Kingsbridge Private Hospital Sligo , Gardenhill Ray Macsharry Road , College Road Sligo

(i) the installation of a modular relocatable building unit which contains a CT scanner machine and associated rooms, (ii) the construction of an ancillary modular building to accommodate the associated patient and staff spaces, with linking structure between the two and (iii) all ancillary associated site development works at Kingsbridge Private Hospital Sligo, Gardenhill, Ray Macsharry Road, College Road, Sligo, F91 X054.

Observations close 23 Oct 2026 window closed
5 weeks from receipt (received 18 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 12 Nov 2026

The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.

The application

Reference
2660385 · full record
Authority
Sligo County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
587 m²
Received
18 Sept 2026
We first saw it
29 Sept 2026, 23:03
Decision due
12 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/SligoCC/AppFileRefDetails/2660385/0.
  2. Write your observation.Quote 2660385 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Sligo County Council takes it online with the submission or at the counter.
  4. Submit before 23 Oct 2026.Online through the register above, or in writing to the Planning Department, Sligo County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
S3
Community infrastructure
CF – community facilities: Objective: Protect existing facilities or retain existing uses and provide for the establishment of new/additional community and institutional uses, such as schools, community centres, health centres etc.sligo county development plan 2024 203011 Nov 2024 → 11 Nov 2030

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Sligo County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Sligo County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site

  • NIAH-recorded building × 1
    Saint Michael's

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2560390Conditional10 Sept 20260305 m(a) change of use from a retail unit to a bakery, (b) retain elevational changes to side and rear of existing building, together with all ancillary site works and services
2660123Conditional19 May 20260476 mchange of use from restaurant to office
2560246Conditional19 Jan 20260385 mBus Eireann parking yard, Michael Conlon Road (n4) , rathedmond, sligo town, co. sligo. this application relates to a proposed development adjoining the curtilage of protected structures listed as RPS 101SE and 218SE in the record of protected structures. The development will consist of the proposed extension of the existing bus parking yard and the re-development of the existing yard to provide in total 20 no EV charging bays, 20 no parking bays for coaches for 15m long coaches., 40 no bus bays on site in total. provision of 9 no staff car parking spaces, and all associated siteworks. The yard extension is approximately 0.4092 hectares. the proposal will also include 1no 15m x 3.74m free-standing single-storey prefabricated insulated metal clad steel structure 56 square metres comprising of electrical equipment rooms to the western side of the site. We also propose to construct a single storey ESB sub-station together with MV and LV rooms to the western boundary of the site; c43.5 square metres together with various siteworks to include yard lighting, charging pedestal guns, public lighting standards. access will be primarily via the Michael Conlon road. We also seek permission to construct a single storey modular building for staff accommodation c. 96 sq m. New boundary treatment to include new powder coated painted steel palisade fencing to the western and southern boundaries. This proposal also seeks to connect into public mains sewer.
2560477Conditional15 Jan 20260141 m(1) to construct a new two storey building, turnstiles and plaza along Church Hill Road, and (2) to make amendments to previously granted planning permission PL22/400 for development. The new development will consist of the demolition of existing turnstiles and adjoining building, the construction of a two-storey structure (circa 1,230sqm) comprising offices and club facilities, the provision of a single storey turnstile structure and a public plaza at the Stadium Entrance off Church Hill Road. The proposed amendments to previous permission PL22/400 consist of (1) Layout changes and revised elevations to the new Church Hill Road Spectator Stand, (2) Layout changes and revised elevations to the new Jinks Avenue Spectator Stand, (3) Omission of the previously proposed roof to the Railway End Stand, and (4) Layout changes to the existing Treacy Avenue Stand. The development will also consist of the reconfiguration of existing carparking and the relocation of pedestrian access gate, together with minor associated amendments to site works, services, signage, bicycle parking, and the provision of flagpoles and pitch side LED boards and screens
2560449Conditional18 Dec 20250445 m(1) Extension and change of use from existing light industrial (timber storage warehouse) to recreational facility including provision of new changing facilities/toilets, storage room, cleaning store, office reception and 7 internal and 3 external padel ball courts. (2) Replace existing building signage to north elevation and provision of signage to west elevation. (3) Reposition the existing builder's yard entrance, including the installation of a new fence within the existing builder's yard. Provide new car parking and cycle spaces including all associated site works
2560446Conditional17 Dec 2025186 mto demolish a ground floor extension to rear of an existing house, construction of a two storey extension to the rear of the existing house and construction of roof windows to the front and rear of the existing house, including all associated site works & services
2560099Conditional3 Nov 20250476 mthe change of use from commercial to residential use, to include the demolition of a fully derelict existing two-storey rear extension and construction of a new two-storey extension, alongside the renovation of the existing building and the creation of a new dormer extension within the rear roof slope of the existing building, all to provide 3 new residential dwellings comprising 1 x 2-bedroom unit, 1 x 1-bedroom duplex unit, and 1 x 1-bedroom unit, with all ancillary and associated site development works
2560244Conditional23 Sept 20252470 mPermission for change of use of existing vacant property from previously permitted use as a retail unit to use as a residential dwelling house and construction of part 2-storey and part single storey extension to the rear with demolition of existing rear single storey section of property, construction of new rear courtyard and rear boundary wall and all associated works

Appeals

ACP caseTypeOutcomeDecidedDistance
500229—Granted18 Mar 2026476 m
323308—Other11 Nov 2025262 m
323321—Withdrawn18 Aug 2025477 m
320387—Other23 Sept 2024276 m
316908—Other14 Aug 2023262 m
314307—Granted with conditions30 Jun 2023321 m
309143—Other17 May 2022189 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 18 Sept 2026 New application · observations close 23 Oct 2026
  • 18 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 29 Sept 2026, 23:03. Not legal advice — confirm the deadline with Sligo County Council before relying on it.