PlanningRegister.ie
Observation pack · Tipperary County Council

Owenbeg Ballycurrane , Thurles , Co. Tipperary

the existing front porch extension and existing rear extension including associated siteworks

Observations close 8 Oct 2026 16 days left
5 weeks from receipt (received 3 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 28 Oct 2026

The application

Reference
2660857 · full record
Authority
Tipperary County Council
Type
RETENTION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
4,169 m²
Received
3 Sept 2026
We first saw it
18 Sept 2026, 15:44
Decision due
28 Oct 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2660857/0.
  2. Write your observation.Quote 2660857 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
  4. Submit before 8 Oct 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660281Conditional13 May 20260206 man attic conversion to the existing dwelling and all associated siteworks
2460987Conditional15 Dec 2025025 ma 10-year permission for the development which will consist of the phased extension of the existing food manufacturing facility comprising: 1) construction of an 11,267 m² extension to the existing food manufacturing facility, including: (a) cold storage areas; (b) two-storey office space, toilet block, and drivers’ area; (c) new processing, packing, intake/dispatch areas; (d) electrical plant, maintenance rooms, and external steel access staircases; (e) new gas tanks, transformer compound, and pipe bridge; 2) construction of an 1,500 m³ storage building for packaging and machinery; 3) extension of existing wastewater treatment plant (WWTP) buildings (primary: 107 m², secondary: 250 m²); 4) construction of an 110 m² waste collection building; 5) extension to the existing water treatment plant (WTP) building (70 m²); 6) expansion of the high temperature (HT) plant room (64 m²); 7) construction of 4 no. tanks; 8) installation of 3 no. bunded kerosene tanks (50,000 L each); 9) construction of a 16 m high boiler stack; 10) construction of new internal access roads (c. 8,825 m²); 11) creation of a 520 m² internal courtyard area; 12) construction of a 630 m² external storage compound; 13) construction of a 3,120 m³ stormwater attenuation pond and discharge line; 14) installation of a standby treated effluent discharge pipeline (1,490 m); 15) realignment and expansion of site boundary, including new boundary walls, fencing and planting; 16) provision of an additional 8 no. truck parking spaces; 17) relocation of the existing fuel tank and weighbridge; 18) expansion of the existing sprinkler pump house (24 m²); 19) conversion of 22 no. existing car spaces including 1 no. accessible space to 22 no. EV car spaces as required and provision of 30 no. bicycle parking spaces; 20) installation of new site lighting; 21) demolition of existing buildings and structures (total 1,840 m²); and 22) all ancillary site development works and services to facilitate the development including drainage, landscaping, temporary construction compound and utility connections. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been submitted to the planning authority with this application
25217Conditional9 Dec 20250452 m1) a domestic extensions to the existing dwelling and including all associated alterations to external facades, 2) two domestic storage sheds, 3) amendments to original vehicular access, and including all associated site development works
2460033Conditional19 Jun 20241160 mthe existing detached one and half story house as constructed and all associated site works
2260568Conditional20 Jun 20231160 munauthorised foundations on the site, together with PERMISSION to construct a new dwelling house with entrance, connection to public services together with all associated site works
2260732Conditional22 Feb 20230383 mdevelopment at site of c. 9.3 hectares. The development will consist of: a 10-year permission for the construction of a Solar PV Energy Development comprising the installation of Solar Photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries; 2 No. transformer stations; inverters; all ancillary underground cabling and ducting; internal site access; site perimeter (stock-proof) security fencing; CCTV structures; landscaping including screen planting; temporary construction compound; 2 No. site containers and all associated site development works. The site will be accessed from the R660 Regional Road, via the existing Dew Valley Foods site
2260690Conditional10 Feb 20231135 mextension and alterations to original house including retention of sheds and associated siteworks

Appeals

ACP caseTypeOutcomeDecidedDistance
501497Invalid8 Jun 2026206 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 3 Sept 2026 New application · observations close 8 Oct 2026
  • 3 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Tipperary County Council before relying on it.