Magherareagh Townland , Ardfinnan , Co. Tipperary
RED III develoment to construct a photovoltaic solar farm development. The proposed development seeks a 10-year planning permission for the proposed photovoltaic solar farm development and all associated site works. The development will consist of linear arrays of solar photovoltaic panels on ground mounted frames of ca. 9.40 hectares overall area, including: associated cabling & ducting and hybrid inverters; a 20kV electrical customer control building; ESB modular hub and transformers; site entrance and access track; perimeter fencing up to 2.5 metres high; pole mounted CCTV cameras up to 3 metres high; temporary access track, temporary contractor’s compound & temporary storage area; and all associated site development and ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application. The proposed development will have a 40-year operational life from the date of commissioning. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall…
The application
- Reference
- 2661043 · full record
- Authority
- Tipperary County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Site area
- 9.40 ha
- Received
- 23 Oct 2026
- Decision due
- 17 Dec 2026
The council’s feed cuts this description short. The full text and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2661043/0.
- Write your observation.Quote
2661043at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
- Submit before 27 Nov 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
Designations on or near the site within 100 m
- Recorded monument × 3R132937 · Enclosure · Enclosure
What has happened on this file
- 23 Oct 2026 New application · observations close 27 Nov 2026