steps can overlap · medians for home extensions within 1.5 km, 10 years
1ApplySite notice up, plans online
2Comments5 weeks, €20. Comment to keep your right to appeal
3Decision8 weeks by law. Here 56 days
4Appeal window4 weeks after the decision
5AppealAt An Coimisiún Pleanála
6PermissionLasts 5 years
7StartStart notice to the council
8Sign-offCompletion cert, or the owner opts out
Question 1
What's the planning story of this house?
Figure 1
When it was built, and the rules since
Most homes here were built 1971–80, after planning permission began and before building regulations (1992). 2 planning files on this house, the latest from 2022.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
No zoning in the plans we hold.
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 m
Count
For example
Monuments
1
R109086
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Nothing on this site restricts it: not protected, not in a conservation area.
Figure 2
What happened to applications like yours
A new house in a garden is harder: 79% approved.
0%50%100%
New house in a garden or site34 decided · more info asked 0%
79% · council 86%
Approved nearbyCork overall
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 34 nearby, 8,048 council-wide
Figure 3
Rathard, file by file since 2006
6 of 7 decided extensions on the road were approved. New houses in side gardens or on sites: 13 of 16.
ApprovedRefusedWithdrawn or invalid
45 files with "Rathard" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2006–2026
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated13 decided home extensions, 0 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
Question 4
What's changing around you?
Figure 5
What happens to applications within 500 m
Permission isn't building. Of 15 permissions since 2016, 3 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured23 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
Figure 6
The next 30 days
Nothing closes within 500 m in the next 30 days.
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Figure 7
Applications within 500 m, by year
Between 1 and 8 a year; busiest 2022. 83% of decisions were approvals.
ApprovedRefusedWithdrawn or invalidUndecided
2017 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 0 in the last 12 months
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: npad, acp, bcms · fetched 14 Oct 2026, 02:03
Lyras, Rathard, Cork, P31N627 · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/04734 · 300 m
Lyras, Rathard, Cork · 1 Apr 2026 · short notice no sign-off needed · 25/04734 · 333 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
How busy is this area Busier than most of Cork County Council.
Homes approved
Here0
Council middle0
Homes started
Here18
Council middle1
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047183001
Nearest school
670 m
S N Cill Bonain, 97 pupils
Schools, stops and the council
Schools
S N Cill Bonain · primary · 97 pupils · 670 m
Stops 2
Schools growing or shrinking planning in 3 years · pupils last year
S N Cill Bonain · 670 m+3.2% pupils (97)
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)
CC BY 4.0
—
—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)
CC BY 4.0
—
—
EPA strategic noise maps
CC BY 4.0
—
—
Fingal County Council
CC BY 4.0
—
—
Question 6
What to ask, and who
New house (22/4562) refused 2022: built anyway?
Ask for: The seller's answer and your surveyor's check.
Seller · solicitor
Any work done without planning permission?
Ask for: An opinion of compliance for the whole house.
Seller · solicitor
Reference
Where this is, the terms, the sources
Townland
Rathard
Electoral division
Kilbonane
Electoral area
Macroom
Council
Cork County Council
Everything we found, as a list 7 lines
2 applications on this site; latest 22/4562, refused 2022.
No vacant land tax.
Nothing nearby looks set to change.
No scheduled public transport within 800 m.
Here (2022 census): 90% owner-occupied (council 73%); 4% of homes empty (council 13%); most built 1971–1980; 70% drive to work (council 66%); population up 6% since 2016.
The council decides in a median 66 days (about 9 weeks).
18 homes started within 1 km in 3 years (council middle 1).
What the terms mean 5 terms
Vacant land tax(Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
Building started(Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
Signed off as finished(Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
Approved(Grant of permission): The council said yes, usually with conditions.
What the land is zoned for(Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 25
Source
Publisher
Licence
Fetched
EPA strategic noise maps
—
CC BY 4.0
—
Fingal County Council
—
CC BY 4.0
—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)