PlanningRegister.ie
Planning report · Cork County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 09:03

Cobh Rural ED, Municipal District of Cobh, County Cork, Munster, Éire / Ireland

51.85599, -8.27671

Homes here mostly date from the 1960s. Home extensions nearby almost always get approved (96%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1961–70, around when planning permission began (1964).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1961–1970.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of CarrignafoyBuilt: most homes in this small area date from 1961–1970 (census estimate)most built2021: 16 files on Carrignafoy2022: 3 files on Carrignafoy2023: 8 files on Carrignafoy2024: 12 files on Carrignafoy2025: 16 files on Carrignafoy2026: 9 files on Carrignafoy64 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R3
Zoning · Rural cluster
No
Vacant land tax · lived-in homes don't pay it
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR3 · Rural cluster
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

A small rural settlement where only modest infill serving local need is envisaged.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Heritage inventory1 within 100 m Mount Eaton

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings17The Elms; Briar Home
Monuments7Ringfort - rath; Ritual site - holy well
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 81% approved.

Single-storey rear15 decided · more info asked 0%
100% · council 100%
New house in a garden or site16 decided · more info asked 0%
81% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 31 nearby, 5,053 council-wide

Figure 3

Carrignafoy, file by file since 2021

25 of 25 decided extensions on the road were approved. New houses in side gardens or on sites: 5 of 7.

64 planning files on Carrignafoy since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 62 · 2021 · two-storey rear · undecided · 21/4069No. 62 · 2021 · two-storey rear · approved · 21/4368No. 31 · 2021 · single-storey rear · approved · 21/4509No. 20 · 2021 · other extension · approved · 21/4685No. 14 · 2021 · two-storey side · undecided · 21/4713No. 15 · 2021 · single-storey rear · undecided · 21/4963No. 5 · 2021 · single-storey side · undecided · 21/5024No. 6 · 2021 · attic conversion / dormer · approved · 21/5370No number · 2021 · two-storey side · approved · 21/5599No. 5 · 2021 · single-storey side · approved · 21/6288No. 2 · 2021 · porch / front · undecided · 21/6527No number · 2021 · garage conversion · undecided · 21/6671No. 2 · 2021 · porch / front · approved · 21/6752No number · 2021 · garage conversion · approved · 21/6804No number · 2022 · porch / front · approved · 22/5373No. 82 · 2022 · single-storey rear · approved · 22/5770No. 22 · 2023 · other extension · approved · 23/6063No. 42 · 2023 · single-storey rear · approved · 23/6149No number · 2024 · two-storey rear · undecided · 24/4867No. 36 · 2024 · single-storey side · approved · 24/4875No number · 2024 · two-storey rear · approved · 24/5425No. 15 · 2024 · single-storey rear · approved · 24/5885No. 13 · 2024 · single-storey side · undecided · 24/6197No. 22 · 2024 · two-storey side · approved · 24/6299No. 13 · 2024 · single-storey side · undecided · 24/6431No number · 2025 · first-floor · approved · 24/6535No. 13 · 2025 · single-storey side · approved · 25/4185No number · 2025 · single-storey rear · approved · 25/4540No. 23 · 2025 · two-storey side · approved · 25/4863No number · 2025 · side · undecided · 25/4988No number · 2025 · porch / front · approved · 25/5064No. 20 · 2025 · single-storey rear · approved · 25/5130No number · 2025 · side · approved · 25/5435No. 7 · 2025 · single-storey rear · approved · 25/5755No number · 2025 · rear · undecided · 25/6001No number · 2026 · other extension · undecided · 26/0110No number · 2026 · other extension · approved · 26/0430No number · 2026 · rear · undecided · 26/0557No number · 2026 · rear · undecided · 26/0809No number · 2026 · rear · undecided · 26/1150No. 12 · 2026 · single-storey rear · undecided · 26/2764Porches, roofs, otherNo number · 2021 · other work · approved · 21/5240No. 40 · 2022 · other work · undecided · 22/4083No number · 2023 · other work · approved · 23/4537No number · 2024 · other work · undecided · 24/4612No number · 2024 · other work · undecided · 24/4773No number · 2024 · other work · approved · 24/5685No number · 2025 · other work · approved · 25/4601No number · 2025 · other work · undecided · 25/5679No number · 2025 · other work · approved · 25/5856No number · 2025 · other work · approved · 25/6003No number · 2025 · other work · approved · 25/6126New house in a side gardenNo. 14 · 2021 · new house · undecided · 21/568414No number · 2023 · new house · undecided · 23/4152No number · 2023 · new house · approved · 23/4633No number · 2023 · new house · undecided · 23/4665No number · 2023 · new house · refused · 23/4824No number · 2023 · new house · approved · 23/5796No number · 2024 · new house · refused · 24/4771No number · 2024 · new house · approved · 24/4900No number · 2025 · new house · approved · 25/5639No number · 2026 · new house · undecided · 26/0108No number · 2026 · new house · approved · 26/0427No number · 2026 · new house · undecided · 26/2489
ApprovedRefusedWithdrawn or invalid

64 files with "Carrignafoy" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. Building starts about 7 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; Appeal window: 4 weeks; Building starts: 220 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–123 (n=54)55 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 220 days after permission (n=10)220 days after permissionSigned off100% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated54 decided home extensions, 10 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Appeals nearby 2 in the last 12 months
    • 500875 Granted with conditions · Glassons Avenue, Carrignafoy, Cobh, Co. Cork · 439 m
    • 324052 Granted · Carrignafoy, Cobh Co. cork · 414 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Cobh Rural ED, Municipal District of Cobh, County Cork, Munster, Éire / Ireland with 9 numbered planning items
    ⌖ the houseOpen for commentsEmpty land zoned for homesApprovedNo decision yet
    1. 1No.12 Elton Estate, Carrignafoy 26/2764No decision yet · 142 m
    2. 20.2 ha zoned for homesEmpty land zoned for homes · 245 m
    3. 30.3 ha zoned for homesEmpty land zoned for homes · 325 m
    4. 45.8 ha zoned for homesEmpty land zoned for homes · 415 m
    5. 5The Laurels, Ballywilliam 26/2043Approved with conditions · 245 m
    6. 6Merton Lodge, French's Walk 26/1150No decision yet · 317 m
    7. 7Sunville, Wilmount Park 26/0430Approved with conditions · 337 m
    8. 8New Park, The Mall 26/0427Approved with conditions · 376 m
    9. 9Lower Cottrells Row, Cobh 26/2380No decision yet · 474 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 33 permissions since 2016, 7 show a start notice and 0 have a completion certificate. Most owners opt out of sign-off.

    61 applications lodged within 500 m. Council: 33 approved, 2 refused. After appeals: 33 approved. Of those: 0 signed off, 5 built with the owner's opt-out, 2 started, 26 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT33: lodged → approved2: lodged → refused26: lodged → undecided33: approved → approved2: refused → refused26: undecided → undecided26: approved → no start notice found5: approved → built, owner opted out2: approved → started, not signed off61 lodged61 lodged33 approved33 approved2 refused2 refused26 undecided26 undecided33 approved33 approved2 refused2 refused26 undecided26 undecided26 no start notice found26 no start notice found5 built, owner opted out5 built, owner opted out2 started, not signed off2 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured61 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 30 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-30 26/2764: application received — Permission for the retention of the following: A- Existing lean-to side covered area B- Existing rear/side single stortoday10 Nov15 Nov20 Nov25 Nov30 Nov5 Dec26/2764: application received — Permission for the retention of the following: A- Existing lean-to side covered area B- Existing rear/side single stor · 142 m away · 2026-11-30
    Comments close
    • Comments close 30 Nov 202625 days left
      126/2764 · application received — Permission for the retention of the following: A- Existing lean-to side covered area B- Existing…
      €20 to the council · 142 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 3 within 500 m

    Empty land zoned for homes 3

    • 20.2 ha zoned for homes · no homes built on it yet · 245 m
    • 30.3 ha zoned for homes · no homes built on it yet · 325 m
    • 45.8 ha zoned for homes · no homes built on it yet · 415 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 7

    Applications within 500 m, by year

    Between 2 and 14 a year; busiest 2024. 94% of decisions were approvals.

    2021: 14, 2022: 2, 2023: 7, 2024: 14, 2025: 13, 2026: 11051015202021: 8 approved2021: 6 undecided14’21*2022: 1 approved2022: 1 undecided2’222023: 3 approved2023: 1 refused2023: 3 undecided7’232024: 7 approved2024: 1 refused2024: 6 undecided14’242025: 11 approved2025: 2 undecided13’252026: 3 approved2026: 8 undecided11’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 11 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 4 in the last 12 months
    1 not signed off3 no sign-off needed
    • Glasson's Avenue, Cobh, Cork · 28 Sept 2026 · 2 homes · start notice not signed off · 255856 · 457 m
    • Frenchs Walk, Cobh, Cork · 4 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 24/6535 · 430 m
    • Ballywilliam Estate, Ballywilliam, Carrignafoy,, Cobh, Cork · 4 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/5639 · 141 m
    • 21 Saint Patrick's Square, Cobh, Cork, P24 TK31 · 2 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 25/04863 · 104 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Early Years Educational Centre · Crèche18 Feb 2025 · report · Tusla Early Years Inspectorate291 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Cork County Council.
    Homes approved
    Here194
    Council middle0
    Homes started
    Here386
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    62% of homes built before 1971 (council 28%). 89% owner-occupied (council 73%).

    Homes built before 1971
    62% · council 28%
    Homes built since 2001
    9% · council 36%
    Owner-occupied
    89% · council 73%
    Rented
    7% · council 22%
    Children under 15
    18% · council 21%
    Aged 65 and over
    34% · council 16%
    Households with 2+ cars
    22% · council 52%
    Work mainly from home
    10% · council 12%
    This small area (238 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047107006

    Bus
    209 m
    Joe Reid Place · 250 · busiest stop within 500 m: 2 an hour at peak
    Nearest school
    685 m
    Carrignafoy Community College, 322 pupils
    Schools, stops and the council

    Schools

    • Carrignafoy Community College · postprimary · 322 pupils · 685 m
    • Gaelscoile Cobh · primary · 46 pupils · 727 m
    • Cobh NS · primary · 15 pupils · 850 m

    Stops 7

    • Joe Reid Place · 250 · 209 m
    • O'Neill's Place · 200, 211, 250 · 2/hour at peak · 276 m
    • O'Neill's Place · 211 · 1/hour at peak · 309 m
    • The Spires · 200, 211 · 3/hour at peak · 635 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Carrignafoy Community College · 685 m-9.6% pupils (322) · 27 classrooms 2025, approved with conditions
    • Gaelscoile Cobh · 727 m-22% pupils (46)
    • Cobh NS · 850 m-31.8% pupils (15)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 142 m away open for comments until 30 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Carrignafoy
    Electoral division
    Cobh Urban
    Electoral area
    Cobh
    Council
    Cork County Council
    Everything we found, as a list 8 lines
    • Zoned R3 (rural cluster); no vacant land tax.
    • 3 sites nearby could change: 3 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 30 Nov 2026.
    • O'Neill's Place (bus 200, 211) 276 m away: 2 an hour at morning peak.
    • Here (2022 census): 89% owner-occupied (council 73%); 8% of homes empty (council 13%); most built 1961–1970; 68% drive to work (council 66%); population up 7% since 2016.
    • 1 home extension within 250 m since 2026.
    • Around here the council decides in a median 56 days (about 8 weeks).
    • 11 applications nearby in the last 12 months.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 09:03 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.