Planning report · Cork County Council · 500 m around the house · the last 12 months · 11 Oct 2026, 23:05
Bridewell Lane
51.67994, -9.45161
Homes here mostly date from before 1919. 8 planning files on this house, the latest from 2021. Home extensions nearby almost always get approved (96%). 2 applications nearby open for comments.
Protected or listed · a building in the national heritage inventory (20834056)
No
Vacant land tax · not on the map
A
Flood zone (development plan) · Zone A: highest risk
Zoning, protection, tax and flood: the detail
ZoningM2 · Major town centreWhat it says
Town Centre/Neighbourhood Centres: Promote the development of town centres and neighbourhood centres as the primary locations for retail and other uses that provide goods or services principally to visiting members of the public.
The main town centre — retail, offices, civic uses, apartments.
cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028
Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Bantry (412 m)
Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 m
Count
For example
Heritage inventory buildings
85
Bantry House; M. Evans
Monuments
5
Burial ground; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Nothing on this site restricts it: not protected, not in a conservation area.
Figure 2
What happened to applications like yours
A new house in a garden is harder: 82% approved.
0%50%100%
New house in a garden or site34 decided · more info asked 0%
82% · council 86%
Approved nearbyCork overall
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 34 nearby, 8,048 council-wide
Figure 3
Town Lots, file by file since 1998
58 of 63 decided extensions on the road were approved. New houses in side gardens or on sites: 15 of 20.
ApprovedRefusedWithdrawn or invalid
316 files with "Town Lots" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 1998–2026
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Permission isn't building. Of 84 permissions since 2016, 59 show a start notice and 20 have a completion certificate. Most owners opt out of sign-off.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured134 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
Figure 6
The next 30 days
2 deadlines within 500 m; the first closes 23 Oct 2026.
Comments close
Comments close 23 Oct 202612 days left
126/2442 · application received — a) Change existing use of first floor from storage and office to retail use, b) construct an…
€20 to the council · 48 m away
Comments close 28 Oct 202617 days left
226/2471 · application received — Permission for changes to development as permitted under planning reference no's 19/00606 and…
€20 to the council · 60 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Figure 7
Applications within 500 m, by year
Between 7 and 20 a year; busiest 2017. 90% of decisions were approvals.
ApprovedRefusedWithdrawn or invalidUndecided
2016 and 2026 are part years (*). Exemption requests and time extensions are left out.
Construct a new vehicular entrance off the public roadway to serve the existing dwelling along with all…
25/61871 Dec 2025285 m
How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: npad, acp, bcms · fetched 11 Oct 2026, 01:43
Carrignagat, Bantry, Cork · 24 Aug 2026 · start notice not signed off · 24/00699 · 492 m
18 Glengarriff Road, Bantry, Cork, P75 RK06 · 7 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 279 m
4Vickery’s Inn Complex, New Street, Bantry, Cork, P75 H489 · 4 May 2026 · 3 homes · 7-day notice not signed off · 46 m
3New Street and William Street, Bantry, Cork, P75 YK44 · 27 Apr 2026 · start notice not signed off · 24/00617 · 43 m
2 Marino Terrace, Bantry, Cork, P75 H289 · 30 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 25337 · 116 m
Glengarriff Road, Bantry, Cork, P75 P276 · 29 Dec 2025 · 7-day notice not signed off · 399 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
How busy is this area About as busy as most of Cork County Council.
Homes approved
Here0
Council middle0
Homes started
Here11
Council middle1
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)
CC BY 4.0
—
—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)
CC BY 4.0
—
—
EPA strategic noise maps
CC BY 4.0
—
—
Fingal County Council
CC BY 4.0
—
—
Question 6
What to ask, and who
Inside Flood Zone A on the council's development plan map: can you insure it?
Ask for: A home insurance quote before you bid, and any flood risk assessment in the site's planning file.
Insurer
Change of use (17/60) started May 2017, never signed off: is it finished?
Ask for: The completion certificate, or an engineer's opinion of compliance.
Seller · solicitor
Work already done (21/443): work kept with permission. Done as approved?
Ask for: The retention grant and an opinion of compliance.
Seller · solicitor
Extension (04/8198) approved 2005: built as approved?
Ask for: The grant and an opinion of compliance.
Seller · solicitor
Application 48 m away open for comments until 23 Oct 2026: comment?
Ask for: The plans on the council's website (€20 to comment).
Council
Any work done without planning permission?
Ask for: An opinion of compliance for the whole house.
Seller · solicitor
Reference
Where this is, the terms, the sources
Townland
Town Lots
Electoral division
Bantry Urban
Electoral area
Bantry-West Cork
Council
Cork County Council
Everything we found, as a list 8 lines
1 job on this site started but never signed off as finished.
Zoned M2 (major town centre); heritage-listed; no vacant land tax.
Inside Flood Zone A on the Cork County Development Plan 2022-2028 flood map.
Nothing nearby looks set to change.
2 applications open for comments nearby; nearest closes 23 Oct 2026.
Bantry (bus 229, 232) 178 m away: 2 an hour at morning peak.
Here (2022 census): 62% rent (council 22%); 36% of homes empty (council 13%); most built before 1919; 47% drive to work (council 66%); population up 4% since 2016.
Around here the council decides in a median 52 days (about 7 weeks).
What the terms mean 7 terms
Vacant land tax(Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
Building started(Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
Signed off as finished(Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
Approved(Grant of permission): The council said yes, usually with conditions.
Comment on an application(Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
Permission for work already done(Retention permission): An application to keep something that was built without permission.
What the land is zoned for(Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 28
Source
Publisher
Licence
Fetched
EPA strategic noise maps
—
CC BY 4.0
—
Fingal County Council
—
CC BY 4.0
—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)