Planning report · Cork County Council · 2000 m around the house · the last 12 months · 22 Oct 2026, 00:53

R588

51.63591, -8.89897

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Tawnies UpperBuilt: most homes in this small area date from 2001–2010 (census estimate)most built1998: 1 file on Tawnies Upper1999: 1 file on Tawnies Upper2000: 3 files on Tawnies Upper2001: 4 files on Tawnies Upper2005: 2 files on Tawnies Upper2006: 2 files on Tawnies Upper2011: 5 files on Tawnies Upper2013: 3 files on Tawnies Upper2022: 4 files on Tawnies Upper2023: 2 files on Tawnies Upper2025: 4 files on Tawnies Upper2026: 3 files on Tawnies Upper34 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G3
Zoning · High amenity
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningG3 · High amenity
What it says

Greenbelt1: Discourage strongly new individual housing from being located within the greenbelts around the Main Towns.

Protected high-amenity landscape. Development is resisted to preserve the character of the area.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings175house
Monuments72Ringfort - rath; Souterrain
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 94% approved.

New house in a garden or site33 decided · more info asked 0%
94% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 33 nearby, 8,048 council-wide

Figure 3

Tawnies Upper, file by file since 1998

12 of 12 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 4.

34 planning files on Tawnies Upper since 1998, by kind and decision.199820002002200420062008201020122014201620182020202220242026Extensions, atticsNo number · 1999 · other extension · approved · 99/7183No number · 2000 · porch / front · approved · 00/7850No number · 2001 · other extension · approved · 01/1597No number · 2001 · other extension · approved · 01/2777No number · 2001 · other extension · approved · 01/6316No number · 2011 · other extension · approved · 11/19No number · 2011 · other extension · approved · 11/769No number · 2013 · other extension · approved · 13/314No. 38K · 2022 · other extension · approved · 22/454No. 6 · 2022 · porch / front · approved · 22/642No. 4 · 2023 · porch / front · undecided · 23/505No. 4 · 2023 · porch / front · approved · 23/614No number · 2025 · other extension · approved · 25/6251Porches, roofs, otherNo number · 1998 · other work · refused · 98/509No number · 2000 · other work · approved · 00/2846No number · 2000 · other work · approved · 00/2919No number · 2001 · other work · refused · 01/4692No number · 2005 · other work · refused · 05/7205No number · 2006 · other work · approved · 06/1195No number · 2006 · other work · undecided · 06/916No number · 2011 · other work · undecided · 11/172No number · 2011 · other work · undecided · 11/223No number · 2011 · other work · approved · 11/251No number · 2022 · other work · undecided · 22/11No number · 2022 · other work · approved · 22/65No number · 2025 · other work · undecided · 25/235No number · 2025 · other work · undecided · 25/268No number · 2025 · other work · approved · 25/320No number · 2026 · other work · approved · 26/0786New house in a side gardenNo number · 2005 · new house · approved · 05/4685No number · 2013 · new house · undecided · 13/462No number · 2013 · new house · approved · 13/498No number · 2026 · new house · refused · 26/0067No number · 2026 · new house · approved · 26/1630
ApprovedRefusedWithdrawn or invalid

34 files with "Tawnies Upper" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 1998–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days.

    Comments open: 5 weeks · €20; Council decision: 53 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–89 (n=38)53 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off20% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated38 decided home extensions, 5 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Appeals nearby 2 in the last 12 months
    • 501246 Granted · 55 & 31, Pearse Street, Clonakilty, Co. Cork · 1.5 km
    • 323979 Other · Cloheen, Clonakilty, Co. Cork. · 1.8 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher21 Oct 2026, 01:40open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 4

    What's changing around you?

    Street map around R588 with 15 numbered planning items
    ⌖ the houseWindow closingBuilding startedEmpty land zoned for homesApprovedRefused
    1. 126/27, Rossa Street 26/0494Approved with conditions · 1.6 km
    2. 2Seymour Street, Clonakilty 26/2194Refused · 1.7 km
    3. 3Tawnies Upper, Clonakilty 261630Building started · 153 m
    4. 41.5 ha zoned for homesEmpty land zoned for homes · 1.4 km
    5. 50.4 ha zoned for homesEmpty land zoned for homes · 1.8 km
    6. 61.2 ha zoned for homesEmpty land zoned for homes · 1.9 km
    7. 72.4 ha zoned for homesEmpty land zoned for homes · 1.9 km
    8. 8Tawnies Upper, Clonakilty 26/0786Approved with conditions · 15 m
    9. 9Tawnies Upper, Clonakilty 26/1630Approved with conditions · 139 m
    10. 10Tawnies Upper, Clonakilty 26/0067Refused · 229 m
    11. 11Tawnies Upper, Clonakilty 25/6251Approved with conditions · 337 m
    12. 12Tawnies Lower, Clonakilty 25/6280Approved with conditions · 692 m
    13. 13Templebryan North, Clonakilty 25/6513Approved with conditions · 863 m
    14. 14Templebryan North, Clonakilty 25/6501Approved with conditions · 901 m
    15. 15Valeview, Tawnies Lower 26/0185Approved with conditions · 1.0 km
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 11 permissions since 2016, 2 show a start notice and 1 has a completion certificate.

    15 applications lodged within 500 m. Council: 11 approved, 1 refused. After appeals: 11 approved. Of those: 1 signed off, 1 built with the owner's opt-out, 0 started, 9 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT11: lodged → approved1: lodged → refused3: lodged → undecided11: approved → approved1: refused → refused3: undecided → undecided9: approved → no start notice found1: approved → built, owner opted out1: approved → signed off15 lodged15 lodged11 approved11 approved1 refused1 refused3 undecided3 undecided11 approved11 approved1 refused1 refused3 undecided3 undecided9 no start notice found9 no start notice found1 built, owner opted out1 built, owner opted out1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured15 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 2.0 km; the first closes 3 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-03 26/0494: Grant with Conditions — Permission for installation of new front elevation door for access to vacant residential upper floors, permission to alt; 2026-11-12 26/2194: Refused — The construction of a 3-storey apartment building, comprising of 10 no. apartment units (2no. studios, 2no. 1-bed and 6ntoday26 Oct31 Oct5 Nov10 Nov15 Nov20 Nov26/0494: Grant with Conditions — Permission for installation of new front elevation door for access to vacant residential upper floors, permission to alt · 1.6 km away · 2026-11-0326/2194: Refused — The construction of a 3-storey apartment building, comprising of 10 no. apartment units (2no. studios, 2no. 1-bed and 6n · 1.7 km away · 2026-11-12
    Time to appeal ends
    • Time to appeal ends 3 Nov 202613 days left
      126/0494 · Grant with Conditions — Permission for installation of new front elevation door for access to vacant residential upper…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.6 km away
    • Time to appeal ends 12 Nov 202622 days left
      226/2194 · Refused — The construction of a 3-storey apartment building, comprising of 10 no. apartment units (2no. studios, 2no.…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.7 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 4 within 2.0 km

    Empty land zoned for homes 4

    • 41.5 ha zoned for homes · no homes built on it yet · 1.4 km
    • 50.4 ha zoned for homes · no homes built on it yet · 1.8 km
    • 61.2 ha zoned for homes · no homes built on it yet · 1.9 km
    • 72.4 ha zoned for homes · no homes built on it yet · 1.9 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 7

    Applications within 500 m, by year

    Between 1 and 5 a year; busiest 2022. 92% of decisions were approvals.

    2018: 2, 2019: 1, 2022: 5, 2023: 3, 2025: 1, 2026: 305102018: 1 approved2018: 1 undecided2’18*2019: 1 approved1’192022: 4 approved2022: 1 undecided5’222023: 2 approved2023: 1 undecided3’232025: 1 approved1’252026: 2 approved2026: 1 refused3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2018 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 2.0 km 39 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Building work nearby 11 in the last 12 months
    7 not signed off4 no sign-off needed
    • Templebryan North, Clonakilty, Cork · 30 Oct 2026 · 1 homes · start notice not signed off · 25/6513 · 937 m
    • 3Tawnies Upper, Clonakilty, Cork · 23 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 261630 · 153 m
    • Sand Quay, Clonakilty, Cork, P85 VP08 · 9 Oct 2026 · start notice not signed off · 1.7 km
    • Sacred Heart School, Scartagh, Clonakilty, Cork, P85 KW28 · 22 Jun 2026 · start notice not signed off · 1.6 km
    • 5 Tawnies Lower, Clonakilty, Cork · 3 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 24422 · 1.4 km
    • Templebyran South, Clonakilty, Cork, P85 NX76 · 18 May 2026 · 1 homes · short notice no sign-off needed · 25/6170 · 1.5 km
    • Tawnies Lower, Clonakilty, Cork · 6 Apr 2026 · 1 homes · start notice not signed off · 25/6695 · 1.1 km
    • Ballinaffrin, Clonakilty, Cork · 16 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25155 · 691 m
    • Clogheen Road, Clonakilty, Cork · 4 Mar 2026 · 31 homes · start notice not signed off · 24/299 · 1.9 km
    • Tawnies Lower, Clonakilty, Cork · 5 Dec 2025 · 1 homes · start notice not signed off · 24/485 · 1.2 km
    • Templebryan North, Shannonvale, Clonakilty, Cork · 31 Oct 2025 · 1 homes · start notice not signed off · 24/676 · 1.1 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 21 Oct 2026, 01:58
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    How busy is this area About as busy as most of Cork County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here3
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    72% owner-occupied (council 73%).

    Homes built before 1971
    32% · council 28%
    Homes built since 2001
    47% · council 36%
    Owner-occupied
    72% · council 73%
    Rented
    22% · council 22%
    Children under 15
    24% · council 21%
    Aged 65 and over
    14% · council 16%
    Households with 2+ cars
    61% · council 52%
    Work mainly from home
    19% · council 12%
    This small area (336 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047095001

    Nearest school
    1.4 km
    Gaelscoil Mhichíl Uí Choileáin, 388 pupils
    Schools, stops and the council

    Schools

    • Gaelscoil Mhichíl Uí Choileáin · primary · 388 pupils · 1.4 km
    • Clonakilty Community College · postprimary · 696 pupils · 1.5 km
    • Sacred Heart Secondary School · postprimary · 568 pupils · 1.6 km
    • St Joseph'S Girls National School · primary · 192 pupils · 1.7 km
    • Scoil na mBuachailli · primary · 235 pupils · 1.8 km

    Stops 7

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 21 Oct 2026, 02:35
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic21 Oct 2026, 01:42open
      Council meetings (ModernGov)Public21 Oct 2026, 02:35open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Zoned G3 (high amenity), not for homes: could you extend?
        Ask for: A solicitor's or planner's view.
        Solicitor · planner
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Tawnies Upper
      Electoral division
      Clonakilty Rural
      Electoral area
      Skibbereen-West Cork
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • Zoned G3 (high amenity); no vacant land tax.
      • 4 sites nearby could change: 4 empty zoned plots.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 72% owner-occupied (council 73%); 10% of homes empty (council 13%); most built 2001–2010; 62% drive to work (council 66%); population up 14% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks).
      • 39 applications nearby in the last 12 months; 83% approved (council 92%); 18% for work already built (council 21%).
      • 1 building job started within 250 m in the last six months.
      • 3 homes started within 1 km in 3 years (council middle 1).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 25
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.021 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public21 Oct 2026
      www2.courts.ie—© the publisher21 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public21 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.021 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence21 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 22 Oct 2026, 00:53 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.