PlanningRegister.ie
Observation pack · Wicklow County Council

On site behind 101 and 102 Main Street , Bray , Co. Wicklow

Six 2-bed apartments, connected to existing services

Observations close 1 Dec 2026 3 days left
5 weeks from receipt (received 27 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
2660957 · full record
Authority
Wicklow County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Site area
311 m²
Received
27 Oct 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/WicklowCC/AppFileRefDetails/2660957/0.
  2. Write your observation.Quote 2660957 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Wicklow County Council takes it online with the submission or at the counter.
  4. Submit before 1 Dec 2026.Online through the register above, or in writing to the Planning Department, Wicklow County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
M2
Major town centre
Town Centre: To provide for the development and improvement of appropriate town centre uses including residential, retail, commercial, office and civic use.bray municipal district local area plan 201810 Jun 2018 → 23 Oct 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Wicklow County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Wicklow County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site within 100 m

  • NIAH-recorded building × 11
    Ledwidge Brothers · shop/retail outlet · shop/retail outlet
  • Radon risk area × 2
    About 1 in 20 homes in this area is likely to have high radon levels · About 1 in 5 homes in this area is likely to have high radon levels
  • Recorded monument × 2
    R181220 · Castle - unclassified

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
2660880Conditional19 Nov 2026256 m(1) The removal of the existing single-storey rear extension. (2) The construction of a new flat-roofed rear extension at ground-floor level, with the roof area serving as a balcony. (3) The construction of a new pitched-roof rear extension at first-floor level. (4) The provision of a new open glazed porch under the existing canopy to the front elevation. (5) Associated alterations to all elevations, including the provision of external wall insulation.
2660887Conditional15 Nov 2026384 mmodifications to the front and side (east) elevations, including alterations to existing window openings, the construction of new window openings, installation of decorative timber gable pediments to the front and provision of new timber posts to the porch; demolition of 2 no. existing chimney stacks; construction of a new vehicular entrance onto Florence Road, including new gateway and two new pillars to match existing pillars, to provide off-street parking for 2 vehicles at Mizpah with one parking space lost from the paid parking bay in front of the property; all along with associated site works and services above and below ground level at Mizpah, Florence Road, Bray, Co.Wicklow, A98 PA06
2660821Conditional15 Nov 202627 mthe installation of 5NO. new illuminated signs surrounding the Bray Central development relating to the new leisure unit (Bowling and Cinema), signs 1&2 are double sided signs situated on the building facing Main Street, sign 3 is located at high level sharing the elevation of Penney's entrance sign, signs 4a and 4b are located at entrance of leisure unit, sign 5 is located at the South of Bray Central entering the car park
26185Conditional3 Nov 2026221 m''Part 8 - submissions should be made to the relevant department as specified on the site notice ( not the planning department )'' - construction of 16 no. apartment units and all associated works at the former Central Garage Site, Parnell Road, (Townland of Bray), Bray, Co. Wicklow, the accommodation shall consist of the following 12 no. 1-bed apartments and 4 no. 2-bed apartments
2660793Conditional27 Oct 2026313 mthe demolition of the existing prefabricated building and associated site works, and the construction of a new single-storey school building of approximately 230m², together with two soft play areas of approximately 50m² each located to either side of the proposed building, the proposed development will also include all associated site development works, including the removal of existing trees and dense vegetation to the rear of the existing prefabricated building to facilitate the construction of the proposed school building, together with associated site works, the proposed development is located at St. Patrick’s Loreto Primary School, Vevay Road, Bray, County Wicklow, and is situated within the vicinity of Protected Structure Wicklow RPS-B105. An Ecological Impact Assessment Report, an Appropriate Assessment Screening Report along with a Conservation Report and Heritage Impact Assessment have been submitted as part of the planning application
2660757Conditional13 Oct 202665 mthe change of use from retail to a residential use at first floor and part ground floor, the residential unit will comprise of a 39sqm studio apartment, access will be provided via an existing entrance at ground floor along Quinsborough Rd, the remaining 30sqm at ground floor will remain as a retail unit, other works will include new replacement sash windows to north and Western elevations and 3no. new rooflights to existing roof
26177Conditional7 Oct 2026135 msection 254 licence - scaffolding
26173Conditional5 Oct 2026442 msection 254 licence - scaffolding

Appeals

ACP caseTypeOutcomeDecidedDistance
502377open28 Oct 2026111 m
500165Granted30 Sept 2026193 m
501974pending25 Aug 2026106 m
501655open3 Jul 2026202 m
323846Other4 Jun 2026211 m
323722Refused23 Mar 2026126 m
500146Granted with conditions9 Mar 2026446 m
313442Refused9 Dec 2025182 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 27 Oct 2026 New application · observations close 1 Dec 2026
  • 27 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Wicklow County Council before relying on it.