PlanningRegister.ie
Observation pack · Tipperary County Council

80 Ard Na Greine , Clonmel , Co. Tipperary

construction of a vehicular entrance and car-parking area at the front of my house, including all associated site development works

Observations close 14 Oct 2026 21 days left
5 weeks from receipt (received 9 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 3 Nov 2026

The application

Reference
2660879 · full record
Authority
Tipperary County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
Site area
208 m²
Received
9 Sept 2026
We first saw it
18 Sept 2026, 15:44
Decision due
3 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2660879/0.
  2. Write your observation.Quote 2660879 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
  4. Submit before 14 Oct 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2692Unconditional4 Sept 20260286 mdemolition of existing buildings and construction of 60 dwellings comprising of 20 apartments in 2 no. 3 storey blocks and 40 houses in 10 no. 2 storey blocks using existing entrance from public road, connection to public services, carparking, roads, footpaths, open space areas and ancillary site development works
2660669Conditional1 Sept 2026062 mthe widening of vehicular entrance, hardstand area to the front of dwelling and all associated site development works
2660317Conditional6 Aug 20260272 m1) demolition of existing garage to side of house and existing rear extension, 2) construction of new single storey rear extension, 3) alteration of the existing elevations including changing windows and doors, 4) change of existing single storey roof to flat roof, 5) construction of new canopy to front elevation, 6) widen existing entrance and all associated site works
2660407Conditional21 Jul 20260185 mthe construction of a single storey extension and associated siteworks to the side of the dwelling
2644Conditional16 Jul 20260139 mthe reconstruction and extension of the dwelling house. The proposed extension to the rear of the dwelling will be a single storey construction incorporating a kitchen/dining room and a utility/plant room; 2 no. new high level velux windows to the rear of the existing dwelling; a new vehicular entrance to the rear of the site and all associated site works
2660086Conditional8 May 20260448 mRED III, A 10-year planning permission for a solar energy development with a total site area of 15.9 hectares comprising (i) photovoltaic solar panels on mounting frames; (ii) electrical transformer stations; (iii) underground electrical and communications cabling; (iv) upgraded and new on-site access tracks; (v) security fencing and gates; (vi) pole-mounted security cameras; and (vii) all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Appropriate Assessment Screening Report
2660105Conditional1 Apr 202641286 mthe changes to previously approved Planning Permission (Ref. no. 20/283) for a residential development. The proposed changes consist of: a) changes to the finished floor levels of house numbers 01 to 41, b) redesign of the foul drainage and adjustments to the ground levels, c) relocation and redesign of the turning head and green space to the Eastern corner of the site including changes to ground levels, d) re-location of the car parking for house number 30 and changes to visitor parking, e) changes and alterations to the as-built concrete retaining wall along the Southeastern boundary. f) RETENTION PERMISSION for the as-built concrete retaining wall along the Northern boundary
2560643Conditional23 Jan 202630238 m(a) the demolishing of existing agricultural sheds and stone wall to the front of the site, (b) the construction of 30 no. 2 storey dwellings consisting of 17 no. 3 beds units and 13 no. 4 beds units arranged in 4 no. terrace blocks of four dwellings and 7 no. semi detached dwellings, (c) the provision of public and private open space, car parking, bin storage, public lighting, landscaping, boundary treatments, internal roads and footpaths, pedestrian access and site entrance onto Tivoli Road, connections to existing services and all associated development including new public footpath to west of site

Appeals

ACP caseTypeOutcomeDecidedDistance
317558Granted with conditions16 Sept 2024485 m
311211Granted with conditions13 Dec 2022217 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 9 Sept 2026 New application · observations close 14 Oct 2026
  • 9 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Tipperary County Council before relying on it.