south-east and south-west of the existing main house as well as the construction of two single-storey porches to the south-west of the main house.
SD22B/0491Grant permission12 Jan 2023274 mPart demolition and reconfiguration and extension of an existing family dwelling (c.228sq.m, single-storey (over lower ground floor) to the front and two-storey to the rear) to form a larger (c.485sq.m, up to two-storey over lower ground floor to the front and three-storey to the rear) family home. The overall height (measured to the existing chimney) will remain unchanged; The development includes: the retention of part of the existing dwelling's external fabric with an up to three-storey extension towards the east of the property; internal remodelling including the addition of a first­floor level within the sloped roof to the rear, both with dormer windows to give daylight to the new floor area; The development includes remodelling of house entrance levels to facilitate access by wheelchair and wheelchair adapted vehicles.
SD22B/0405Grant permission7 Nov 2022428 mThe development will consist of changes to the existing dwelling including: (a) removal of existing kitchen window replaced with a larger kitchen window to the front elevation on the first floor. (b) upgrade works to the existing bay window on the front elevation on the first floor incorporating a new standing metal fascia and soffit. (c) removal of the existing chimney on the side elevation (d) removal of the existing sliding door on the rear elevation replaced with a new window and (e) the removal of the existing window on the rear elevation, replace with a larger door all together with associated site works.
SD22B/0467Invalid application4 Nov 2022274 mPart demolition and reconfiguration and extension of an existing family dwelling (c.228sq.m, single-storey (over lower ground floor) to the front and two-storey to the rear) to form a larger (c.485sq.m, up to two-storey over lower ground floor to the front and three-storey to the rear) family home; The overall height (measured to the existing chimney) will remain unchanged; The development includes: the retention of part of the existing dwelling's external fabric with an up to three-storey extension towards the east of the property; Internal remodelling including the addition of a first­floor level within the sloped roof to the rear, both with dormer windows to give daylight to the new floor area; The development includes associated site development and landscaping works above and below ground.

What has happened on this file

  • 24 Nov 2026 New application · observations close 7 Jan 2027

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 25 Nov 2026, 23:00. Not legal advice — confirm the deadline with South Dublin County Council before relying on it.