Observation pack · Sligo County Council

Ballyweelin , Rosses Point , Sligo

1. Construction of a two-storey dwelling house, 2. Provision of a new site entrance via an existing private laneway, 3. Provision of new tertiary wastewater treatment system, 4. And all associated site works

Observations close 29 Oct 2026 1 day left
5 weeks from receipt (received 24 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 18 Nov 2026

The application

Reference
2660392 · full record
Authority
Sligo County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
1
Floor area
0 m²
Site area
2,975 m²
Received
24 Sept 2026
We first saw it
29 Sept 2026, 23:03
Decision due
18 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/SligoCC/AppFileRefDetails/2660392/0.
  2. Write your observation.Quote 2660392 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Sligo County Council takes it online with the submission or at the counter.
  4. Submit before 29 Oct 2026.Online through the register above, or in writing to the Planning Department, Sligo County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660230Conditional7 Aug 20261172 mconstruction of a two-storey dwelling house, a proprietary effluent treatment system, and all associated site works, including the use of the existing site entrance
2660120Conditional12 May 20260297 m- Retention Permission for extensions to existing dwelling and material alterations as constructed,- Retention of 1 domestic garden steel storage shed as constructed with a gross area of 14.35m2 located to north-east of existing dwelling along with ancillary works. Previous Planning Register Number: PL6400/76 -CONDITION NO. 4 COMPLIED WITH
2660075Conditional17 Apr 20260112 mto build a domestic shed
2560478Conditional15 Jan 2026139 mthe construction of a new single storey dwelling with a tertiary wastewater treatment system, a new site entrance off an existing private laneway, and all associated site works
2560242Conditional28 Jul 20251163 mPermission for retention of sunroom extension constructed to the side of existing dwelling house, Permission for retention of domestic shed constructed on site and all associated works
2460185Conditional30 May 20251210 mThe proposed development consists of the construction of a 2 story domestic dwelling with new residential entrance, detached garage and shed, wastewater treatment system with polishing filter and all associated site works
2560079Conditional16 Apr 20251133 mPermission for retention of bay window and porch constructed to the front of existing dwelling house and all associated works
2560067Conditional15 Apr 20251234 mretention of existing dwelling house and all associated works which differs in plan and elevation from that permitted under PL 74/4703. The development consists of an existing structure to be retain which serves as a residential single family dwelling with all associated works

Appeals

ACP caseTypeOutcomeDecidedDistance
322827—Granted with conditions20 Oct 2025210 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 24 Sept 2026 New application · observations close 29 Oct 2026
  • 24 Sept 2026 Decision