PlanningRegister.ie
Observation pack · Wicklow County Council

Betty's Cottage , Tiglin Newcastle , County Wicklow

The refurbishment of an existing, 38m² single storey cottage and construction of a single storey, 120m² extension to the side/ rear of the existing single storey cottage, the cottage refurbishment will comprise of an entrance hall and 2 new bedrooms, the extension will accommodate 1 bedroom, tv room, open plan living, kitchen and dining area and other ancillary spaces, the development will also include the installation of a new waste water treatment plant and soak pit, all together with ancillary and site development works such as boundary treatments to facilitate sightlines and landscaping

Observations close 2 Dec 2026 4 days left
5 weeks from receipt (received 28 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 22 Dec 2026

The application

Reference
2660961 · full record
Authority
Wicklow County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
5,863 m²
Received
28 Oct 2026
Decision due
22 Dec 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/WicklowCC/AppFileRefDetails/2660961/0.
  2. Write your observation.Quote 2660961 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Wicklow County Council takes it online with the submission or at the counter.
  4. Submit before 2 Dec 2026.Online through the register above, or in writing to the Planning Department, Wicklow County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • Radon risk area × 2
    About 1 in 10 homes in this area is likely to have high radon levels · About 1 in 20 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660664Refused18 Sept 20260 mdevelopment will consist of the refurbishment of an existing, 38m² single storey cottage and construction of a 2 storey, 224m² extension to the side/ north of the existing single storey cottage. Both buildings will be connected by a single storey glazed link. The cottage refurbishment will comprise of a new entrance hall, home study, cloak room and bathroom. The extension will accommodate a play room, open plan living, kitchen and dining area, tv room and ancillary spaces at ground floor level, together with 4 bedrooms and other associated spaces at first floor level. The development will also include the installation of a new waste water treatment plant, soak pit, alterations to vehicular access, all together with ancillary and site development works such as boundary treatments and landscaping
2288Refused29 Jul 20221357 ma) provision of new 300sqm two storey detached dwelling and effluent treatment system b)construction of new vehicular entrance to serve the proposed dwelling c) all necessary ancillary and site works to facilitate this development

Appeals

ACP caseTypeOutcomeDecidedDistance
314437Refused3 Jan 2024362 m
311496Granted with conditions4 Apr 2022256 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 28 Oct 2026 New application · observations close 2 Dec 2026
  • 28 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Wicklow County Council before relying on it.