Planning report · Cork County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 21:43

Clonakilty Urban ED, West Cork, County Cork, Munster, Éire / Ireland

51.62879, -8.90591

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Tawnies LowerBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 6 files on Tawnies Lower2023: 7 files on Tawnies Lower2024: 6 files on Tawnies Lower2025: 6 files on Tawnies Lower2026: 2 files on Tawnies Lower27 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments3Souterrain; R107927
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 88% approved.

New house in a garden or site25 decided · more info asked 0%
88% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 25 nearby, 4,519 council-wide

Figure 3

Tawnies Lower, file by file since 2021

4 of 5 decided extensions on the road were approved. New houses in side gardens or on sites: 10 of 10.

27 planning files on Tawnies Lower since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · other extension · approved · 21/488No number · 2023 · other extension · refused · 23/309No number · 2023 · attic conversion / dormer · approved · 23/329No number · 2023 · attic conversion / dormer · approved · 23/487No number · 2026 · other extension · approved · 26/0185No number · 2026 · other extension · undecided · 26/2311Porches, roofs, otherNo. 2 · 2021 · other work · approved · 21/794No number · 2023 · other work · undecided · 23/310No number · 2023 · other work · approved · 23/347No number · 2023 · other work · approved · 23/464No number · 2025 · other work · approved · 25/232New house in a side gardenNo number · 2021 · new house · approved · 21/140No number · 2021 · new house · undecided · 21/278No number · 2021 · new house · approved · 21/307No number · 2021 · new house · undecided · 21/75No number · 2023 · new house · approved · 23/465No. 4 · 2024 · new house · undecided · 24/2804No. 5 · 2024 · new house · undecided · 24/281No. 6 · 2024 · new house · undecided · 24/282No. 4 · 2024 · new house · approved · 24/421No. 5 · 2024 · new house · approved · 24/422No. 6 · 2024 · new house · approved · 24/424No. 4 · 2025 · new house · approved · 25/1554No. 5 · 2025 · new house · approved · 25/406No number · 2025 · new house · undecided · 25/6037No number · 2025 · new house · approved · 25/6280No number · 2025 · new house · approved · 25/6695
ApprovedRefusedWithdrawn or invalid

27 files with "Tawnies Lower" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Other11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 51–90 (n=34)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated34 decided home extensions, 4 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Clonakilty Urban ED, West Cork, County Cork, Munster, Éire / Ireland with 3 numbered planning items
    ⌖ the houseApprovedNo decision yet
    1. 1Valeview, Tawnies Lower 26/0185Approved with conditions · 115 m
    2. 2Tawnies Lower, Clonakilty 25/6695Approved with conditions · 162 m
    3. 3Fernhill Hotel & Estate, Fernhill Road 26/2311No decision yet · 282 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 18 permissions since 2016, 5 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    28 applications lodged within 500 m. Council: 18 approved, 1 refused. After appeals: 18 approved. Of those: 0 signed off, 4 built with the owner's opt-out, 1 started, 13 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT18: lodged → approved1: lodged → refused9: lodged → undecided18: approved → approved1: refused → refused9: undecided → undecided13: approved → no start notice found4: approved → built, owner opted out1: approved → started, not signed off28 lodged28 lodged18 approved18 approved1 refused1 refused9 undecided9 undecided18 approved18 approved1 refused1 refused9 undecided9 undecided13 no start notice found13 no start notice found4 built, owner opted out4 built, owner opted out1 started, not signed off1 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured28 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Applications within 500 m, by year

      Between 1 and 8 a year; busiest 2023. 95% of decisions were approvals.

      2021: 5, 2022: 1, 2023: 8, 2024: 6, 2025: 6, 2026: 205102021: 3 approved2021: 2 undecided5’21*2022: 1 approved1’222023: 5 approved2023: 1 refused2023: 2 undecided8’232024: 3 approved2024: 3 undecided6’242025: 5 approved2025: 1 undecided6’252026: 1 approved2026: 1 undecided2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 3 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Building work nearby 2 in the last 12 months
      1 not signed off1 no sign-off needed
      • Tawnies Lower, Clonakilty, Cork · 6 Apr 2026 · 1 homes · start notice not signed off · 25/6695 · 188 m
      • Ballinaffrin, Clonakilty, Cork · 16 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25155 · 342 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      0
      Named places nearby: estate, schemes, crèches, schools
      How busy is this area Busier than most of Cork County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here42
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      2% of homes built before 1971 (council 28%). 74% owner-occupied (council 73%).

      Homes built before 1971
      2% · council 28%
      Homes built since 2001
      64% · council 36%
      Owner-occupied
      74% · council 73%
      Rented
      24% · council 22%
      Children under 15
      20% · council 21%
      Aged 65 and over
      9% · council 16%
      Households with 2+ cars
      54% · council 52%
      Work mainly from home
      10% · council 12%
      This small area (247 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047096004

      Nearest school
      658 m
      Gaelscoil Mhichíl Uí Choileáin, 388 pupils
      Schools, stops and the council

      Schools

      • Gaelscoil Mhichíl Uí Choileáin · primary · 388 pupils · 658 m

      Stops 0

        Schools growing or shrinking planning in 3 years · pupils last year

        • Gaelscoil Mhichíl Uí Choileáin · 658 m+0.5% pupils (388)
        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Oct 2026, 23:04open
        National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
        Council consultation portalsPublic31 Oct 2026, 01:06open
        Council meetings (ModernGov)Public31 Oct 2026, 02:21open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Tawnies Lower
        Electoral division
        Clonakilty Urban
        Electoral area
        Skibbereen-West Cork
        Council
        Cork County Council
        Everything we found, as a list 8 lines
        • Zoned R2 (existing residential); no vacant land tax.
        • Nothing nearby looks set to change.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 74% owner-occupied (council 73%); 2% of homes empty (council 13%); most built 2001–2010; 70% drive to work (council 66%); population up 10% since 2016.
        • 1 home extension within 250 m since 2026.
        • The council decides in a median 67 days (about 10 weeks).
        • 3 applications nearby in the last 12 months.
        • 42 homes started within 1 km in 3 years (council middle 1).
        What the terms mean 5 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 24
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
        www2.courts.ie—© the publisher30 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Oct 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 31 Oct 2026, 21:43 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.