Rathlee , Easkey , Co. Sligo
The development consists of 1. Construction of new Community Centre. 2. Installation of onsite wastewater treatment system and percolation area. 3. Provide disabled compliant car parking bay and general parking to the proposed Community Centre by extending existing Church car park. 4. Carryout all associated and ancillary works.
The application
- Reference
- 2660337 · full record
- Authority
- Sligo County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 2,603 m²
- Received
- 24 Aug 2026
- We first saw it
- 18 Sept 2026, 15:44
- Decision due
- 18 Oct 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/SligoCC/AppFileRefDetails/2660337/0.
- Write your observation.Quote
2660337at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Sligo County Council takes it online with the submission or at the counter.
- Submit before 28 Sept 2026.Online through the register above, or in writing to the Planning Department, Sligo County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660290 | Conditional | 3 Sept 2026 | 1 | 400 m | Construct new dwelling house, proprietary effluent treatment plant and percolation area, together with all associated site works |
| 2460212 | Conditional | 8 Aug 2024 | 0 | 78 m | The development shall consist of the following: Removal of existing glazed porch and replace with new block-built porch. with lean-to roof and rooflight, finish to match existing. Proposed rear extension with flat roof and lean-to roof. Replace defective flat roof covering with new membrane anthracite grey in colour. Provision of new rooflights to existing flat roof. Alterations to rear elevation including removal of existing windows and portion of blockwork to provide new windows and door. Removal of existing internal walls fireplace and chimney. Addition of new pitched roof on roadside elevation in place of existing flat roof. |
| 22140 | Conditional | 9 Jun 2022 | 0 | 226 m | Development consisting of recessing existing roadside boundary - facilitating the construction of car parking/set down area. Proposed works will consist of: (1) the removal of existing roadside boundary wall; (2) construction of car parking/set down areas; (3) construction of new recessed boundary wall and pedestrian footpath; (4) carrying out of all associated ancillary site works |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 24 Aug 2026 New application · observations close 28 Sept 2026
- 24 Aug 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Sligo County Council before relying on it.