Skull, West Cork, County Cork, Munster, Éire / Ireland
Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (96%). 57 homes approved 281 m away haven't started.
Not held yet for Cork County Council: council consultations.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 59 days
- 4Appeal window4 weeks after the decision
- 5AppealAt An Coimisiún Pleanála
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 9 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 2001–10, under planning permission and building regulations.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Zoning, protection, tax and flood: the detail
What it says
Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Schull (526 m)
| Within 500 m | Count | For example |
|---|---|---|
| Heritage inventory buildings | 30 | Westbourne House; An Tigín Eile |
| Monuments | 5 | Cross-slab; Graveyard |
How we work this out
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 25 Oct 2026, 23:06 | open |
| EPA licensed facilities (LEAP) | CC BY 4.0 | 26 Oct 2026, 23:21 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026, 19:35 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
A new house in a garden is harder: 83% approved.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 24 nearby, 4,519 council-wide
Skull, file by file since 2021
8 of 9 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.
26 files with "Skull" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2021–2026
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 59 days. Building starts about 9 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated46 decided home extensions, 10 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
Appeals nearby 2 in the last 12 months
- 501817 Pending · Copper Point, Skull (Townland), Schull, Co. Cork · 491 m
- 501809 Invalid · Copper Point, Skull (Townland), Schull, Co. Cork · 491 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 31 Oct 2026, 23:12 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
What's changing around you?
- 1Colla Road Skull Skull Co. Cork 24/225
- 21.9 ha zoned for homes
- 3Elm Grove, Colla Road 26/0749
- 425 and 26 Copper Point, Skull Townland 25/6671
- 5Copper Point, Skull (Townland) 26/1272
- 6Skull, Schull 25/6433
What happens to applications within 500 m
Permission isn't building. Of 31 permissions since 2016, 5 show a start notice and 0 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured50 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
Nothing closes within 500 m in the next 30 days.
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
57 homes 281 m away were approved May 2025 with no start notice yet; the permission runs to May 2030.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 2 within 500 m
Approved, not started 1
- Colla Road Skull Skull Co. Cork · 57 homes approved May 2025, not started · 281 m
Empty land zoned for homes 1
- 21.9 ha zoned for homes · no homes built on it yet · 488 m
Not covered here: council land to be sold (Dublin only).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| Derelict sites registers | CC BY 4.0 | 26 Oct 2026, 23:09 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
Applications within 500 m, by year
Between 5 and 17 a year; busiest 2022. 86% of decisions were approvals.
2021 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 6 in the last 12 months
See every application on the map
- Schull Community College, Colla Road, Skull, Schull, Co. Cork, P81 RH21 Withdrawn or not validThe development will consist of: the construction of a single-storey special educational needs (SEN)…
- 5Copper Point, Skull (Townland), Schull, Co. Cork Approved with conditionsPermission for the construction of 8 no. residential units comprising 3 no. 2-bed dwelling houses, 1 no.…
- 3Elm Grove, Colla Road, Schull, Co. Cork P81WP66 Approved with conditionsPermission for Retention of a dwellinghouse & detached garage as constructed
- 425 and 26 Copper Point, Skull Townland, Schull, Co. Cork ApprovedConstruction of 2 no. Two storey (3 Bed) Dwellings, 4 No. car parking spaces and all associated site works…
- Copper Point, Skull (Townland), Schull, Co. Cork Withdrawn or not validpermission for the construction of 8 no. residential units comprising 3 no. 3-bed dwelling houses, 1 no.…
- 6Skull, Schull, Co. Cork, P81FN77 Approved with conditionsProposed extensions, alterations and renovations to an existing detached dwelling house, the construction of…
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
Building work nearby 1 in the last 12 months
- Colla Road, Schull, Cork, P81KV81 · 2 Mar 2026 · 1 homes · start notice not signed off · 24697 · 296 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
Homes coming 57 not started
- 1Colla Road Skull Skull Co. Cork · 57 homes · not started · runs out 13 May 2030 · 281 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Social housing construction status report | CC BY-SA 4.0 | 23 Oct 2026, 23:02 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Schull Community Pre-School · Crèche | 13 Dec 2023 · report · Tusla Early Years Inspectorate | approx. 401 m |
How we work this out
How busy is this area About as busy as most of Cork County Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
What's the area like?
This street block against the council
64% owner-occupied (council 73%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047295006
Schools, stops and the council
Schools
- Schull Community College · postprimary · 359 pupils · 157 m
- Scoil Mhuire N.S., · primary · 151 pupils · 595 m
Stops 4
- Schull · 237, 265 · 1/hour at peak · 399 m
- Schull · 237, 265 · 0/hour at peak · 399 m
- Meenvane · 237, 265 · 0/hour at peak · 536 m
- Meenvane · 237, 265 · 1/hour at peak · 566 m
Schools growing or shrinking planning in 3 years · pupils last year
- Schull Community College · 156 m0% pupils (359)
- Scoil Mhuire N.S., · 595 m-3.2% pupils (151)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 25 Oct 2026, 23:02 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Council consultation portals | Public | 1 Nov 2026, 01:08 | open |
| Council meetings (ModernGov) | Public | 1 Nov 2026, 02:24 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Skull
- Electoral division
- Skull
- Electoral area
- Bantry-West Cork
- Council
- Cork County Council
Everything we found, as a list 8 lines
- Zoned R2 (existing residential); no vacant land tax.
- Flood Zone A 88 m away on the Cork County Development Plan 2022-2028 flood map.
- 2 sites nearby could change: 1 approved scheme, 1 empty zoned plot.
- 57 homes approved nearby, not started; largest 57 at Colla Road Skull Skull Co. Cork.
- Schull (bus 237, 265) 399 m away: 6 a day, fewer than one an hour at morning peak.
- Here (2022 census): 64% owner-occupied (council 73%); 61% of homes empty (council 13%); most built 2001–2010; 40% drive to work (council 66%); population up 6% since 2016.
- The council decides in a median 67 days (about 10 weeks).
- Homes started within 1 km: 2 in the last year, 22 three years before.
What the terms mean 6 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 28
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 30 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 1 Nov 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 1 Nov 2026 |
| www2.courts.ie | — | © the publisher | 31 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 26 Oct 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC BY 4.0 | 26 Oct 2026 |
| services-eu1.arcgis.com | — | CC BY 4.0 | — |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 25 Oct 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 1 Nov 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 1 Nov 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 1 Nov 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 25 Oct 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 28 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 25 Oct 2026 |