PlanningRegister.ie
Observation pack · Waterford City and County Council

in the townlands of Ballynakill Farranshoneen Williamstown Grange Upper Grange Lower , Ballytruckle Kingsmeadow Kilbarry Pastimeknock , Lisduggan Big Skibbereen Ballynaneashagh in Waterford City Co. Waterford.

A 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, a heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and a district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development

Observations close 1 Dec 2026 3 days left
5 weeks from receipt (received 27 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 21 Dec 2026

The application

Reference
2660823 · full record
Authority
Waterford City and County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
20.34 ha
Received
27 Oct 2026
Decision due
21 Dec 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/WaterfordCCC/AppFileRefDetails/2660823/0.
  2. Write your observation.Quote 2660823 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Waterford City and County Council takes it online with the submission or at the counter.
  4. Submit before 1 Dec 2026.Online through the register above, or in writing to the Planning Department, Waterford City and County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
C7
Rural business
CD: Provide for light industry, general enterprise, business development, office, research and development and high technology/ high technology manufacturing type employment in a high quality built and landscaped environment.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
C7
Rural business
CD: Provide for light industry, general enterprise, business development, office, research and development and high technology/ high technology manufacturing type employment in a high quality built and landscaped environment.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G1
Open space with recreation
OS: Preserve and provide for open space and recreational amenities.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
G3
High amenity
HA: Protect highly sensitive and scenic location from inappropriate development that would adversely affect the environmental quality of the locations.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M1
Metro / rail economic corridor
RE: Provide for enterprise and/ or residential led regeneration.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M1
Metro / rail economic corridor
RE: Provide for enterprise and/ or residential led regeneration.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M1
Metro / rail economic corridor
RE: Provide for enterprise and/ or residential led regeneration.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M1
Metro / rail economic corridor
RE: Provide for enterprise and/ or residential led regeneration.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M5
Mixed use — outer core
GB: To provide for and improve General Business uses; this includes suburban district retail and local neighbourhood centres.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M5
Mixed use — outer core
GB: To provide for and improve General Business uses; this includes suburban district retail and local neighbourhood centres.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M5
Mixed use — outer core
GB: To provide for and improve General Business uses; this includes suburban district retail and local neighbourhood centres.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M5
Mixed use — outer core
GB: To provide for and improve General Business uses; this includes suburban district retail and local neighbourhood centres.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M5
Mixed use — outer core
GB: To provide for and improve General Business uses; this includes suburban district retail and local neighbourhood centres.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M5
Mixed use — outer core
GB: To provide for and improve General Business uses; this includes suburban district retail and local neighbourhood centres.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M5
Mixed use — outer core
GB: To provide for and improve General Business uses; this includes suburban district retail and local neighbourhood centres.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
M5
Mixed use — outer core
GB: To provide for and improve General Business uses; this includes suburban district retail and local neighbourhood centres.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
N6
Strategic infrastructure
TU: Provide for transport and utilities infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R1
New residential
R1: Provide for new residential development in tandem with the provision of the necessary social and physical infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
R2
Existing residential
RS: Provide for residential development and protect and improve residential amenity.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028
S3
Community infrastructure
CI: Provide for and protect civic, educational, religious, community, health care and social infrastructure.wccc development plan 2022 202819 Jul 2022 → 18 Jul 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Waterford City and County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Waterford City and County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site within 100 m

  • NIAH-recorded building × 26
    Manor of Saint John · Quarrymount House · post box
  • Recorded monument × 2
    R132449 · Flat cemetery

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2660757Conditional19 Nov 202647 mAlterations and extension, comprising new entrance porch, new rear extension, new first floor dormer accommodation, 3 no. new rear dormer windows and 3 no. new roof windows at front elevation and all associated siteworks
2660755Conditional19 Nov 2026397 mProposed single storey plant room extension to the main facility and to include all associated site works, drainage, alterations to existing site levels and ancillary site development works to accommodate the above works, all at their premises
2660731Conditional13 Nov 202689 mthe demolition of an existing vacant two-storey dwelling house and the subdivision of the site into four residential sites, together with all associated site works,
2660710Refused3 Nov 2026199 mfor a change of use from a Drive-Through Car Wash to a Drive-Through Coffee Kiosk .The application seeks to construct a modest, timber clad kiosk unit from which to serve take away coffee with way-finding totem and signage. The existing drive-through arrangements, long established by the former car wash use, will be repurposed as indicated on the drawings with no proposed changes to traffic flow or existing vehicular entrance and exit to the site. The application includes modest landscaping of the site's boundary edges, comprising the removal of the existing wall and glazed car wash screen and replacement with a visually permeable low level timber fin fence with associated upgrades to surface finishes and planting. Staff use of the existing commercial toilet/welfare provisions is highlighted on the drawings. The proposal includes all necessary external site works.
2660698Conditional29 Oct 2026278 mfor a ground floor change of use from an existing Bookmakers shop to a Café/Restaurant with take away facility, together with internal and external alterations, signage, and associated site works
2660700Conditional29 Oct 2026374 ma single storey extension & elevational alterations to existing dressing rooms, including all associated internal alterations & ancillary site works
2660540Conditional9 Oct 2026467 mProposed new workshop and ancillary staff facilities and offices. Proposed works will also include new marshalling yard, staff and visitor carparking, all associated plant and equipment, site fencing, building and site signage, alterations to the existing site entrance and all associated site and drainage works
2659Conditional8 Oct 202635 mFor change of use of existing shop to restaurant and for new signage on front and side of existing building, also 12 proposed new parking spaces at the rear of building.

Appeals

ACP caseTypeOutcomeDecidedDistance
324513Other10 Nov 202620 m
501209Refused4 Aug 202610 m
500868Refused26 Jun 2026254 m
500406Granted20 Apr 20260 m
323907Refused30 Mar 2026397 m
323071open18 Jul 20250 m
320728Granted with conditions18 Dec 2024436 m
318605Granted with conditions6 Dec 20240 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 27 Oct 2026 New application · observations close 1 Dec 2026
  • 27 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Waterford City and County Council before relying on it.