PlanningRegister.ie
Planning report · Cork County Council · 2000 m around the house · the last 12 months · 27 Oct 2026, 20:29

Waterfall Road

51.82034, -8.59402

Homes here mostly date from the 2000s.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings1Corran House
Monuments45Ringfort - rath; Souterrain
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 71% approved.

New house in a garden or site14 decided · more info asked 0%
71% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 14 nearby, 4,502 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 3

    How long, and what if someone objects?

    Question 4

    What's changing around you?

    Street map around Waterfall Road with 5 numbered planning items
    ⌖ the houseNo decision yetApproved
    1. 1Corran, Waterfall 26/2089No decision yet · 618 m
    2. 2Corran, Waterfall 26/1667Approved with conditions · 630 m
    3. 3Ballyleigh House, Ballyleigh 26/0613Approved with conditions · 1.4 km
    4. 4Ballyhooleen, Ballinhassig 26/2099No decision yet · 1.5 km
    5. 5Elmhaven, Coolatooder 26/1851Approved with conditions · 1.5 km
    Figure 3

    The next 30 days

    Nothing closes within 2.0 km in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Every application within 2.0 km 10 in the last 12 months

      See every application on the map

      • 1Corran, Waterfall, Co. Cork No decision yet
        Full planning permission for the construction of a new dwelling house, new entrance, domestic garage,…
        26/20897 Aug 2026618 m
      • 4Ballyhooleen,, Ballinhassig,, Co. Cork No decision yet
        Demolish existing agricultural buildings on the farm, construct a new agricultural building to replace the…
        26/20997 Aug 20261.5 km
      • 5Elmhaven, Coolatooder, Ballinhassig, Co. Cork. T12 RDH0 Approved with conditions
        Permission for the following works to existing 2 storey detached dwelling house:- 1) Construct new single…
        26/18513 Sept 20261.5 km
      • 2Corran, Waterfall, Co. Cork. Approved with conditions
        Permission for construction of a dwellinghouse, domestic garage, wastewater treatment plant and all…
        26/166717 Aug 2026630 m
      • Ballyhooleen,, Ballinhassig,, Co. Cork Withdrawn or not valid
        Permission to demolish existing agricultural buildings on the farm, construct a new agricultural building to…
        26/14955 Jun 20261.5 km
      • Corran, Waterfall, Co. Cork Withdrawn or not valid
        Construction of new dwellinghouse, domestic garage, wastewater treatment plant and all associated site works
        26/143929 May 2026629 m
      • Corran, Waterfall, Co. Cork Withdrawn or not valid
        Construction of new dwellinghouse, domestic garage, wastewater treatment plant and all associated site works.
        26/12007 May 2026630 m
      • 3Ballyleigh House, Ballyleigh, Waterfall, Co. Cork, T12E761 Approved with conditions
        Construction of an agricultural livestock shed to include cubicles, feeding area and underground slatted…
        26/06136 May 20261.4 km
      • Corran, Waterfall, Co. Cork Refused
        Permission for the construction of a dwellinghouse, domestic garage, wastewater treatment plant and all…
        25/697624 Feb 2026630 m
      • Corran, Waterfall, Co. Cork, Withdrawn or not valid
        Permission for the construction of a dwellinghouse, domestic garage, wastewater treatment plant and all…
        25/629828 Oct 2025630 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      Building work nearby 4 in the last 12 months
      4 no sign-off needed
      • Ballyleigh, Waterfall, Cork · 19 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 25/5183 · 1.2 km
      • Corran, Waterfall, Cork · 19 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 25/5297 · 1.1 km
      • Corran, Waterfall, Cork · 19 Jun 2026 · short notice no sign-off needed · 25/5297 · 1.1 km
      • Glenvale, Coolatooder, Ballinhassig, Cork · 15 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 255705 · 1.1 km
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      0
      How busy is this area About as busy as most of Cork County Council.
      Homes approved
      Here0
      Council middle0
      Homes started
      Here0
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      Question 5

      What's the area like?

      Figure 4

      This street block against the council

      9% of homes built before 1971 (council 28%). 88% owner-occupied (council 73%).

      Homes built before 1971
      9% · council 28%
      Homes built since 2001
      44% · council 36%
      Owner-occupied
      88% · council 73%
      Rented
      9% · council 22%
      Children under 15
      23% · council 21%
      Aged 65 and over
      13% · council 16%
      Households with 2+ cars
      77% · council 52%
      Work mainly from home
      15% · council 12%
      This small area (337 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047142002

      Nearest school
      1.1 km
      Gogginshill NS, 227 pupils
      Schools, stops and the council

      Schools

      • Gogginshill NS · primary · 227 pupils · 1.1 km

      Stops 1

        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 27 Oct 2026, 01:57
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Sept 2026, 23:32open
        Council consultation portalsPublic27 Oct 2026, 00:57open
        Council meetings (ModernGov)Public27 Oct 2026, 01:57open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Corran
        Electoral division
        Dunderrow
        Electoral area
        Carrigaline
        Council
        Cork County Council
        Everything we found, as a list 7 lines
        • No vacant land tax.
        • Nothing nearby looks set to change.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 88% owner-occupied (council 73%); 2% of homes empty (council 13%); most built 2001–2010; 70% drive to work (council 66%); population up 5% since 2016.
        • The council decides in a median 66 days (about 9 weeks).
        • 10 applications nearby in the last 12 months.
        • 0 homes started within 1 km in 3 years (council middle 1).
        What the terms mean 5 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 25
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.027 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public27 Oct 2026
        www2.courts.ie—© the publisher26 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public27 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.027 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence27 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Sept 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 27 Oct 2026, 20:29 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.