Planning report · Cork County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 02:27

Patrick Street

51.62396, -8.89123

Homes here mostly date from the 1950s. 1 planning file on this house, the latest from 2023. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 11 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 1 planning file on this house, the latest from 2023.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 1 planning file on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Tawnies UpperBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2023: 23/473 · extension, approved2021: 2 files on Tawnies Upper2022: 1 file on Tawnies Upper2023: 1 file on Tawnies Upper2024: 1 file on Tawnies Upper2025: 2 files on Tawnies Upper7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    23/473 · extension · approved 2023 · not started, runs out 2028
    approvedstartedsigned off
  • 21 Apr 2025 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · inside the zone around a recorded monument (CO135-019001-)
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Heritage inventory15 within 100 m Kilgarriff Parochial Hall; house
Monument zoneOn this site Graveyard, Tawnies Upper; Church, Tawnies Upper

Not on this site: protected building, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Clonakilty and Environs (709 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings162house
Monuments10Graveyard; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, SMR zones of notification, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 90% approved.

New house in a garden or site30 decided · more info asked 0%
90% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 30 nearby, 4,519 council-wide

Figure 3

Tawnies Upper, file by file since 2021

3 of 3 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

7 planning files on Tawnies Upper since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · side · approved · 21/378No number · 2021 · other extension · undecided · 21/92No. 8 · 2022 · attic conversion / dormer · approved · 22/509No number · 2023 · other extension · approved · 23/294Porches, roofs, otherNo number · 2025 · other work · undecided · 25/420No number · 2025 · other work · approved · 25/5857New house in a side gardenNo number · 2024 · new house · approved · 24/98
ApprovedRefusedWithdrawn or invalid

7 files with "Tawnies Upper" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 2 within 250 m · 1 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear21—

Refused within 100 m 1 in the last 12 months

  • 26/0226 · work already done · refused 31 Mar 2026 · 43 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 55 days. Building starts about 11 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; Appeal window: 4 weeks; Building starts: 349 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 mo24 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–102 (n=41)55 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 349 days after permission (n=9)349 days after permissionSigned off44% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated41 decided home extensions, 9 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Appeals nearby 1 in the last 12 months
  • 501246 Granted · 55 & 31, Pearse Street, Clonakilty, Co. Cork · 43 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 4

What's changing around you?

Street map around Patrick Street with 11 numbered planning items
⌖ the houseWindow closingRefusedBuilding startedEmpty land zoned for homesApprovedNo decision yet
  1. 126/27, Rossa Street 26/0494Approved with conditions · 225 m
  2. 2No. 16 Connolly Street, Clonakilty 26/0396Approved · 234 m
  3. 3Seymour Street, Clonakilty 26/2194Refused · 289 m
  4. 455 & 31, Pearse Street 26/0226Refused · 43 m
  5. 55 Tawnies Lower, Clonakilty 24422Building started · 132 m
  6. 61.5 ha zoned for homesEmpty land zoned for homes · 198 m
  7. 710, McCurtain Hill 26/1652Approved with conditions · 136 m
  8. 861 Pearse Street, Clonakilty 26/0587Approved with conditions · 215 m
  9. 915 Rossa Street, Clonakilty 25/6806Approved with conditions · 269 m
  10. 10The Old Linen Hall at the Corner of Connolly and Casement Street, Clonakilty 26/0817No decision yet · 290 m
  11. 1120 Wolfe Tone Street, Clonakilty 26/1915Approved with conditions · 417 m
Figure 5

What happens to applications within 500 m

Permission isn't building. Of 40 permissions since 2016, 5 show a start notice and 0 have a completion certificate.

75 applications lodged within 500 m. Council: 40 approved, 6 refused. After appeals: 40 approved. Of those: 0 signed off, 1 built with the owner's opt-out, 4 started, 35 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT40: lodged → approved6: lodged → refused1: lodged → withdrawn or invalid28: lodged → undecided40: approved → approved6: refused → refused1: withdrawn or invalid → withdrawn28: undecided → undecided35: approved → no start notice found1: approved → built, owner opted out4: approved → started, not signed off75 lodged75 lodged40 approved40 approved6 refused6 refused1 withdrawn or invalid1 withdrawn or invalid28 undecided28 undecided40 approved40 approved6 refused6 refused1 withdrawn1 withdrawn28 undecided28 undecided35 no start notice found35 no start notice found1 built, owner opted out1 built, owner opted out4 started, not signed off4 started, not signed off

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured75 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 6

The next 30 days

3 deadlines within 500 m; the first closes 3 Nov 2026.

3 deadlines in the next 30 days: 2026-11-03 26/0494: Grant with Conditions — Permission for installation of new front elevation door for access to vacant residential upper floors, permission to alt; 2026-11-12 26/2194: Refused — The construction of a 3-storey apartment building, comprising of 10 no. apartment units (2no. studios, 2no. 1-bed and 6n; 2026-11-19 26/0396: Grant Permission — a) Retention Permission to complete the single storey extensions to the rear of No. 16 & No. 17 Connolly Street, Clonakitoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec26/0494: Grant with Conditions — Permission for installation of new front elevation door for access to vacant residential upper floors, permission to alt · 225 m away · 2026-11-0326/2194: Refused — The construction of a 3-storey apartment building, comprising of 10 no. apartment units (2no. studios, 2no. 1-bed and 6n · 289 m away · 2026-11-1226/0396: Grant Permission — a) Retention Permission to complete the single storey extensions to the rear of No. 16 & No. 17 Connolly Street, Clonaki · 234 m away · 2026-11-19
Time to appeal ends
  • Time to appeal ends 3 Nov 20262 days left
    126/0494 · Grant with Conditions — Permission for installation of new front elevation door for access to vacant residential upper…
    €220 to An Coimisiún Pleanála (€110 observer) · 225 m away
  • Time to appeal ends 12 Nov 202611 days left
    326/2194 · Refused — The construction of a 3-storey apartment building, comprising of 10 no. apartment units (2no. studios, 2no.…
    €220 to An Coimisiún Pleanála (€110 observer) · 289 m away
  • Time to appeal ends 19 Nov 202618 days left
    226/0396 · Grant Permission — a) Retention Permission to complete the single storey extensions to the rear of No. 16 & No. 17…
    €220 to An Coimisiún Pleanála (€110 observer) · 234 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Sites that could change 1 within 500 m

Empty land zoned for homes 1

  • 61.5 ha zoned for homes · no homes built on it yet · 198 m

Not covered here: council land to be sold (Dublin only).

Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 7

Applications within 500 m, by year

Between 11 and 16 a year; busiest 2024. 87% of decisions were approvals.

2021: 12, 2022: 13, 2023: 12, 2024: 16, 2025: 11, 2026: 11051015202021: 7 approved2021: 2 refused2021: 3 undecided12’21*2022: 6 approved2022: 1 refused2022: 6 undecided13’222023: 8 approved2023: 4 undecided12’232024: 8 approved2024: 1 refused2024: 7 undecided16’242025: 6 approved2025: 1 withdrawn or invalid2025: 4 undecided11’252026: 5 approved2026: 2 refused2026: 4 undecided11’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Every application within 500 m 14 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Building work nearby 3 in the last 12 months
2 not signed off1 no sign-off needed
  • Sand Quay, Clonakilty, Cork, P85 VP08 · 9 Oct 2026 · start notice not signed off · 379 m
  • 55 Tawnies Lower, Clonakilty, Cork · 3 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 24422 · 132 m
  • Tawnies Lower, Clonakilty, Cork · 5 Dec 2025 · 1 homes · start notice not signed off · 24/485 · 436 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
0
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Crèches and schools inspected

NameLatest inspectionDistance
Clonakilty Montessori Pre- School · Crèche4 Jun 2024 · report · Tusla Early Years Inspectorate224 m
Grainne's Montessori School · Crèche2 Mar 2026 · report · Tusla Early Years Inspectorate796 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
SourceLicenceFetchedLink
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register28 Oct 2026, 23:19open
How busy is this area Busier than most of Cork County Council.
Homes approved
Here285
Council middle0
Homes started
Here86
Council middle1
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 5

What's the area like?

Figure 8

This street block against the council

61% of homes built before 1971 (council 28%). 69% owner-occupied (council 73%).

Homes built before 1971
61% · council 28%
Homes built since 2001
1% · council 36%
Owner-occupied
69% · council 73%
Rented
29% · council 22%
Children under 15
11% · council 21%
Aged 65 and over
38% · council 16%
Households with 2+ cars
20% · council 52%
Work mainly from home
11% · council 12%
This small area (177 people)Cork

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047096013

Bus
85 m
Clonakilty · 253, 253t · busiest stop within 500 m: 3 an hour at peak
Nearest school
304 m
Clonakilty Community College, 696 pupils
Schools, stops and the council

Schools

  • Clonakilty Community College · postprimary · 696 pupils · 304 m
  • Scoil na mBuachailli · primary · 235 pupils · 354 m
  • St Joseph'S Girls National School · primary · 192 pupils · 796 m
  • Sacred Heart Secondary School · postprimary · 568 pupils · 807 m
  • Gaelscoil Mhichíl Uí Choileáin · primary · 388 pupils · 812 m

Stops 3

  • Clonakilty · 253, 253t · 1/hour at peak · 85 m
  • Clonakilty · 237 · 115 m
  • Clonakilty N71 · 230, 237, 253, 253t · 3/hour at peak · 424 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Clonakilty Community College · 304 m-0.6% pupils (696)
  • Scoil na mBuachailli · 354 m-7.1% pupils (235)
  • St Joseph'S Girls National School · 796 m-7.2% pupils (192) · an extension 2026, approved with conditions
  • Sacred Heart Secondary School · 807 m+1.8% pupils (568) · an extension 2026, approved with conditions
  • Gaelscoil Mhichíl Uí Choileáin · 812 m+0.5% pupils (388)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Council consultation portalsPublic1 Nov 2026, 01:08open
Council meetings (ModernGov)Public1 Nov 2026, 02:24open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. Extension (23/473) approved 2023, not started: still planned?
    Ask for: The grant, and whether it stays with the house.
    Seller · solicitor
  2. Next to a recorded monument: does digging need notice?
    Ask for: Details of past works from the seller.
    Seller · council
  3. Decision 225 m away can be appealed until 3 Nov 2026: appeal?
    Ask for: The decision on the council's website (€220 to appeal).
    Council
  4. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Tawnies Upper
Electoral division
Clonakilty Urban
Electoral area
Skibbereen-West Cork
Council
Cork County Council
Everything we found, as a list 8 lines
  • 1 application on this site; latest 23/473, approved 2023, not started, runs out 2028.
  • Zoned R2 (existing residential); monument zone; no vacant land tax.
  • Flood Zone A 71 m away on the Cork County Development Plan 2022-2028 flood map.
  • 1 site nearby could change: 1 empty zoned plot.
  • 1 application refused within 100 m since 2025; latest for work already done (2026).
  • Clonakilty N71 (bus 230, 237) 424 m away: 3 an hour at morning peak.
  • Here (2022 census): 69% owner-occupied (council 73%); 14% of homes empty (council 13%); most built 1946–1960; 52% drive to work (council 66%); population up 10% since 2016.
  • 2 home extensions within 250 m since 2025. Most were single-storey rear extensions.
What the terms mean 6 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 29
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
www2.courts.ie—© the publisher31 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
services-eu1.arcgis.com—CC BY 4.0—
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 1 Nov 2026, 02:27 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.