Planning report · Cork County Council · 500 m around the house · the last 12 months · 11 Oct 2026, 15:54

Coastguard Cottages

51.52844, -9.54180

Homes here mostly date from before 1919. 3 planning files on this house, the latest from 2024. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 3 planning files on this house, the latest from 2025.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 3 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of MeenvaneBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2025: 24/664 · attic or dormer, approved2010: 10/220 · new house, approved2007: 07/173 · attic or dormer, approved1998: 2 files on Meenvane1999: 7 files on Meenvane2000: 4 files on Meenvane2001: 4 files on Meenvane2002: 3 files on Meenvane2003: 7 files on Meenvane2004: 10 files on Meenvane2005: 5 files on Meenvane2006: 8 files on Meenvane2007: 5 files on Meenvane2008: 3 files on Meenvane2009: 2 files on Meenvane2010: 3 files on Meenvane2011: 2 files on Meenvane2012: 3 files on Meenvane2013: 3 files on Meenvane2014: 3 files on Meenvane2015: 3 files on Meenvane2016: 3 files on Meenvane2017: 1 file on Meenvane2018: 1 file on Meenvane2019: 3 files on Meenvane2020: 1 file on Meenvane2021: 6 files on Meenvane2022: 7 files on Meenvane2023: 5 files on Meenvane2024: 4 files on Meenvane2025: 1 file on Meenvane109 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    24/664 · attic or dormer · approved 2025 · started, no sign-off needed
    approvedstartedsigned off?
  2. 2010
    10/220 · new house · approved 2010 · built? unknown
    approvedstarted?signed off?
  3. 2007
    07/173 · attic or dormer · approved 2007 · built? unknown
    approvedstarted?signed off?
On this site
R2
Zoning · Existing residential
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Schull (101 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings24house; Allied Irish Bank
Monuments2Standing stone; R100317
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: zoning, epa_leap, rzlt, constraints, constraints.niah, constraints.smr · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
epa_leapCC-BY-4.05 Oct 2026, 23:09open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 10 Oct 2026, 23:46
SourceLicenceFetchedLink
bcmsCC-BY-4.010 Oct 2026, 23:46open
npadCC-BY-4.011 Oct 2026, 01:43open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92% by type. A new house in a garden is harder: 94% approved.

Attic or dormer12 decided · more info asked 0%
92% · council 96%
New house in a garden or site32 decided · more info asked 0%
94% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 44 nearby, 9,057 council-wide

Figure 3

Meenvane, file by file since 1998

37 of 38 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 5.

109 planning files on Meenvane since 1998, by kind and decision.199820002002200420062008201020122014201620182020202220242026Extensions, atticsNo number · 1998 · porch / front · approved · 98/963No number · 1999 · other extension · approved · 99/1167No number · 1999 · attic conversion / dormer · approved · 99/2208No. 48 · 1999 · first-floor · approved · 99/3970No number · 1999 · other extension · approved · 99/4064No. 48 · 1999 · other extension · approved · 99/5714No number · 2000 · other extension · approved · 00/3490No number · 2002 · other extension · approved · 02/1659No number · 2003 · other extension · approved · 03/376No number · 2003 · attic conversion / dormer · approved · 03/5001No. 9 · 2003 · attic conversion / dormer · approved · 03/75No. 8 · 2004 · attic conversion / dormer · approved · 04/3010No number · 2004 · other extension · approved · 04/5028No. 12 · 2004 · attic conversion / dormer · undecided · 04/9770No number · 2005 · attic conversion / dormer · approved · 05/229No. 7 · 2005 · attic conversion / dormer · undecided · 05/7691No. 7 · 2006 · attic conversion / dormer · approved · 06/713No. 6 · 2007 · attic conversion / dormer · approved · 07/173No. 1 · 2007 · rear · undecided · 07/2807No. 1 · 2007 · rear · approved · 07/2905No number · 2008 · first-floor · undecided · 08/116No number · 2008 · first-floor · undecided · 08/57No number · 2010 · other extension · approved · 10/402No number · 2010 · single-storey rear · approved · 10/98No number · 2012 · other extension · approved · 12/533No number · 2013 · other extension · approved · 13/160No number · 2014 · other extension · approved · 14/570No number · 2015 · other extension · undecided · 15/164No number · 2015 · other extension · approved · 15/202No. 8 · 2015 · attic conversion / dormer · approved · 15/275No. 7 · 2016 · porch / front · approved · 16/26No number · 2017 · other extension · approved · 17/679No number · 2018 · other extension · approved · 18/211No number · 2019 · first-floor · approved · 19/710No. 13 · 2020 · attic conversion / dormer · approved · 20/570No number · 2021 · garden room · approved · 21/12No number · 2021 · rear · approved · 21/17No. 10 · 2021 · rear · undecided · 21/376No. 10 · 2021 · two-storey rear · approved · 21/472No number · 2021 · other extension · undecided · 21/890No number · 2022 · other extension · approved · 22/592No number · 2023 · other extension · undecided · 23/118No number · 2023 · other extension · approved · 23/190No number · 2024 · attic conversion / dormer · refused · 24/155No. 16 · 2024 · attic conversion / dormer · undecided · 24/257No. 16 · 2024 · attic conversion / dormer · approved · 24/319No. 5 · 2024 · attic conversion / dormer · approved · 24/664No. 14 · 2025 · attic conversion / dormer · approved · 25/362Porches, roofs, otherNo number · 1998 · other work · approved · 98/263No number · 1999 · other work · undecided · 99/326No number · 1999 · other work · approved · 99/60No number · 2000 · other work · approved · 00/4030No number · 2000 · other work · undecided · 00/912No number · 2001 · other work · approved · 01/1210No number · 2001 · other work · approved · 01/5102No number · 2001 · other work · approved · 01/5192No number · 2001 · other work · approved · 01/6061No number · 2002 · other work · approved · 02/1652No number · 2002 · other work · approved · 02/3839No number · 2003 · other work · approved · 03/1197No number · 2003 · other work · undecided · 03/2619No number · 2003 · other work · approved · 03/4460No number · 2003 · other work · undecided · 03/6117No number · 2004 · other work · approved · 04/100No number · 2004 · other work · approved · 04/1973No number · 2004 · other work · approved · 04/3611No number · 2004 · other work · approved · 04/7569No. 7 · 2004 · other work · approved · 04/8457No number · 2004 · other work · approved · 04/9417No number · 2004 · other work · approved · 04/9418No number · 2005 · other work · approved · 05/3519No number · 2005 · other work · approved · 05/463No number · 2005 · other work · approved · 05/5539No number · 2006 · other work · approved · 06/1769No number · 2006 · other work · approved · 06/2860No number · 2006 · other work · approved · 06/2888No number · 2006 · other work · refused · 06/648No number · 2006 · other work · approved · 06/721No number · 2006 · other work · approved · 06/921No number · 2007 · other work · undecided · 07/1242No number · 2007 · other work · approved · 07/1618No number · 2008 · other work · approved · 08/1027No number · 2009 · other work · undecided · 09/1060No number · 2009 · other work · approved · 09/1086No. 4 · 2010 · other work · approved · 10/220No number · 2012 · other work · undecided · 12/242No number · 2012 · other work · approved · 12/262No number · 2013 · other work · approved · 13/261No number · 2016 · other work · approved · 16/343No number · 2019 · other work · approved · 19/173No number · 2019 · other work · approved · 19/769No. 16 · 2021 · other work · undecided · 21/250No number · 2022 · other work · approved · 22/28No number · 2022 · other work · approved · 22/306No number · 2022 · other work · approved · 22/543No number · 2022 · other work · undecided · 22/641No number · 2022 · other work · undecided · 22/705No number · 2022 · other work · approved · 22/757No number · 2023 · other work · approved · 23/26No number · 2023 · other work · approved · 23/293New house in a side gardenNo number · 2000 · new house · undecided · 00/4020No number · 2006 · new house · undecided · 06/1591No number · 2011 · new house · approved · 11/117No number · 2011 · new house · undecided · 11/33No number · 2013 · new house · approved · 13/558No number · 2014 · new house · undecided · 14/420No number · 2014 · new house · refused · 14/431No. 47B · 2016 · new house · approved · 16/20647BNo number · 2023 · new house · approved · 23/234
ApprovedRefusedWithdrawn or invalid

109 files with "Meenvane" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 1998–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 11 Oct 2026, 01:43
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Oct 2026, 01:43open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks; Building starts: 147 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 49–109 (n=68)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 147 days after permission (n=37)147 days after permissionSigned off1013 days after the start, for the few who file. 92% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated68 decided home extensions, 50 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Coastguard Cottages with 1 numbered planning items
    ⌖ the houseEmpty land zoned for homes
    1. 11.9 ha zoned for homesEmpty land zoned for homes · 89 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 36 permissions since 2016, 28 show a start notice and 6 have a completion certificate. Most owners opt out of sign-off.

    55 applications lodged within 500 m. Council: 36 approved, 2 refused. After appeals: 36 approved. Of those: 6 signed off, 19 built with the owner's opt-out, 3 started, 8 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT36: lodged → approved2: lodged → refused17: lodged → undecided36: approved → approved2: refused → refused17: undecided → undecided8: approved → no start notice found19: approved → built, owner opted out3: approved → started, not signed off6: approved → signed off55 lodged55 lodged36 approved36 approved2 refused2 refused17 undecided17 undecided36 approved36 approved2 refused2 refused17 undecided17 undecided8 no start notice found8 no start notice found19 built, owner opted out19 built, owner opted out3 started, not signed off3 started, not signed off6 signed off6 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured55 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Empty land zoned for homes 1

      • 11.9 ha zoned for homes · no homes built on it yet · 89 m

      Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

      Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.010 Oct 2026, 23:46open
      derelictCC-BY-4.05 Oct 2026, 09:35open
      npadCC-BY-4.011 Oct 2026, 01:43open
      Figure 7

      Applications within 500 m, by year

      Between 2 and 11 a year; busiest 2022. 95% of decisions were approvals.

      2017: 4, 2018: 2, 2019: 6, 2020: 5, 2021: 9, 2022: 11, 2023: 9, 2024: 7, 2025: 2051015202017: 2 approved2017: 2 undecided4’17*2018: 2 approved2’182019: 5 approved2019: 1 undecided6’192020: 5 approved5’202021: 4 approved2021: 5 undecided9’212022: 6 approved2022: 5 undecided11’222023: 7 approved2023: 2 undecided9’232024: 3 approved2024: 2 refused2024: 2 undecided7’242025: 2 approved2’25
      ApprovedRefusedWithdrawn or invalidUndecided

      2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 0 in the last 12 months

      See every application on the map

        How we work this out
        Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
        Sources: npad, acp, bcms · fetched 11 Oct 2026, 01:43
        SourceLicenceFetchedLink
        npadCC-BY-4.011 Oct 2026, 01:43open
        acpCC-BY-4.09 Oct 2026, 23:03open
        bcmsCC-BY-4.010 Oct 2026, 23:46open
        Building work nearby 1 in the last 12 months
        1 no sign-off needed
        • 5 The Coastguard, Schull, Cork, P81 WV97 · 16 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 24/664 · 11 m
        How we work this out
        Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
        Source: bcms · fetched 10 Oct 2026, 23:46
        SourceLicenceFetchedLink
        bcmsCC-BY-4.010 Oct 2026, 23:46open
        0
        Named places nearby: estate, schemes, crèches, schools

        Named places estate, developments, inspections

        Crèches and schools inspected

        NameLatest inspectionDistance
        Schull Community Pre-School · Crèche13 Dec 2023 · report · Tusla Early Years Inspectorateapprox. 387 m
        How we work this out
        Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
        Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
        SourceLicenceFetchedLink
        schoolsCC-BY-4.027 Sept 2026, 23:32open
        tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
        How busy is this area About as busy as most of Cork County Council.
        Homes approved
        Here57
        Council middle0
        Homes started
        Here10
        Council middle1
        How we work this out
        Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
        Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
        SourceLicenceFetchedLink
        acpCC-BY-4.09 Oct 2026, 23:03open
        bcmsCC-BY-4.010 Oct 2026, 23:46open
        npadCC-BY-4.011 Oct 2026, 01:43open
        Question 5

        What's the area like?

        Figure 8

        This street block against the council

        48% of homes built before 1971 (council 28%). 61% owner-occupied (council 73%).

        Homes built before 1971
        48% · council 28%
        Homes built since 2001
        13% · council 36%
        Owner-occupied
        61% · council 73%
        Rented
        27% · council 22%
        Children under 15
        11% · council 21%
        Aged 65 and over
        29% · council 16%
        Households with 2+ cars
        30% · council 52%
        Work mainly from home
        16% · council 12%
        This small area (214 people)Cork

        MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047295005/047295002

        Bus
        51 m
        Meenvane · 237, 265 · busiest stop within 500 m: 1 an hour at peak
        Nearest school
        279 m
        Scoil Mhuire N.S.,, 151 pupils
        Schools, stops and the council

        Schools

        • Scoil Mhuire N.S., · primary · 151 pupils · 279 m
        • Schull Community College · postprimary · 359 pupils · 756 m

        Stops 4

        • Meenvane · 237, 265 · 1/hour at peak · 51 m
        • Meenvane · 237, 265 · 0/hour at peak · 69 m
        • Schull · 237, 265 · 1/hour at peak · 411 m
        • Schull · 237, 265 · 0/hour at peak · 433 m

        Schools growing or shrinking planning in 3 years · pupils last year

        • Scoil Mhuire N.S., · 279 m-3.2% pupils (151)
        • Schull Community College · 756 m0% pupils (359)
        Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
        SourceLicenceFetchedLink
        gtfsCC-BY-4.04 Oct 2026, 23:41open
        schoolsCC-BY-4.027 Sept 2026, 23:32open
        npadCC-BY-4.011 Oct 2026, 01:43open
        consultpublic11 Oct 2026, 01:25open
        moderngovpublic11 Oct 2026, 01:26open
        lda_landsCC-BY-4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Attic or dormer (24/664) built without official sign-off: built properly?
          Ask for: An engineer's opinion of compliance.
          Seller · solicitor
        2. New house (10/220) approved 2010: built as approved?
          Ask for: The grant and an opinion of compliance.
          Seller · solicitor
        3. Attic or dormer (07/173) approved 2007: built as approved?
          Ask for: The grant and an opinion of compliance.
          Seller · solicitor
        4. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Meenvane
        Electoral division
        Skull
        Electoral area
        Bantry-West Cork
        Council
        Cork County Council
        Everything we found, as a list 8 lines
        • 3 applications on this site; latest 24/664, approved 2025, started, no sign-off needed.
        • Zoned R2 (existing residential); no vacant land tax.
        • Flood Zone A 66 m away on the Cork County Development Plan 2022-2028 flood map.
        • 1 site nearby could change: 1 empty zoned plot.
        • Meenvane (bus 237, 265) 51 m away: 6 a day, fewer than one an hour at morning peak; 2 from all stops within 500 m.
        • Here (2022 census): 61% owner-occupied (council 73%); 46% of homes empty (council 13%); most built before 1919; 42% drive to work (council 66%); population up 6% since 2016.
        • The council decides in a median 66 days (about 9 weeks).
        • Homes started within 1 km: 3 in the last year, 21 three years before.
        What the terms mean 5 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 28
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.010 Oct 2026
        data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
        dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public11 Oct 2026
        www2.courts.ie—all-rights-reserved11 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
        data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.05 Oct 2026
        services-eu1.arcgis.com—CC-BY-4.0—
        transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
        lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)public11 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.011 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…11 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
        gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
        gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
        tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 11 Oct 2026, 15:54 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.