Planning report · Cork County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 08:57

L3651

51.83676, -8.20863

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2025. 14 homes approved 107 m away haven't started.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of AghadaBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2026: 25/5958 · new house, approved2021: 4 files on Aghada2022: 7 files on Aghada2023: 4 files on Aghada2024: 7 files on Aghada2025: 8 files on Aghada2026: 4 files on Aghada34 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    25/5958 · new house · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · inside the zone around a recorded monument (CO088-119----)
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Heritage inventory3 within 100 m J. Walsh; post box
Monument zoneOn this site Church, Aghada

Not on this site: protected building, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings5Presbyterian Church Upper Aghada; J. Walsh
Monuments9Graveyard; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Sites and Monuments Record, SMR zones of notification, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 83% approved.

New house in a garden or site18 decided · more info asked 0%
83% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 18 nearby, 4,519 council-wide

Figure 3

Aghada, file by file since 2021

6 of 6 decided extensions on the road were approved. New houses in side gardens or on sites: 6 of 6.

34 planning files on Aghada since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 6 · 2021 · single-storey side · approved · 21/4103No number · 2022 · first-floor · undecided · 22/4215No number · 2022 · side · approved · 22/4328No. 4 · 2022 · attic conversion / dormer · approved · 22/5232No number · 2023 · attic conversion / dormer · undecided · 23/6107No number · 2023 · attic conversion / dormer · undecided · 23/6331No number · 2024 · attic conversion / dormer · undecided · 24/4405No number · 2024 · attic conversion / dormer · approved · 24/4575No number · 2026 · rear · approved · 26/0912No number · 2026 · two-storey rear · approved · 26/0995Porches, roofs, otherNo number · 2021 · other work · undecided · 21/6731No number · 2021 · other work · approved · 21/6873No number · 2022 · other work · approved · 22/4225No number · 2022 · other work · undecided · 22/6352No number · 2022 · other work · approved · 22/6541No number · 2023 · other work · approved · 23/5772No number · 2024 · other work · approved · 24/5099No number · 2024 · other work · approved · 24/6258No number · 2024 · other work · undecided · 24/6409No number · 2025 · other work · approved · 25/4208No number · 2025 · other work · approved · 25/4932No number · 2025 · other work · approved · 25/5958No number · 2025 · other work · approved · 25/6466No number · 2025 · other work · undecided · 25/6649No number · 2026 · other work · approved · 26/0412No number · 2026 · other work · undecided · 26/1799New house in a side gardenNo number · 2021 · new house · approved · 21/6927No number · 2022 · new house · approved · 22/4238No. 5A · 2023 · new house · approved · 23/57275ANo number · 2024 · new house · undecided · 24/6006No number · 2024 · new house · undecided · 24/6193No number · 2025 · new house · approved · 25/4003No number · 2025 · new house · approved · 25/4170No number · 2025 · new house · approved · 25/5959
ApprovedRefusedWithdrawn or invalid

34 files with "Aghada" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
Rear11—
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days.

    Comments open: 5 weeks · €20; Council decision: 54 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 53–92 (n=11)54 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated11 decided home extensions, 3 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Appeals nearby 3 in the last 12 months
    • 501897 Invalid · Curragh Glen, Aghada, Co. Cork · 65 m
    • 500744 Refused · Upper Aghada, Midleton, Co. Cork. · 0 m
    • 500741 Refused · Upper Aghada, Midleton, Co. Cork. · 0 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around L3651 with 5 numbered planning items
    ⌖ the houseApproved, not startedApprovedNo decision yet
    1. 1Curragh Glen 26/0412Approved, no sign building has started · 107 m
    2. 2Aghada, Upper Aghada 26/0912Approved with conditions · 118 m
    3. 3Aghada, Midleton 26/0995Approved with conditions · 139 m
    4. 4Townland of Aghada, along the Local Road L3658-0 at Hillside 26/1799No decision yet · 187 m
    5. 5Church Road, Upper Aghada 25/6466Approved with conditions · 451 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 20 permissions since 2016, 3 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    26 applications lodged within 500 m. Council: 20 approved, 0 refused. After appeals: 20 approved. Of those: 0 signed off, 2 built with the owner's opt-out, 1 started, 17 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT20: lodged → approved6: lodged → undecided20: approved → approved6: undecided → undecided17: approved → no start notice found2: approved → built, owner opted out1: approved → started, not signed off26 lodged26 lodged20 approved20 approved6 undecided6 undecided20 approved20 approved6 undecided6 undecided17 no start notice found17 no start notice found2 built, owner opted out2 built, owner opted out1 started, not signed off1 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured26 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      14 homes 107 m away were approved Sept 2026 with no start notice yet; the permission runs to Sept 2031.

      Curragh Glen · 14 homes: 14 homes approved Sep 2026, not started202420252026202720282029203020312032Curragh Glen · 14 homes107 m · 26/041214 homes approved Sep 2026, not started14 homes approved Sep 2026, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 1 within 500 m

      Approved, not started 1

      • Curragh Glen · 14 homes approved Sep 2026, not started · 107 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
      Figure 8

      Applications within 500 m, by year

      Between 1 and 7 a year; busiest 2022. 100% of decisions were approvals.

      2021: 4, 2022: 7, 2023: 1, 2024: 4, 2025: 6, 2026: 405102021: 3 approved2021: 1 undecided4’21*2022: 5 approved2022: 2 undecided7’222023: 1 approved1’232024: 3 approved2024: 1 undecided4’242025: 5 approved2025: 1 undecided6’252026: 3 approved2026: 1 undecided4’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 6 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Building work nearby 2 in the last 12 months
      1 not signed off1 no sign-off needed
      • Church Road, Upper Aghada, Cork · 28 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 25/6466 · 467 m
      • 1 Doctor Patrick O'Sullivan Terrace, Upper Aghada, Cork · 17 Aug 2026 · 4 homes · start notice not signed off · PART 8 · 261 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      Homes coming 14 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Aghada Community Playgroup CLG · Crèche3 Dec 2025 · report · Tusla Early Years Inspectorate155 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register4 Nov 2026, 23:36open
      How busy is this area Busier than most of Cork County Council.
      Homes approved
      Here14
      Council middle0
      Homes started
      Here29
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      84% owner-occupied (council 73%).

      Homes built before 1971
      27% · council 28%
      Homes built since 2001
      45% · council 36%
      Owner-occupied
      84% · council 73%
      Rented
      9% · council 22%
      Children under 15
      18% · council 21%
      Aged 65 and over
      16% · council 16%
      Households with 2+ cars
      61% · council 52%
      Work mainly from home
      13% · council 12%
      This small area (154 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047115009

      Bus
      52 m
      Upr Aghada · 241 · busiest stop within 500 m: 1 an hour at peak
      Nearest school
      160 m
      S N Ath Fhada, 304 pupils
      Schools, stops and the council

      Schools

      • S N Ath Fhada · primary · 304 pupils · 160 m

      Stops 4

      • Upr Aghada · 241 · 52 m
      • Upr Aghada · 241 · 1/hour at peak · 95 m
      • Lwr Aghada · 241 · 1/hour at peak · 762 m
      • Lwr Aghada · 241 · 0/hour at peak · 764 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • S N Ath Fhada · 160 m-7.6% pupils (304)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
      Council consultation portalsPublic5 Nov 2026, 01:15open
      Council meetings (ModernGov)Public5 Nov 2026, 02:33open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. New house (25/5958) approved 2026, not started: still planned?
        Ask for: The grant, and whether it stays with the house.
        Seller · solicitor
      2. Next to a recorded monument: does digging need notice?
        Ask for: Details of past works from the seller.
        Seller · council
      3. 14 homes approved 107 m away (Curragh Glen), not started: what is planned?
        Ask for: The planning file for 26/0412.
        Council
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Aghada
      Electoral division
      Corkbeg
      Electoral area
      Midleton
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 25/5958, approved 2026, not started, runs out 2031.
      • Zoned R2 (existing residential); monument zone; no vacant land tax.
      • 1 site nearby could change: 1 approved scheme.
      • 14 homes approved nearby, not started; largest 14 at Curragh Glen.
      • Upr Aghada (bus 241) 95 m away: 3 a day, fewer than one an hour at morning peak.
      • Here (2022 census): 84% owner-occupied (council 73%); 8% of homes empty (council 13%); most built 2001–2010; 63% drive to work (council 66%); population up 8% since 2016.
      • 2 home extensions within 250 m since 2026.
      • Around here the council decides in a median 59 days (about 8 weeks).
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
      www2.courts.ie—© the publisher4 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 5 Nov 2026, 08:57 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.