Planning report · Cork County Council · 500 m around the house · the last 12 months · 29 Oct 2026, 13:55

Kilmoney Road, Carrigaline

51.80452, -8.40504

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (100%). 362 homes approved 460 m away haven't started.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KilmoneyBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 8 files on Kilmoney2022: 3 files on Kilmoney2023: 7 files on Kilmoney2024: 9 files on Kilmoney2025: 8 files on Kilmoney2026: 4 files on Kilmoney39 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R3
Zoning · Rural cluster
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR3 · Rural cluster
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

A small rural settlement where only modest infill serving local need is envisaged.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Kilmoney House
Monuments5Ringfort - rath; Souterrain
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 94% approved.

New house in a garden or site16 decided · more info asked 0%
94% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 16 nearby, 4,502 council-wide

Figure 3

Kilmoney, file by file since 2021

14 of 14 decided extensions on the road were approved. New houses in side gardens or on sites: 2 of 2.

39 planning files on Kilmoney since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 4 · 2021 · first-floor · approved · 21/4399No number · 2021 · attic conversion / dormer · undecided · 21/5494No number · 2021 · attic conversion / dormer · approved · 21/5752No. 15 · 2021 · single-storey side · approved · 21/6951No number · 2022 · attic conversion / dormer · undecided · 22/4556No number · 2022 · attic conversion / dormer · approved · 22/4990No. 61 · 2023 · single-storey rear · approved · 23/4176No. 18 · 2023 · attic conversion / dormer · undecided · 23/4359No. 18 · 2023 · attic conversion / dormer · approved · 23/4591No. 42 · 2023 · attic conversion / dormer · approved · 23/4674No. 26 · 2023 · two-storey rear · approved · 23/5540No. 26 · 2024 · single-storey side · approved · 24/4121No. 1 · 2024 · attic conversion / dormer · approved · 24/5140No. 4 · 2024 · other extension · approved · 24/5340No. 18 · 2024 · two-storey side · approved · 24/5759No number · 2025 · two-storey side · undecided · 25/4120No number · 2025 · two-storey side · approved · 25/4486No. 5 · 2025 · other extension · approved · 25/5341Porches, roofs, otherNo. 25 · 2021 · other work · undecided · 21/5318No. 25 · 2021 · other work · approved · 21/5611No number · 2021 · other work · approved · 21/6709No number · 2022 · other work · approved · 22/4693No. 48 · 2023 · other work · approved · 23/4710No. 24 · 2023 · other work · approved · 23/6260No number · 2024 · other work · undecided · 24/4433No number · 2024 · other work · approved · 24/6418No number · 2025 · other work · undecided · 25/4138No number · 2025 · other work · undecided · 25/4296No number · 2025 · other work · approved · 25/4551No number · 2025 · other work · undecided · 25/4692No number · 2025 · other work · approved · 25/4898No number · 2026 · other work · undecided · 26/1233No number · 2026 · other work · undecided · 26/1849No number · 2026 · other work · undecided · 26/1938No number · 2026 · other work · undecided · 26/2716New house in a side gardenNo number · 2021 · new house · approved · 21/4126No number · 2024 · new house · undecided · 24/5097No number · 2024 · new house · approved · 24/5267No number · 2024 · new house · undecided · 24/6527
ApprovedRefusedWithdrawn or invalid

39 files with "Kilmoney" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 48–68 (n=38)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated38 decided home extensions, 2 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Appeals nearby 1 in the last 12 months
    • 323879 Granted with conditions · Kilmoney Road, Lisclearly, Carrigaline, Co. Cork. · 107 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher28 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 4

    What's changing around you?

    Street map around Kilmoney Road, Carrigaline with 10 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedBuilding site that stoppedAppealEmpty land zoned for homesNo decision yet
    1. 1Kilmoney, Carrigaline 26/2716No decision yet · 363 m
    2. 2Kilmoney Carrigaline Co Cork 24/6418Approved, no sign building has started · 419 m
    3. 3Gort Na Glaise, Kilmoney ABP-306804-20 [19/6901]Building site that stopped · 444 m
    4. 4Mountain Road Kilmoney Carrigaline Co Cork 25/4551Approved, no sign building has started · 460 m
    5. 5Kilmoney Road, Lisclearly 323879Appeal: approved with conditions · 107 m
    6. 65.9 ha zoned for homesEmpty land zoned for homes · 178 m
    7. 70.7 ha zoned for homesEmpty land zoned for homes · 224 m
    8. 82.2 ha zoned for homesEmpty land zoned for homes · 378 m
    9. 9Upper Kilmoney Road, Kilmoney 26/1938No decision yet · 220 m
    10. 10Kilmoney (Townland), Carrigaline 26/1849No decision yet · 439 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 21 permissions since 2016, 2 show a start notice and 1 has a completion certificate.

    35 applications lodged within 500 m. Council: 21 approved, 0 refused. After appeals: 21 approved. Of those: 1 signed off, 1 built with the owner's opt-out, 0 started, 19 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT21: lodged → approved14: lodged → undecided21: approved → approved14: undecided → undecided19: approved → no start notice found1: approved → built, owner opted out1: approved → signed off35 lodged35 lodged21 approved21 approved14 undecided14 undecided21 approved21 approved14 undecided14 undecided19 no start notice found19 no start notice found1 built, owner opted out1 built, owner opted out1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured35 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 25 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-25 26/2716: application received — Alterations to the residential development permitted by Cork County Council Planning Reference 24/6418. The proposed alttoday3 Nov8 Nov13 Nov18 Nov23 Nov28 Nov26/2716: application received — Alterations to the residential development permitted by Cork County Council Planning Reference 24/6418. The proposed alt · 363 m away · 2026-11-25
    Comments close
    • Comments close 25 Nov 202627 days left
      126/2716 · application received — Alterations to the residential development permitted by Cork County Council Planning Reference…
      €20 to the council · 363 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    362 homes 460 m away were approved May 2025 with no start notice yet; the permission runs to May 2030. 1 building site nearby stopped before sign-off.

    Mountain Road Kilmoney… · 362 homes: 362 homes approved May 2025, not started; Gort Na Glaise, Kilmoney · 58 homes: 58 homes, started Apr 2021, never signed off; Kilmoney Carrigaline Co… · 39 homes: 39 homes approved Jan 2026, not started20212022202320242025202620272028202920302031Mountain Road Kilmoney… · 362 homes460 m · 25/4551362 homes approved May 2025, not started362 homes approved May 2025, not startedGort Na Glaise, Kilmoney · 58 homes444 m · ABP-306804-20 [19/6901]58 homes, started Apr 2021, never signed off58 homes, started Apr 2021, never signed offKilmoney Carrigaline Co… · 39 homes419 m · 24/641839 homes approved Jan 2026, not started39 homes approved Jan 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 6 within 500 m

    Building site that stopped 1

    • 3Gort Na Glaise, Kilmoney · 58 homes, started Apr 2021, never signed off · 444 m

    Approved, not started 2

    Empty land zoned for homes 3

    • 65.9 ha zoned for homes · no homes built on it yet · 178 m
    • 70.7 ha zoned for homes · no homes built on it yet · 224 m
    • 82.2 ha zoned for homes · no homes built on it yet · 378 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 3 and 9 a year; busiest 2025. 100% of decisions were approvals.

    2021: 6, 2022: 3, 2023: 5, 2024: 8, 2025: 9, 2026: 405102021: 5 approved2021: 1 undecided6’21*2022: 2 approved2022: 1 undecided3’222023: 4 approved2023: 1 undecided5’232024: 5 approved2024: 3 undecided8’242025: 5 approved2025: 4 undecided9’252026: 4 undecided4’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 4 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Building work nearby 1 in the last 12 months
    1 not signed off
    • Fern Park, Castle Heights, Carrigaline, Cork · 2 Dec 2025 · 4 homes · start notice not signed off · 25/4528 · 203 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 29 Oct 2026, 02:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Homes coming 401 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Tots & Co Preschool · Crèche2 Jul 2025 · report · Tusla Early Years Inspectorate846 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Cork County Council.
    Homes approved
    Here401
    Council middle0
    Homes started
    Here29
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    3% of homes built before 1971 (council 28%). 94% owner-occupied (council 73%).

    Homes built before 1971
    3% · council 28%
    Homes built since 2001
    83% · council 36%
    Owner-occupied
    94% · council 73%
    Rented
    2% · council 22%
    Children under 15
    25% · council 21%
    Aged 65 and over
    3% · council 16%
    Households with 2+ cars
    88% · council 52%
    Work mainly from home
    17% · council 12%
    This small area (371 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047239015/02

    Road noise
    45–49 dB
    day–night average (EPA 2022)
    Bus
    233 m
    Upper Clevedon · 220 · busiest stop within 500 m: 4 an hour at peak
    Schools, stops and the council

    Schools

    None nearby.

      Stops 11

      • Upper Clevedon · 220 · 3/hour at peak · 233 m
      • Upper Clevedon · 220 · 4/hour at peak · 247 m
      • Clevedon Gardens · 220 · 3/hour at peak · 456 m
      • Clevedon Gardens · 220 · 4/hour at peak · 470 m
      • Woodgrove · 220 · 4/hour at peak · 500 m
      • Woodgrove · 220 · 3/hour at peak · 539 m
      • Liosbourne · 220 · 4/hour at peak · 685 m
      • Lower Clevedon · 220 · 3/hour at peak · 696 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 29 Oct 2026, 02:14
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Council consultation portalsPublic29 Oct 2026, 01:01open
      Council meetings (ModernGov)Public29 Oct 2026, 02:14open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Application 363 m away open for comments until 25 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kilmoney
      Electoral division
      Liscleary
      Electoral area
      Carrigaline
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • Zoned R3 (rural cluster); no vacant land tax.
      • 6 sites nearby could change: 1 stalled build, 2 approved schemes, 3 empty zoned plots.
      • 1 application open for comments nearby; nearest closes 25 Nov 2026.
      • 401 homes approved nearby, not started; largest 362 at Mountain Road Kilmoney Carrigaline Co….
      • Upper Clevedon (bus 220) 247 m away: 4 an hour at morning peak; 15 from all stops within 500 m.
      • Noise from road traffic mapped at 45–49 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 94% owner-occupied (council 73%); 3% of homes empty (council 13%); most built 2001–2010; 77% drive to work (council 66%); population up 10% since 2016.
      • The council decides in a median 66 days (about 9 weeks).
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.029 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public29 Oct 2026
      www2.courts.ie—© the publisher28 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public29 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.029 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence29 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 29 Oct 2026, 13:55 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.