Ballinteenoe , Boher , Co. Tipperary
the erection of an entrance road suitable for a development of 6 serviced sites (each suitable for a private dwelling house) and permission to install an effluent treatment system for each site and extend existing watermain and service ducting, provide public lighting and all associated site works
The application
- Reference
- 2660869 · full record
- Authority
- Tipperary County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 1.69 ha
- Received
- 4 Sept 2026
- We first saw it
- 18 Sept 2026, 15:44
- Decision due
- 29 Oct 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2660869/0.
- Write your observation.Quote
2660869at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
- Submit before 9 Oct 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2460648 | Conditional | 25 Sept 2024 | 1 | 78 m | a dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works |
| 2260712 | Conditional | 15 Feb 2023 | 1 | 78 m | a two storey dwelling house, garage, waste water system, entrance, driveway along with all ancillary site works |
| 2260098 | Conditional | 9 Nov 2022 | 0 | 0 m | the demolition of 2 no. existing prefabricated classrooms and the construction of 2 no. single storey stand-alone buildings with covered walkways to accommodate a classroom and an early intervention room as well as associated ancillary accommodation. External works to include retaining structures, ramps and steps to resolve existing site levels as well as new boundary treatments to the south and west of the site, a new wastewater treatment plant and percolation area and all other associated site works required to facilitate the development. |
| 211273 | Conditional | 13 Oct 2021 | 0 | 0 m | amendments to previously granted planning permission for the construction of Multi Use Games Area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary & incidental works (Previous Planning Ref. 21/242), the amendments required are an increase in the size of the proposed MUGA to 55x40m together with additional floodlighting |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 4 Sept 2026 New application · observations close 9 Oct 2026
- 4 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Tipperary County Council before relying on it.