42/43 Main Street , Cashel , Co. Tipperary

The removal/deconstruction of an external bar and canopy structure to the rear yard, and RETENTION PERMISSION for 1) combining two public houses into one public house, and 2) constructing toilet facilities associated with public house, including all associated site development works

Observations close 2 Dec 2026 16 days left
5 weeks from receipt (received 28 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 22 Dec 2026

The application

Reference
26155 · full record
Authority
Tipperary County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
480 m²
Received
28 Oct 2026
Decision due
22 Dec 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/26155/0.
  2. Write your observation.Quote 26155 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
  4. Submit before 2 Dec 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • NIAH-recorded building × 13
    Cashel Courthouse · school · Cashel Garda Síochána Station
  • Recorded monument × 11
    R135763 · Prison · House - 18th/19th century

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2561169Conditional9 Jun 2026390 mdemolish existing outbuildings to rear of premises & construct a new storage shed together with all associated site works
2639Conditional28 May 2026340 ma change of use of part of the first floor of the property, from private residential to an Airbnb including all associated site development works
2660273Conditional15 May 2026350 ma) the construction of an extension to the rear of the hall consisting of a kitchen area and WCs and store, b) permission to demolish existing kitchen and store with all associated and ancillary site works
2660036Conditional13 Mar 2026234 mchange of use of existing commercial unit, no 9, to a residential unit and all associated site works
2660006Conditional2 Mar 2026382 mdevelopment at protected structure consisting of works to (1) the main roof, (2) the external rear walls, (3) the front door, (4) the rear bay-window, (5) the internal non-structural remodelling of ground floor kitchen and back-kitchen areas as per the architects drawing, (6) the existing dilapidated first floor joists over garage (bedroom 2,3) to be repaired - made level where dropped and new wall plate installed to conservation appropriate detail and floor over unheated garage to be insulated between and under joists as per the architects drawings, (7) all existing internal electrical system to be carefully removed and replaced, (8) and existing internal plumbing to be removed and replaced
2561259Conditional4 Feb 2026328 mchange of use of dwelling house to short term rental holiday accommodation. PERMISSION TO RETAIN concrete slab for parking at the rear of the dwelling and permission to retain modifications to the rear entrance and associated site works
2561229Conditional28 Jan 202693 mchange of use from domestic dwelling to bed and breakfast (a protected structure)
2560821Conditional13 Oct 2025425 ma veranda to rear façade of dwelling, two domestic sheds and all associated works

Appeals

ACP caseTypeOutcomeDecidedDistance
324444Withdrawn4 Sept 2026337 m
319489Granted with conditions22 Oct 2024403 m
318035Refused20 Jun 202443 m
317161Invalid23 May 202343 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 28 Oct 2026 New application · observations close 2 Dec 2026
  • 28 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Tipperary County Council before relying on it.