Drumlin Drive, Cootehill
Planning applications, extensions, appeals and building work on Drumlin Drive, from the council registers, over the last 10 years.
13 planning applications on Drumlin Drive since 2021, mostly extensions; 100% granted.
The estate boundary from OpenStreetMap
Planning applications inside this estate 13 applications in the last 10 years
- Granted35 Bridge Street , Cootehill , Co. Cavan
- Appeal decidedMagheranure , Cootehill , Cavan
- WithdrawnMagheranure , Cootehill , Cavan
- WithdrawnMagheranure , Cootehill , Cavan
- Granted10 Drumlin Drive , COOTEHILL , Co. Cavan
- WithdrawnMagheranure , Cootehill , Cavan
- Granted35 37 41 43 & 45 Bridge Street , Cootehill , Co. Cavan
- Withdrawn35 & 37 Bridge Street , Cootehill , Co. Cavan
- GrantedNo.'s 41 43 & 45 Bridge Street , Cootehill , Co. Cavan
- GrantedMagheranure , Cootehill , Co. Cavan
Appeals inside this estate 1 with An Coimisiún Pleanála
Building work started inside this estate 2 commencement notices
What people apply for on Drumlin Drive 13 applications since 2021, by type
- Extensions7 54%
- New homes6 46%
- Change of use0 0%
- Other0 0%
Most common extension on Drumlin Drive: rear (3 of 7 extension applications). Then: single-storey rear (2), attic conversion / dormer (2).
7 decided: 7 granted, 0 refused. 1 went to appeal. Types are read from each application’s description, so a few will be in the wrong group.
Taken in charge? the council’s own lists
No taken-in-charge list from Cavan County Council names this estate.
It was on the Department of Housing’s unfinished-housing survey (2011, 2012), recorded with 25 homes.
Source: OpenStreetMap (estate boundary and name) · fetched 27 Sept 2026 · applications, appeals and commencement notices from the council registers, An Coimisiún Pleanála and the BCMS
Contains data © OpenStreetMap contributors, available under the Open Database Licence (ODbL).
Source: National Housing Development Survey (Department of Housing) · licensed under CC BY-SA 4.0
Planning report for Drumlin Drive, Cootehill
Every application, appeal and deadline within 250 m, with zoning and heritage, in one report.
No account, no payment. Not a statutory planning search.
Something wrong on this estate page, or a record you want corrected or removed? Contact us and we will check it against the source.