Planning report · Cork County Council · 500 m around the house · the last 12 months · 18 Oct 2026, 16:59

Mariners Cove

51.48684, -9.36734

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2023. Home extensions nearby almost always get approved (98%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 9 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BaltimoreBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2023: 23/538 · permission for replacement, approved2023: 23/447 · replacement of two, withdrawn or invalid1998: 3 files on Baltimore1999: 16 files on Baltimore2000: 14 files on Baltimore2001: 12 files on Baltimore2002: 8 files on Baltimore2003: 11 files on Baltimore2004: 12 files on Baltimore2005: 7 files on Baltimore2006: 6 files on Baltimore2007: 16 files on Baltimore2008: 32 files on Baltimore2009: 18 files on Baltimore2010: 9 files on Baltimore2011: 8 files on Baltimore2012: 5 files on Baltimore2013: 5 files on Baltimore2014: 7 files on Baltimore2015: 6 files on Baltimore2016: 4 files on Baltimore2017: 6 files on Baltimore2018: 2 files on Baltimore2019: 8 files on Baltimore2020: 8 files on Baltimore2021: 7 files on Baltimore2022: 9 files on Baltimore2023: 7 files on Baltimore2024: 12 files on Baltimore2025: 6 files on Baltimore2026: 7 files on Baltimore271 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    23/538 · permission for replacement · approved 2023 · not started, runs out 2028
    approvedstartedsigned off
  2. 2023
    23/447 · replacement of two · withdrawn
    approved?started?signed off?
On this site
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Baltimore (417 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings10house; school
Monuments8Ringfort - rath; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 93% approved.

Attic or dormer11 decided · more info asked 0%
100% · council 96%
New house in a garden or site43 decided · more info asked 0%
93% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 54 nearby, 9,056 council-wide

Figure 3

Baltimore, file by file since 1998

74 of 78 decided extensions on the road were approved. New houses in side gardens or on sites: 13 of 15.

271 planning files on Baltimore since 1998, by kind and decision.199820002002200420062008201020122014201620182020202220242026Extensions, atticsNo number · 1999 · other extension · approved · 99/1709No number · 1999 · other extension · approved · 99/2109No number · 1999 · other extension · approved · 99/2612No number · 1999 · other extension · approved · 99/4490No number · 1999 · other extension · approved · 99/648No number · 2000 · other extension · approved · 00/1154No number · 2000 · other extension · approved · 00/3511No number · 2000 · other extension · approved · 00/3656No number · 2000 · first-floor · approved · 00/4750No. 22 · 2000 · other extension · approved · 00/5404No number · 2000 · attic conversion / dormer · approved · 00/5614No number · 2000 · garage conversion · approved · 00/5615No number · 2001 · attic conversion / dormer · refused · 01/2693No number · 2001 · attic conversion / dormer · approved · 01/4400No. 22 · 2001 · porch / front · approved · 01/5068No number · 2001 · other extension · approved · 01/5226No number · 2001 · other extension · undecided · 01/667No number · 2002 · other extension · approved · 02/2575No number · 2002 · attic conversion / dormer · undecided · 02/2607No. 2 · 2002 · other extension · approved · 02/5066No. 1 · 2003 · other extension · approved · 03/2280No number · 2003 · other extension · approved · 03/3044No number · 2003 · other extension · approved · 03/3120No number · 2003 · garage conversion · refused · 03/3317No number · 2003 · other extension · approved · 03/772No number · 2004 · other extension · approved · 04/6122No. 4 · 2004 · other extension · approved · 04/7686No number · 2004 · porch / front · approved · 04/7921No number · 2004 · attic conversion / dormer · approved · 04/8093No. 3 · 2004 · other extension · approved · 04/8119No. 3 · 2005 · other extension · approved · 05/1698No. 6 · 2005 · other extension · approved · 05/3157No number · 2005 · other extension · undecided · 05/416No number · 2005 · other extension · approved · 05/4671No number · 2006 · other extension · approved · 06/2266No. 20 · 2006 · porch / front · approved · 06/837No. 11 · 2007 · rear · undecided · 07/2217No number · 2007 · other extension · approved · 07/2313No. 11 · 2007 · rear · approved · 07/2534No. 16 · 2007 · other extension · approved · 07/2845No number · 2007 · other extension · approved · 07/2994No number · 2008 · other extension · refused · 08/1007No number · 2008 · attic conversion / dormer · undecided · 08/1390No number · 2008 · attic conversion / dormer · undecided · 08/1499No number · 2008 · other extension · undecided · 08/1747No number · 2008 · other extension · approved · 08/1786No number · 2008 · attic conversion / dormer · approved · 08/1811No number · 2008 · other extension · approved · 08/1857No number · 2008 · other extension · undecided · 08/792No number · 2009 · two-storey rear · approved · 09/1000No number · 2009 · side · undecided · 09/1083No. 22 · 2009 · other extension · undecided · 09/1094No. 22 · 2009 · other extension · approved · 09/2012No number · 2009 · two-storey rear · undecided · 09/2197No number · 2009 · garage conversion · approved · 09/348No number · 2009 · other extension · undecided · 09/738No. 2 · 2009 · first-floor · approved · 09/806No number · 2009 · other extension · approved · 09/905No number · 2009 · two-storey rear · undecided · 09/941No number · 2010 · two-storey rear · approved · 10/10No number · 2010 · other extension · undecided · 10/104No number · 2010 · other extension · undecided · 10/41No. 9 · 2010 · garden room · approved · 10/664No number · 2010 · other extension · approved · 10/759No number · 2010 · other extension · undecided · 10/91No. 17 · 2011 · attic conversion / dormer · undecided · 11/208No number · 2011 · other extension · undecided · 11/385No number · 2011 · other extension · undecided · 11/442No number · 2011 · other extension · approved · 11/544No. 46 · 2012 · attic conversion / dormer · approved · 12/684No number · 2012 · two-storey side · approved · 12/707No. 17 · 2012 · attic conversion / dormer · undecided · 12/737No. 17 · 2012 · attic conversion / dormer · approved · 12/744No number · 2015 · other extension · undecided · 15/86No. 22 · 2016 · attic conversion / dormer · undecided · 16/261No. 22 · 2016 · attic conversion / dormer · undecided · 16/291No. 22 · 2016 · attic conversion / dormer · undecided · 16/335No. 22 · 2016 · attic conversion / dormer · approved · 16/417No number · 2017 · other extension · approved · 17/284No. 5 · 2017 · first-floor · undecided · 17/355No. 5 · 2017 · first-floor · approved · 17/407No. 12 · 2017 · rear · approved · 17/711No. 2 · 2018 · first-floor · approved · 18/497No. 17 · 2019 · garden room · approved · 19/165No. 19 · 2019 · other extension · approved · 19/212No number · 2019 · other extension · approved · 19/357No. 9 · 2020 · attic conversion / dormer · approved · 20/636No. 47 · 2020 · attic conversion / dormer · approved · 20/737No. 42B · 2021 · attic conversion / dormer · approved · 21/194No number · 2021 · first-floor · approved · 21/219No. 6 · 2021 · attic conversion / dormer · undecided · 21/655No number · 2021 · attic conversion / dormer · undecided · 21/895No. 33 · 2022 · attic conversion / dormer · approved · 22/128No. 47 · 2022 · first-floor · approved · 22/211No number · 2024 · other extension · approved · 24/135No number · 2024 · other extension · refused · 24/356No. 1 · 2024 · single-storey side · undecided · 24/502No. 28 · 2024 · attic conversion / dormer · approved · 24/503No. 10 · 2024 · side · approved · 24/508No number · 2024 · other extension · approved · 24/540No number · 2024 · rear · approved · 24/82No. 5 · 2025 · attic conversion / dormer · approved · 25/147No number · 2025 · other extension · approved · 25/499No number · 2025 · garden room · approved · 25/6281No. 1 · 2025 · other extension · approved · 25/6726No number · 2026 · other extension · undecided · 26/1168No number · 2026 · other extension · approved · 26/1512Porches, roofs, otherNo. 15 · 1998 · other work · approved · 98/1599No number · 1998 · other work · approved · 98/2033No number · 1998 · other work · refused · 98/471No number · 1999 · other work · approved · 99/1006No number · 1999 · other work · undecided · 99/1181No number · 1999 · other work · undecided · 99/2483No. 15 · 1999 · other work · approved · 99/2591No number · 1999 · other work · approved · 99/2921No number · 1999 · other work · approved · 99/39No number · 1999 · other work · approved · 99/4944No number · 1999 · other work · approved · 99/5415No. 13 · 1999 · other work · approved · 99/5713No number · 1999 · other work · approved · 99/636No number · 1999 · other work · approved · 99/651No number · 2000 · other work · approved · 00/1506No number · 2000 · other work · approved · 00/2107No number · 2000 · other work · approved · 00/235No number · 2000 · other work · approved · 00/4010No number · 2000 · other work · approved · 00/4174No number · 2000 · other work · approved · 00/5894No. 15 · 2000 · other work · approved · 00/7089No number · 2001 · other work · undecided · 01/1740No. 10 · 2001 · other work · refused · 01/1865No number · 2001 · other work · approved · 01/3108No. 8 · 2001 · other work · approved · 01/5498No number · 2001 · other work · approved · 01/5516No. 6 · 2001 · other work · approved · 01/943No number · 2002 · other work · approved · 02/2596No number · 2002 · other work · approved · 02/4633No number · 2002 · other work · approved · 02/54No number · 2002 · other work · refused · 02/5852No number · 2002 · other work · approved · 02/883No number · 2003 · other work · undecided · 03/1597No number · 2003 · other work · approved · 03/2059No. 1 · 2003 · other work · approved · 03/2759No number · 2003 · other work · approved · 03/458No. 55 · 2003 · other work · approved · 03/5361No. 1 · 2004 · other work · approved · 04/3340No number · 2004 · other work · undecided · 04/603No number · 2004 · other work · undecided · 04/6598No number · 2004 · other work · approved · 04/6991No number · 2004 · other work · approved · 04/7218No number · 2004 · other work · approved · 04/8344No number · 2004 · other work · refused · 04/8987No. 6 · 2005 · other work · undecided · 05/2694No number · 2005 · other work · approved · 05/9171No number · 2005 · other work · approved · 05/9485No number · 2006 · other work · undecided · 06/2300No number · 2006 · other work · approved · 06/2371No number · 2006 · other work · undecided · 06/474No number · 2007 · other work · undecided · 07/1073No number · 2007 · other work · undecided · 07/1195No. 17 · 2007 · other work · undecided · 07/1306No number · 2007 · other work · refused · 07/1351No number · 2007 · other work · approved · 07/1438No number · 2007 · other work · undecided · 07/1445No. 17 · 2007 · other work · approved · 07/1716No number · 2007 · other work · approved · 07/1818No number · 2007 · other work · undecided · 07/2012No. 6 · 2007 · other work · approved · 07/2889No number · 2007 · other work · undecided · 07/831No number · 2008 · other work · approved · 08/100No number · 2008 · other work · approved · 08/106No number · 2008 · other work · approved · 08/1061No. 6 · 2008 · other work · approved · 08/1141No number · 2008 · other work · approved · 08/1233No. 1 · 2008 · other work · undecided · 08/1330No number · 2008 · other work · undecided · 08/1477No. 1 · 2008 · other work · approved · 08/1534No. 3 · 2008 · other work · approved · 08/1562No number · 2008 · other work · undecided · 08/1710No. 4 · 2008 · other work · undecided · 08/1756No number · 2008 · other work · undecided · 08/1808No number · 2008 · other work · approved · 08/1967No. 4 · 2008 · other work · approved · 08/1968No number · 2008 · other work · undecided · 08/2179No number · 2008 · other work · undecided · 08/2201No number · 2008 · other work · undecided · 08/240No number · 2008 · other work · undecided · 08/360No number · 2008 · other work · undecided · 08/49No number · 2008 · other work · approved · 08/510No number · 2008 · other work · refused · 08/693No. 6 · 2008 · other work · undecided · 08/766No number · 2008 · other work · undecided · 08/885No. 6 · 2008 · other work · undecided · 08/995No number · 2009 · other work · approved · 09/117No number · 2009 · other work · undecided · 09/384No number · 2009 · other work · approved · 09/491No number · 2009 · other work · undecided · 09/739No number · 2009 · other work · approved · 09/919No number · 2009 · other work · approved · 09/926No number · 2010 · other work · approved · 10/153No. 5 · 2010 · other work · approved · 10/535No number · 2010 · other work · undecided · 10/873No. 10 · 2011 · other work · approved · 11/357No number · 2011 · other work · approved · 11/41No number · 2011 · other work · approved · 11/582No number · 2011 · other work · approved · 11/679No. 21 · 2013 · other work · undecided · 13/268No. 21 · 2013 · other work · approved · 13/377No number · 2013 · other work · undecided · 13/381No number · 2013 · other work · approved · 13/390No number · 2013 · other work · undecided · 13/692No number · 2014 · other work · approved · 14/137No number · 2014 · other work · approved · 14/209No number · 2014 · other work · undecided · 14/360No number · 2014 · other work · approved · 14/451No. 13 · 2014 · other work · approved · 14/574No number · 2014 · other work · undecided · 14/87No number · 2015 · other work · approved · 15/153No number · 2015 · other work · approved · 15/553No number · 2015 · other work · approved · 15/674No. 12 · 2017 · other work · approved · 17/134No. 9 · 2017 · other work · approved · 17/471No number · 2018 · other work · undecided · 18/749No number · 2019 · other work · approved · 19/22No number · 2019 · other work · undecided · 19/528No number · 2019 · other work · approved · 19/594No. 17 · 2019 · other work · approved · 19/780No. 8 · 2019 · other work · approved · 19/8No. 1 · 2020 · other work · approved · 20/286No number · 2020 · other work · approved · 20/60No number · 2020 · other work · approved · 20/83No number · 2021 · other work · refused · 21/188No number · 2021 · other work · approved · 21/259No number · 2022 · other work · undecided · 22/20No number · 2022 · other work · approved · 22/382No number · 2022 · other work · undecided · 22/41No number · 2022 · other work · refused · 22/69No number · 2022 · other work · undecided · 22/763No number · 2022 · other work · undecided · 22/779No number · 2022 · other work · approved · 22/92No number · 2023 · other work · refused · 23/398No number · 2023 · other work · undecided · 23/420No. 51 · 2023 · other work · undecided · 23/447No. 51 · 2023 · other work · approved · 23/538No number · 2023 · other work · approved · 23/9No number · 2024 · other work · approved · 24/102No number · 2024 · other work · approved · 24/222No number · 2024 · other work · approved · 24/347No number · 2024 · other work · undecided · 24/62No number · 2025 · other work · undecided · 25/315No number · 2026 · other work · approved · 26/0607No number · 2026 · other work · undecided · 26/0963No number · 2026 · other work · undecided · 26/2238No number · 2026 · other work · undecided · 26/2538New house in a side gardenNo number · 2001 · new house · approved · 01/214No number · 2003 · new house · approved · 03/4944No number · 2006 · new house · refused · 06/422No number · 2009 · new house · undecided · 09/2037No number · 2009 · new house · approved · 09/2122No number · 2012 · new house · approved · 12/671No number · 2014 · new house · approved · 14/126No number · 2015 · new house · undecided · 15/213No number · 2015 · new house · approved · 15/233No number · 2020 · new house · undecided · 20/134No number · 2020 · new house · approved · 20/204No number · 2020 · new house · approved · 20/319No number · 2021 · new house · approved · 21/214No number · 2023 · new house · approved · 23/127No number · 2023 · new house · approved · 23/570No number · 2024 · new house · refused · 24/303No number · 2025 · new house · approved · 25/402No number · 2026 · new house · approved · 26/0542
ApprovedRefusedWithdrawn or invalid

271 files with "Baltimore" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 1998–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days. Building starts about 9 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks; Building starts: 279 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 49–90 (n=50)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 279 days after permission (n=9)279 days after permissionSigned off78% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated50 decided home extensions, 9 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Mariners Cove with 5 numbered planning items
    ⌖ the houseOpen for commentsApprovedNo decision yet
    1. 1Allan Cottage, Church Strand 26/2538No decision yet · 456 m
    2. 2Old School House, Church Strand 26/1512Approved · 254 m
    3. 31, Harbour Drive 25/6726Approved with conditions · 286 m
    4. 4No9 CastleFields, Baltimore 26/0963No decision yet · 319 m
    5. 5Baltimore, Co. Cork 26/0607Approved with conditions · 470 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 31 permissions since 2016, 2 show a start notice and 0 have a completion certificate.

    48 applications lodged within 500 m. Council: 31 approved, 2 refused. After appeals: 31 approved. Of those: 0 signed off, 0 built with the owner's opt-out, 2 started, 29 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT31: lodged → approved2: lodged → refused15: lodged → undecided31: approved → approved2: refused → refused15: undecided → undecided29: approved → no start notice found2: approved → started, not signed off48 lodged48 lodged31 approved31 approved2 refused2 refused15 undecided15 undecided31 approved31 approved2 refused2 refused15 undecided15 undecided29 no start notice found29 no start notice found2 started, not signed off2 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured48 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 4 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-04 26/2538: application received — Refurbishment and Single Storey Extension to Existing Outbuilding, with Change of Use to Ancillary Accommodation Unit, Atoday23 Oct28 Oct2 Nov7 Nov12 Nov17 Nov26/2538: application received — Refurbishment and Single Storey Extension to Existing Outbuilding, with Change of Use to Ancillary Accommodation Unit, A · 456 m away · 2026-11-04
    Comments close
    • Comments close 4 Nov 202617 days left
      126/2538 · application received — Refurbishment and Single Storey Extension to Existing Outbuilding, with Change of Use to…
      €20 to the council · 456 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Applications within 500 m, by year

    Between 1 and 9 a year; busiest 2024. 94% of decisions were approvals.

    2017: 5, 2018: 1, 2019: 4, 2020: 7, 2021: 5, 2022: 4, 2023: 3, 2024: 9, 2025: 4, 2026: 605102017: 4 approved2017: 1 undecided5’17*2018: 1 undecided1’182019: 3 approved2019: 1 undecided4’192020: 6 approved2020: 1 undecided7’202021: 3 approved2021: 1 refused2021: 1 undecided5’212022: 3 approved2022: 1 undecided4’222023: 1 approved2023: 2 undecided3’232024: 6 approved2024: 1 refused2024: 2 undecided9’242025: 3 approved2025: 1 undecided4’252026: 2 approved2026: 4 undecided6’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 7 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    Building work nearby 2 in the last 12 months
    1 not signed off1 no sign-off needed
    • The Station House, Baltimore, Cork, P81 YV76 · 2 Nov 2026 · 1 homes · start notice not signed off · 25/402 · 371 m
    • Sun Dial House, No. 10 Village Moorings, Baltimore, Cork, P81 XK83 · 7 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 24/00508 · 398 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 18 Oct 2026, 01:21
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    How busy is this area Busier than most of Cork County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here15
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    44% owner-occupied (council 73%).

    Homes built before 1971
    23% · council 28%
    Homes built since 2001
    42% · council 36%
    Owner-occupied
    44% · council 73%
    Rented
    48% · council 22%
    Children under 15
    11% · council 21%
    Aged 65 and over
    21% · council 16%
    Households with 2+ cars
    30% · council 52%
    Work mainly from home
    19% · council 12%
    This small area (206 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047313006/047313005

    Bus
    290 m
    Baltimore East · 266a, 266b · busiest stop within 500 m: 1 an hour at peak
    Schools, stops and the council

    Schools

    None nearby.

      Stops 3

      • Baltimore East · 266a, 266b · 0/hour at peak · 290 m
      • Baltimore East · 266a, 266b · 1/hour at peak · 294 m
      • Baltimore · 266a, 266b · 0/hour at peak · 683 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 18 Oct 2026, 02:18
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic18 Oct 2026, 01:37open
      Council meetings (ModernGov)Public18 Oct 2026, 02:18open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Permission for replacement (23/538) approved 2023, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Planning here goes back to 1999: is the house built as approved?
        Ask for: The original planning grant and an opinion of compliance.
        Solicitor
      3. Application 456 m away open for comments until 4 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Baltimore
      Electoral division
      Tullagh
      Electoral area
      Skibbereen-West Cork
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 23/538, approved 2023, not started, runs out 2028.
      • No vacant land tax.
      • Nothing nearby looks set to change.
      • 1 application open for comments nearby; nearest closes 4 Nov 2026.
      • Baltimore East (bus 266a, 266b) 294 m away: 8 a day, fewer than one an hour at morning peak.
      • Here (2022 census): 48% rent (council 22%); 58% of homes empty (council 13%); most built 2001–2010; 45% drive to work (council 66%); population up 13% since 2016.
      • Around here the council decides in a median 68 days (about 10 weeks).
      • 7 applications nearby in the last 12 months.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.018 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public18 Oct 2026
      www2.courts.ie—© the publisher18 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public18 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.018 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence18 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 18 Oct 2026, 16:59 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.