PlanningRegister.ie
Observation pack · Tipperary County Council

12 Glen Carrig , Two Mile Borris , Thurles

unauthorised development consisting of: 1) construction of rear utility room, 2) sunroom to side of dwelling, 3) attic conversion to storage area, 4) domestic garage, together with all associated works

Observations close 21 Sept 2026 closes today
5 weeks from receipt (received 17 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 11 Oct 2026

The application

Reference
2660799 · full record
Authority
Tipperary County Council
Type
RETENTION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
2,627 m²
Received
17 Aug 2026
We first saw it
18 Sept 2026, 15:44
Decision due
11 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2660799/0.
  2. Write your observation.Quote 2660799 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
  4. Submit before 21 Sept 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660229Conditional14 May 20260397 mthe construction of an extension to the side of the dwelling with all associated and ancillary site works
2660066Conditional18 Mar 20260146 mthe relocation of the vehicular entrance serving existing dwelling house. Planning permission is also being sought for the demolition of existing shed to rear of property, relocation of the rear boundary to increase the site size, construction of a single storey extension to rear of house with a new domestic garage and covered carport, alterations to existing house to include new & altered windows to the north, east and west elevations along with associated internal alterations of the layout of the existing house together with all associated site works
2560716Conditional2 Mar 202643 mthe following works; a) 4no. single storey detached dwellings; b) alterations to existing shed structure; c) removal of existing shed structure and storage containers; d) alteration to existing boundary to provide new site entrance, access road and footpath from the existing Leighton Manor estate; e) new site boundary treatments; f) new waste, water and utility service connections and all associated site works on the land to the rear of the existing dwelling
2560140Conditional8 Aug 20250316 mchange of use from former post office to living accommodation, change of use of existing domestic stores to living accommodation along with retention of extension to rear of dwelling together with all associated site works
24191Conditional4 Dec 202404 m(1) the sun room built to the side of the existing dwelling house; (2) the extension built to the existing shed; (3) the lawnmower shed built at the side boundary wall and (4) all associated site works
2460070Conditional21 Mar 20240308 mexisting domestic garage together with all associated site works
23107Conditional13 Jun 20230397 msingle storey, two bedroom, kitchen, living and shower room annex to the side of existing property
2360246Conditional1 Jun 20230435 mnew extension to the front and rear of existing dwelling with a new garage and new percolation area and all associated site works

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 17 Aug 2026 New application · observations close 21 Sept 2026
  • 17 Aug 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Tipperary County Council before relying on it.