78 Kilbrody

51.86525, -8.40337

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (99%). 100 homes approved 1.1 km away haven't started.

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Sustainable Residential Neighbourhoods: To protect and provide for residential uses and amenities, local services and community, institutional, educational and civic uses.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork city development plan 2022 2028 variation no 3 npf implementation · 8 Aug 2022 – 8 Aug 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings18Douglas House; Maryborough Hotel
Monuments39House - fortified house; Railway bridge
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4197 on the draft 2027 map; 3988 on the final 2026 map.
Sources: zoning, rzlt, constraints, constraints.niah, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 13 Oct 2026, 00:21
SourceLicenceFetchedLink
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 88% approved.

Single-storey rear23 decided · more info asked 0%
100% · council 97%
Attic or dormer27 decided · more info asked 0%
100% · council 94%
New house in a garden or site50 decided · more info asked 0%
88% · council 71%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 100 nearby, 1,862 council-wide

Extensions and refusals right beside you 0 within 250 m · 1 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 1 in the last 12 months

  • 26/44700 · new house · refused 24 Jun 2026 · 28 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: npad, acp · fetched 13 Oct 2026, 01:45
SourceLicenceFetchedLink
npadCC-BY-4.013 Oct 2026, 01:45open
acpCC-BY-4.09 Oct 2026, 23:03open
Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
SourceLicenceFetchedLink
acpCC-BY-4.09 Oct 2026, 23:03open
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 3

How long, and what if someone objects?

Figure 3

A home extension's journey here

A decision takes 55 days. Building starts about 4 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; Appeal window: 4 weeks; Building starts: 109 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 mo21 mo24 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–64 (n=115)55 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 109 days after permission (n=14)109 days after permissionSigned off57% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated116 decided home extensions, 14 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 4

What appeals changed

1 of 4 appealed refusals became permissions. 0 of 8 appealed approvals were reversed.

Refusals appealed4 decided
1 became permissions
Approvals appealed8 decided
0 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 2 in the last 12 months
  • 324262 Granted with conditions · Maryborough Hill, Moneygurney (townland), Douglas, Cork · 649 m
  • 500529 Granted · Monfieldstown and, Mounthovel, (Townlands), Rochestown Cork · 1.3 km
Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
SourceLicenceFetchedLink
acpCC-BY-4.09 Oct 2026, 23:03open
courtsall-rights-reserved13 Oct 2026, 01:30open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 4

What's changing around you?

Street map around 78 Kilbrody with 15 numbered planning items
⌖ the houseOpen for commentsWindow closingApproved, not startedRefusedEmpty land zoned for homesBuilding startedApproved
  1. 1Leafy Lane, Moneygurney 26/45031No decision yet · 439 m
  2. 212 Applewood, Maryborough Ridge 26/45028No decision yet · 741 m
  3. 321, Wrenbank 26/44950Approved with conditions · 460 m
  4. 4Castletreasure, Moneygurney and Maryborough (townlands) 26/44924Approved with conditions · 1.7 km
  5. 5Clarkes Hill 2140135Approved, no sign building has started · 1.1 km
  6. 6Rochestown Inn 2342294Approved, no sign building has started · 1.6 km
  7. 7Site to the rear of existing dwelling at Mount Oval, Mounthovel (townland) 26/44700Refused · 28 m
  8. 80.2 ha zoned for homesEmpty land zoned for homes · 2 m
  9. 90.3 ha zoned for homesEmpty land zoned for homes · 2 m
  10. 100.4 ha zoned for homesEmpty land zoned for homes · 29 m
  11. 110.4 ha zoned for homesEmpty land zoned for homes · 60 m
  12. 120.1 ha zoned for homesEmpty land zoned for homes · 78 m
  13. 130.1 ha zoned for homesEmpty land zoned for homes · 80 m
  14. 1457 Kilbrody, Mount Oval Village 26/44491Building started · 152 m
  15. 158, Dunkerrin 25/44349Approved with conditions · 360 m
Figure 5

What happens to applications within 500 m

Permission isn't building. Of 61 permissions since 2016, 6 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.

69 applications lodged within 500 m. Council: 61 approved, 4 refused. After appeals: 61 approved. Of those: 1 signed off, 5 built with the owner's opt-out, 0 started, 55 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT61: lodged → approved4: lodged → refused4: lodged → undecided61: approved → approved4: refused → refused4: undecided → undecided55: approved → no start notice found5: approved → built, owner opted out1: approved → signed off69 lodged69 lodged61 approved61 approved4 refused4 refused4 undecided4 undecided61 approved61 approved4 refused4 refused4 undecided4 undecided55 no start notice found55 no start notice found5 built, owner opted out5 built, owner opted out1 signed off1 signed off

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured69 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 6

The next 30 days

4 deadlines within 2.0 km; the first closes 14 Oct 2026.

4 deadlines in the next 30 days: 2026-10-14 26/44924: Conditional Permission — Permission for alterations to the Large-Scale Residential Development (LRD); 2026-10-16 26/45028: application received — Permission for attic conversion with dormer to front roof and rear roof to; 2026-10-19 26/45031: application received — Permission is sought for extension of watermain and foul rising mains eastwards; 2026-10-28 26/44950: Conditional Permission — Permission for alterations and extensions to an existing dwellingtoday18 Oct23 Oct28 Oct2 Nov7 Nov12 Nov26/44924: Conditional Permission — Permission for alterations to the Large-Scale Residential Development (LRD) · 1.7 km away · 2026-10-1426/45028: application received — Permission for attic conversion with dormer to front roof and rear roof to · 741 m away · 2026-10-1626/45031: application received — Permission is sought for extension of watermain and foul rising mains eastwards · 439 m away · 2026-10-1926/44950: Conditional Permission — Permission for alterations and extensions to an existing dwelling · 460 m away · 2026-10-28
Comments closeTime to appeal ends
  • Time to appeal ends 14 Oct 20261 day left
    426/44924 · Conditional Permission — Permission for alterations to the Large-Scale Residential Development (LRD)
    €220 to An Coimisiún Pleanála (€110 observer) · 1.7 km away
  • Comments close 16 Oct 20263 days left
    226/45028 · application received — Permission for attic conversion with dormer to front roof and rear roof to
    €20 to the council · 741 m away
  • Comments close 19 Oct 20266 days left
    126/45031 · application received — Permission is sought for extension of watermain and foul rising mains eastwards
    €20 to the council · 439 m away
  • Time to appeal ends 28 Oct 202615 days left
    326/44950 · Conditional Permission — Permission for alterations and extensions to an existing dwelling
    €220 to An Coimisiún Pleanála (€110 observer) · 460 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 7

Approved, stalled or planned, not built yet

100 homes 1.1 km away were approved Jun 2023 with no start notice yet; the permission runs to Jun 2028.

Clarkes Hill · 100 homes: 100 homes approved Jun 2023, not started2023202420252026202720282029Clarkes Hill · 100 homes1.1 km · 2140135100 homes approved Jun 2023, not started100 homes approved Jun 2023, not startedtoday

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 11 within 2.0 km

Derelict building 4

  • Belmont, Rochestown · derelict since Nov 2023 · 657 m
  • Gate Lodge, Woodville · derelict since Feb 2022 · 1.5 km
  • The Rochestown Inn, Rochestown Road · derelict since Nov 2023 · 1.5 km
  • Old Railway Station, Rochestown Road · derelict since Jul 2016 · 1.6 km

Approved, not started 1

  • Clarkes Hill · 100 homes approved Jun 2023, not started · 1.1 km

Empty land zoned for homes 6

  • 80.2 ha zoned for homes · no homes built on it yet · 2 m
  • 90.3 ha zoned for homes · no homes built on it yet · 2 m
  • 100.4 ha zoned for homes · no homes built on it yet · 29 m
  • 110.4 ha zoned for homes · no homes built on it yet · 60 m
  • 120.1 ha zoned for homes · no homes built on it yet · 78 m
  • 130.1 ha zoned for homes · no homes built on it yet · 80 m

Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
SourceLicenceFetchedLink
acpCC-BY-4.09 Oct 2026, 23:03open
bcmsCC-BY-4.013 Oct 2026, 00:21open
derelictCC-BY-4.012 Oct 2026, 23:08open
npadCC-BY-4.013 Oct 2026, 01:45open
Figure 8

Applications within 500 m, by year

Between 3 and 11 a year; busiest 2020. 94% of decisions were approvals.

2017: 10, 2018: 5, 2019: 6, 2020: 11, 2021: 8, 2022: 4, 2023: 7, 2024: 5, 2025: 3, 2026: 10051015202017: 9 approved2017: 1 refused10’17*2018: 5 approved5’182019: 6 approved6’192020: 10 approved2020: 1 refused11’202021: 7 approved2021: 1 refused8’212022: 4 approved4’222023: 7 approved7’232024: 5 approved5’242025: 3 approved3’252026: 5 approved2026: 1 refused2026: 4 undecided10’26*
ApprovedRefusedWithdrawn or invalidUndecided

2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 2.0 km 47 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: npad, acp, bcms · fetched 13 Oct 2026, 01:45
SourceLicenceFetchedLink
npadCC-BY-4.013 Oct 2026, 01:45open
acpCC-BY-4.09 Oct 2026, 23:03open
bcmsCC-BY-4.013 Oct 2026, 00:21open
Building work nearby 17 in the last 12 months
7 not signed off10 no sign-off needed
  • 23 Mount Ovel, Cork, T12 E2FH · 28 Sept 2026 · 1 homes · short notice no sign-off needed · 2443266 · 1.0 km
  • Block R - No's 01 & 02 The Lawn, Belview Wood, Maryborough Ridge, Moneygurney, Cork · 18 Sept 2026 · 447 homes · 7-day notice not signed off · ABP-307041-20 · 1.3 km
  • Wildwood, Maryborough Hill,, Douglas, Cork, T12 KN7V · 18 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · 26/44629 · 1.4 km
  • Block Q, No's 42 & 43, The View, Belview Wood, Maryborough Ridge, Moneygurney, Cork · 16 Sept 2026 · 447 homes · start notice not signed off · ABP-307041-20 · 1.3 km
  • Moneygurney Road, Moneygurney, Douglas, Cork · 14 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2543802 · 424 m
  • 60 Maryborough Avenue, Douglas, Cork, T12 WE2F · 29 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 26/44571 · 1.7 km
  • Riverside Park, Castletreasure, Douglas, Cork · 23 Jun 2026 · 108 homes · start notice not signed off · 24/43489 · 1.5 km
  • Garryduff Sports Centre, Rochestown, Cork, T12 ER22 · 18 Jun 2026 · start notice not signed off · 2544136 · 662 m
  • 1457 Kilbrody, Mount Oval Village, Cork, T12 HYY2 · 16 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 26/44491 · 152 m
  • The Pines, Maryborough Avenue, Douglas, Cork, T12EC1K · 22 May 2026 · 1 homes · start notice, opted out no sign-off needed · 26/44484 · 1.8 km
  • San Martino, Maryborough Hill, Douglas, Cork · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · 23/42487 · 983 m
  • 8 Abbostwoods Downs Monastery Road, Cork, T12 RVY7 · 15 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 25/44370 · 1.1 km
  • Coolowen, Maryborough Hill, Douglas, Cork, T12 HY0T · 31 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/43813 · 1.2 km
  • 35 Lislee Road, Maryborough Estate, Douglas, Cork, T12 E30F · 26 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 24/43006 · 1.6 km
  • Aspen Drive, Maryborough Ridge, Moneygurney, Douglas, Cork · 22 Dec 2025 · 1 homes · start notice not signed off · ABP-314465-22 · 1.1 km
  • Aspen Drive, Maryborough Ridge, Moneygurney, Douglas, Cork · 22 Dec 2025 · 1 homes · start notice not signed off · ABP-314465-22 · 1.1 km
  • Aspen Drive, Maryborough Ridge, Moneygurney, Douglas, Cork · 19 Dec 2025 · 1 homes · start notice not signed off · ABP-314465-22 · 1.0 km
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: bcms · fetched 13 Oct 2026, 00:21
SourceLicenceFetchedLink
bcmsCC-BY-4.013 Oct 2026, 00:21open
Homes coming 112 not started
  • Castletreasure · 580 homes · building started · 1.4 km
  • 5Clarkes Hill · 100 homes · not started · runs out 6 Jun 2028 · 1.1 km
  • Woodville · 28 homes · ran out · runs out 3 Aug 2026 · 1.4 km
  • Moneygurney · 19 homes · ran out · runs out 12 Apr 2024 · 1.1 km
  • 6Rochestown Inn · 12 homes · not started · runs out 8 Jul 2029 · 1.6 km
How we work this out
Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
SourceLicenceFetchedLink
acpCC-BY-4.09 Oct 2026, 23:03open
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Who applies most nearby

  • Murnane O' Shea Limited — 3 applications, latest 24 Jul 2026

Crèches and schools inspected

NameLatest inspectionDistance
Tigers Childcare · Crèche11 May 2026 · report · Tusla Early Years Inspectorate312 m
Kangakare Childcare Ltd · Crèche15 Nov 2024 · report · Tusla Early Years Inspectorate534 m
Kangakare Childcare Ltd · Crèche20 Apr 2026 · report · Tusla Early Years Inspectorate534 m
Bright Beginnings · Crèche15 Jan 2025 · report · Tusla Early Years Inspectorate667 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: organisations, schools, tusla_ey · fetched 11 Oct 2026, 23:05
SourceLicenceFetchedLink
organisationsn/a — derived; organisations only; DLR-sourced links withheld11 Oct 2026, 23:05—
schoolsCC-BY-4.027 Sept 2026, 23:32open
tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
How busy is this area Busier than most of Cork City Council.
Homes approved
Here0
Council middle0
Homes started
Here464
Council middle50
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
SourceLicenceFetchedLink
acpCC-BY-4.09 Oct 2026, 23:03open
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 5

What's the area like?

Figure 9

This street block against the council

6% of homes built before 1971 (council 36%). 73% owner-occupied (council 56%).

Homes built before 1971
6% · council 36%
Homes built since 2001
83% · council 24%
Owner-occupied
73% · council 56%
Rented
21% · council 38%
Children under 15
34% · council 17%
Aged 65 and over
4% · council 15%
Households with 2+ cars
67% · council 36%
Work mainly from home
17% · council 12%
This small area (301 people)Cork

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047132067

Bus
223 m
Landsborough · 216 · busiest stop within 500 m: 2 an hour at peak
Nearest school
403 m
Scoil Phadraig Naofa, 460 pupils
Schools, stops and the council

Schools

  • Scoil Phadraig Naofa · primary · 460 pupils · 403 m
  • Rochestown Community Special School · primary · 66 pupils · 596 m
  • St Marys Spec Sch · primary · 85 pupils · 1.6 km
  • Douglas Rochestown Educate Together National School · primary · 506 pupils · 1.6 km
  • St Francis Capuchin College · postprimary · 730 pupils · 1.9 km

Stops 40

  • Landsborough · 216 · 2/hour at peak · 223 m
  • Foxwood · 216 · 2/hour at peak · 238 m
  • Landsborough · 216 · 2/hour at peak · 265 m
  • Foxwood · 216 · 2/hour at peak · 307 m
  • Garryduff SC · 216 · 2/hour at peak · 494 m
  • Garryduff SC · 216 · 2/hour at peak · 499 m
  • The Borough · 216 · 2/hour at peak · 516 m
  • The Borough · 216 · 2/hour at peak · 524 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Scoil Phadraig Naofa · 403 m-1.1% pupils (460)
  • Rochestown Community Special School · 596 m+40.4% pupils (66)
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
SourceLicenceFetchedLink
gtfsCC-BY-4.011 Oct 2026, 23:43open
schoolsCC-BY-4.027 Sept 2026, 23:32open
npadCC-BY-4.013 Oct 2026, 01:45open
consultpublic13 Oct 2026, 01:29open
moderngovpublic13 Oct 2026, 01:29open
lda_landsCC-BY-4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. On the vacant land tax map: is the 3% tax being paid?
    Ask for: Your solicitor's check of liability or exemption.
    Solicitor
  2. Application 439 m away open for comments until 19 Oct 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
    Council
  3. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Electoral division
Carrigaline/Monkstown Rural/Douglas
Electoral area
Cork City South East
Council
Cork City Council
Everything we found, as a list 8 lines
  • Zoned R2 (existing residential); not protected; on the vacant land tax map.
  • 11 sites nearby could change: 4 derelict, 1 approved scheme, 6 empty zoned plots.
  • 2 applications open for comments nearby; nearest closes 19 Oct 2026.
  • 1 application refused within 100 m since 2025; latest a new house (2026).
  • 112 homes approved nearby, not started; largest 100 at Clarkes Hill.
  • Landsborough (bus 216) 223 m away: 2 an hour at morning peak; 11 from all stops within 500 m.
  • Here (2022 census): 73% owner-occupied (council 56%); 1% of homes empty (council 6%); most built 2001–2010; 71% drive to work (council 54%).
  • Around here the council decides in a median 55 days (about 8 weeks); 1 in 12 is asked for more information.
What the terms mean 9 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
  • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 27
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.012 Oct 2026
data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public13 Oct 2026
www2.courts.ie—all-rights-reserved13 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)public13 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.013 Oct 2026
organisationsPlanning Register (derived from applications and the CRO register)n/a — derived; organisations only; DLR…11 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…13 Oct 2026
services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 13 Oct 2026, 20:37 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.