PlanningRegister.ie
Planning report · Cork County Council · 500 m around the house · the last 12 months · 11 Oct 2026, 23:05

Bandon

51.73103, -8.76155

Homes here mostly date from the 1990s. 2 planning files on this house, the latest from 2011. 44 homes approved 154 m away haven't started.

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations. 2 planning files on this house, the latest from 2011.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KnocknagarraneBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2011: 11/5179 · porch, approved2011: 11/5018 · porch, withdrawn or invalid2003: 2 files on Knocknagarrane2004: 5 files on Knocknagarrane2005: 2 files on Knocknagarrane2006: 4 files on Knocknagarrane2007: 4 files on Knocknagarrane2008: 3 files on Knocknagarrane2010: 9 files on Knocknagarrane2011: 1 file on Knocknagarrane2012: 1 file on Knocknagarrane2013: 1 file on Knocknagarrane2014: 1 file on Knocknagarrane2016: 5 files on Knocknagarrane2017: 1 file on Knocknagarrane2018: 7 files on Knocknagarrane2019: 5 files on Knocknagarrane2020: 1 file on Knocknagarrane2021: 2 files on Knocknagarrane2022: 2 files on Knocknagarrane2023: 1 file on Knocknagarrane2024: 1 file on Knocknagarrane2025: 3 files on Knocknagarrane2026: 4 files on Knocknagarrane65 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2011
    11/5179 · porch · approved 2011 · built? unknown
    approvedstarted?signed off?
  2. 2011
    11/5018 · porch · withdrawn
    approved?started?signed off?
On this site
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings8worker's house; mill (water)
Monuments7Mill - corn; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, rzlt, constraints, constraints.niah, constraints.smr · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 10 Oct 2026, 23:46
SourceLicenceFetchedLink
bcmsCC-BY-4.010 Oct 2026, 23:46open
npadCC-BY-4.011 Oct 2026, 01:43open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 67% approved.

New house in a garden or site21 decided · more info asked 0%
67% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 21 nearby, 8,048 council-wide

Figure 3

Knocknagarrane, file by file since 2003

10 of 10 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 3.

65 planning files on Knocknagarrane since 2003, by kind and decision.200320052007200920112013201520172019202120232025Extensions, atticsNo number · 2003 · first-floor · undecided · 03/6665No number · 2006 · other extension · approved · 06/6353No number · 2007 · other extension · approved · 07/9049No number · 2010 · other extension · approved · 10/5235No. 8 · 2010 · first-floor · approved · 10/6246No number · 2010 · other extension · undecided · 10/8262No. 15 · 2010 · two-storey rear · approved · 10/8538No number · 2011 · porch / front · undecided · 11/5018No number · 2013 · side · approved · 13/6439No number · 2016 · two-storey rear · approved · 16/5915No number · 2016 · rear · undecided · 16/6378No number · 2016 · rear · undecided · 16/6551No number · 2016 · rear · undecided · 16/6640No number · 2016 · rear · approved · 16/7029No. 1 · 2018 · first-floor · approved · 18/4790No number · 2018 · other extension · undecided · 18/5101No number · 2018 · other extension · undecided · 18/5759No number · 2025 · single-storey rear · approved · 25/4760No number · 2026 · other extension · undecided · 26/1758No number · 2026 · other extension · undecided · 26/1998Porches, roofs, otherNo number · 2003 · other work · approved · 03/3800No number · 2004 · other work · undecided · 04/3928No number · 2004 · other work · approved · 04/4690No number · 2004 · other work · approved · 04/8226No number · 2004 · other work · undecided · 04/8345No number · 2004 · other work · refused · 04/8867No number · 2005 · other work · approved · 05/47No number · 2005 · other work · approved · 05/9790No number · 2006 · other work · approved · 06/10333No number · 2006 · other work · refused · 06/13462No number · 2006 · other work · undecided · 06/8184No number · 2007 · other work · approved · 07/12119No number · 2007 · other work · undecided · 07/7859No number · 2007 · other work · refused · 07/8985No number · 2008 · other work · refused · 08/7938No number · 2008 · other work · undecided · 08/9597No number · 2008 · other work · approved · 08/9810No number · 2010 · other work · approved · 10/4194No number · 2010 · other work · undecided · 10/4505No number · 2010 · other work · approved · 10/5065No number · 2010 · other work · approved · 10/5070No number · 2010 · other work · approved · 10/5996No number · 2014 · other work · approved · 14/6235No number · 2017 · other work · approved · 17/7383No number · 2018 · other work · approved · 18/4747No number · 2018 · other work · undecided · 18/4827No number · 2019 · other work · undecided · 19/4167No number · 2019 · other work · undecided · 19/4552No number · 2019 · other work · undecided · 19/6513No number · 2019 · other work · approved · 19/6715No number · 2019 · other work · undecided · 19/6731No number · 2020 · other work · approved · 20/4786No number · 2021 · other work · approved · 21/4027No number · 2022 · other work · refused · 22/5727No. 9 · 2022 · other work · approved · 22/5962No number · 2023 · other work · approved · 23/6403No number · 2024 · other work · approved · 24/4165No number · 2025 · other work · approved · 25/6346No number · 2025 · other work · approved · 25/6896New house in a side gardenNo number · 2012 · new house · approved · 12/5535No number · 2018 · new house · undecided · 18/4925No number · 2018 · new house · approved · 18/5300No number · 2021 · new house · approved · 21/5288No number · 2026 · new house · undecided · 26/2192No number · 2026 · new house · undecided · 26/2450
ApprovedRefusedWithdrawn or invalid

65 files with "Knocknagarrane" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2003–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 11 Oct 2026, 01:43
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Oct 2026, 01:43open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.010 Oct 2026, 23:46open
    npadCC-BY-4.011 Oct 2026, 01:43open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days.

    Comments open: 5 weeks · €20; Council decision: 55 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 50–92 (n=29)55 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated29 decided home extensions, 1 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Bandon with 4 numbered planning items
    ⌖ the houseApproved, not startedApprovedNo decision yet
    1. 1Knocknagarrane 25/6896Approved, no sign building has started · 154 m
    2. 2Knocknagarrane, Old Chapel 25/6346Approved with conditions · 226 m
    3. 3Bandon Rugby Club, Old Chapel 26/0129Approved with conditions · 371 m
    4. 4Clonakilty Road, Knocknagarrane 26/1998No decision yet · 410 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 19 permissions since 2016, 3 show a start notice and 1 has a completion certificate.

    35 applications lodged within 500 m. Council: 19 approved, 1 refused. After appeals: 19 approved. Of those: 1 signed off, 1 built with the owner's opt-out, 1 started, 16 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT19: lodged → approved1: lodged → refused15: lodged → undecided19: approved → approved1: refused → refused15: undecided → undecided16: approved → no start notice found1: approved → built, owner opted out1: approved → started, not signed off1: approved → signed off35 lodged35 lodged19 approved19 approved1 refused1 refused15 undecided15 undecided19 approved19 approved1 refused1 refused15 undecided15 undecided16 no start notice found16 no start notice found1 built, owner opted out1 built, owner opted out1 started, not signed off1 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured35 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      44 homes 154 m away were approved Aug 2026 with no start notice yet; the permission runs to Aug 2031.

      Knocknagarrane · 44 homes: 44 homes approved Aug 2026, not started202420252026202720282029203020312032Knocknagarrane · 44 homes154 m · 25/689644 homes approved Aug 2026, not started44 homes approved Aug 2026, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 1 within 500 m

      Approved, not started 1

      Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

      Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.010 Oct 2026, 23:46open
      derelictCC-BY-4.05 Oct 2026, 09:35open
      npadCC-BY-4.011 Oct 2026, 01:43open
      Figure 8

      Applications within 500 m, by year

      Between 1 and 7 a year; busiest 2018. 95% of decisions were approvals.

      2016: 3, 2017: 1, 2018: 7, 2019: 4, 2020: 2, 2021: 3, 2022: 4, 2023: 1, 2024: 1, 2025: 6, 2026: 305102016: 1 approved2016: 2 undecided3’16*2017: 1 approved1’172018: 3 approved2018: 4 undecided7’182019: 4 undecided4’192020: 2 approved2’202021: 3 approved3’212022: 2 approved2022: 1 refused2022: 1 undecided4’222023: 1 approved1’232024: 1 approved1’242025: 4 approved2025: 2 undecided6’252026: 1 approved2026: 2 undecided3’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: npad, acp, bcms · fetched 11 Oct 2026, 01:43
      SourceLicenceFetchedLink
      npadCC-BY-4.011 Oct 2026, 01:43open
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.010 Oct 2026, 23:46open
      Building work nearby 2 in the last 12 months
      2 not signed off
      • Riverchapel, Old Chapel, Bandon, Cork · 14 Oct 2026 · 27 homes · start notice not signed off · 256346 · 265 m
      • Riverchapel, Oldchapel,, Bandon, Cork · 27 Jan 2026 · 25 homes · start notice not signed off · 236403 · 299 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: bcms · fetched 10 Oct 2026, 23:46
      SourceLicenceFetchedLink
      bcmsCC-BY-4.010 Oct 2026, 23:46open
      Homes coming 44 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.010 Oct 2026, 23:46open
      npadCC-BY-4.011 Oct 2026, 01:43open
      social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools
      How busy is this area Busier than most of Cork County Council.
      Homes approved
      Here79
      Council middle0
      Homes started
      Here50
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.010 Oct 2026, 23:46open
      npadCC-BY-4.011 Oct 2026, 01:43open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      17% of homes built before 1971 (council 28%). 88% owner-occupied (council 73%).

      Homes built before 1971
      17% · council 28%
      Homes built since 2001
      30% · council 36%
      Owner-occupied
      88% · council 73%
      Rented
      10% · council 22%
      Children under 15
      19% · council 21%
      Aged 65 and over
      17% · council 16%
      Households with 2+ cars
      61% · council 52%
      Work mainly from home
      14% · council 12%
      This small area (287 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047033003

      Bus
      542 m
      Old Chapel · 239
      Nearest school
      723 m
      Scoil Bhride, 187 pupils
      Schools, stops and the council

      Schools

      • Scoil Bhride · primary · 187 pupils · 723 m
      • Bandon Grammar School · postprimary · 712 pupils · 887 m

      Stops 4

      • Old Chapel · 239 · 0/hour at peak · 542 m
      • Old Chapel · 239 · 705 m
      • Old Chapel · 230 · 1/hour at peak · 757 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Scoil Bhride · 723 m-1.6% pupils (187)
      • Bandon Grammar School · 887 m-0.7% pupils (712)
      Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
      SourceLicenceFetchedLink
      gtfsCC-BY-4.04 Oct 2026, 23:41open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      npadCC-BY-4.011 Oct 2026, 01:43open
      consultpublic11 Oct 2026, 01:25open
      moderngovpublic11 Oct 2026, 01:26open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Porch (11/5179) approved 2011: built as approved?
        Ask for: The grant and an opinion of compliance.
        Seller · solicitor
      2. 44 homes approved 154 m away (Knocknagarrane), not started: what is planned?
        Ask for: The planning file for 25/6896.
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Knocknagarrane
      Electoral division
      Ballymodan
      Electoral area
      Bandon - Kinsale
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 11/5179, approved 2011, built? unknown.
      • No vacant land tax.
      • 1 site nearby could change: 1 approved scheme.
      • 44 homes approved nearby, not started; largest 44 at Knocknagarrane.
      • No morning-peak service within 500 m; nearest is Old Chapel, 542 m away (2 a day).
      • Here (2022 census): 88% owner-occupied (council 73%); 10% of homes empty (council 13%); most built 1991–2000; 74% drive to work (council 66%); population up 4% since 2016.
      • The council decides in a median 66 days (about 9 weeks).
      • Homes started within 1 km: 30 in the last year, 1 three years before.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 25
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.010 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public11 Oct 2026
      www2.courts.ie—all-rights-reserved11 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
      transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public11 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.011 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…11 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 11 Oct 2026, 23:05 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.