PlanningRegister.ie
Observation pack · Tipperary County Council

46 Rosemount Heights , Cahir , Co. Tipperary

a car port structure to the side of an existing dwelling and all associated site development works

Observations close 6 Oct 2026 16 days left
5 weeks from receipt (received 1 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 26 Oct 2026

The application

Reference
2660852 · full record
Authority
Tipperary County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
448 m²
Received
1 Sept 2026
We first saw it
18 Sept 2026, 15:44
Decision due
26 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2660852/0.
  2. Write your observation.Quote 2660852 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
  4. Submit before 6 Oct 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660292Conditional25 May 20260193 mA Sunroom extension to existing dwelling house
2660071Conditional24 Mar 20260193 ma) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising - (i) extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4 no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3 no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof; (ii) extension 2 (58.5m²) and extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing technology classrooms, and; (iii) extension 4 (38.5m²), a single storey external store extension; b) demolition of part of the existing service yard, including four small stores (total area 67.4m²); c) construction of a new 2.1m high rendered wall and vehicular gates to the modified service yard, and construction of a new covered storage area; d) modifications and extension to the existing car park to provide additional car parking spaces and an SEN set down area; e) two new covered bicycle shelters and relocation of the two existing covered bicycle shelters; f) provision of a new heat pump compound enclosed in 2.1m high palisade fencing; g) construction of an SEN enclosed play area and a sensory garden; h) all ancillary site development works, including new hard and soft landscaping, an underground firefighting static storage tank, a swale and a soakaway, and i) all associated site services, including external lighting and EV charging
2561123Conditional20 Mar 20260255 mthe construction of all-weather sports facilities to the rear of the school including the following: a) a 3 lane, 400-metre athletic running track, with a 6 lane, 100-metre sprint track, b) an all-weather pitch for soccer and GAA games, c) track and field sports including long jump, high jump, shot put, boules, miniature-golf course, d) a perimeter walkway/running track with low level lighting around the existing amenities, e) flood-lighting to the main all-weather pitch and track and field sports, f) two new paddle courts with flood lighting and associated fencing, g) proposed ball stop netting, h) proposed dugouts, i) ancillary structures such as a small retaining wall between the all-weather pitch and the existing grass pitch, steps, footpaths, fencing and gates. The works include all landscaping, drainage, ancillary works and services
263Unconditional4 Feb 2026086 mthe construction of 21 no. 3 bedroom dwelling units in three terraced blocks, to include roads, paths, paving, parking, drainage, landscaped public open space, streetlighting, boundary treatments and all associated site development works
2560638Conditional26 Aug 20250461 m(i) the use of the existing building for the sale of coffee for consumption off the premises in addition to the existing established uses within the premises (ii) for new window pod extension (iii) for material alterations to the existing elevations of the existing building (iv) for new signage and all associated site works
2460828Conditional7 Aug 202524204 mthe construction of 24 No. 2 bed semi-detached bungalows designed for the elderly, the proposed development will also include new internal roadways and footpaths, proposed new pedestrian and new vehicular access from the existing Rosemount Farm Road to the south of the site, new boundary treatments, landscaping, foul and surface water drainage including associated attenuation together with all ancillary and associated site works
2460800Conditional12 Nov 20240424 msingle storey extension to rear, infill extension to front of property, alterations to elevations; reconstruction of driveway and entrance; new garage structure, new site fencing and all necessary services and siteworks
2460510Conditional16 Aug 20240169 mconversion of existing attached/integrated garage for use as habitable space, minor extension of this area to side and front, addition of and changes to windows and all associated site works to my property

Appeals

ACP caseTypeOutcomeDecidedDistance
316882Other14 Aug 2023463 m
316885Other14 Aug 2023256 m
311996Withdrawn6 Dec 2021164 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 1 Sept 2026 New application · observations close 6 Oct 2026
  • 1 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Tipperary County Council before relying on it.