Planning report · Cork City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 02:29

Bromley Park

51.86751, -8.44268

Homes here mostly date from the 1990s. 1 planning file on this house, the latest from 2024. Home extensions nearby almost always get approved (95%). 1 application nearby open for comments.

See on the mapWatch this area

Not held yet for Cork City Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations. 1 planning file on this house, the latest from 2024.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2024: 2442926 · work already done, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    2442926 · work already done · approved 2024 · work already done
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Sustainable Residential Neighbourhoods: To protect and provide for residential uses and amenities, local services and community, institutional, educational and civic uses.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork city development plan 2022 2028 variation no 3 npf implementation · 8 Aug 2022 – 8 Aug 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings11mill (water); worker's house
Monuments3Mill - flax; Country house
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1397 on the draft 2027 map; 1396 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 73% approved.

Single-storey rear24 decided · more info asked 4%
100% · council 97%
Two-storey rear12 decided · more info asked 0%
92% · council 95%
Single-storey side11 decided · more info asked 0%
100% · council 95%
Attic or dormer21 decided · more info asked 0%
90% · council 94%
First-floor13 decided · more info asked 0%
92% · council 93%
New house in a garden or site15 decided · more info asked 0%
73% · council 66%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 96 nearby, 1,432 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; Appeal window: 4 weeks; Building starts: 164 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 54–64 (n=113)55 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 164 days after permission (n=33)164 days after permissionSigned off85% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated116 decided home extensions, 33 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    4 of 6 appealed refusals became permissions. 0 of 10 appealed approvals were reversed.

    Refusals appealed6 decided
    4 became permissions
    Approvals appealed10 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501244 Refused · 49, Calderwood Drive, Donnybrook, Douglas, co. Cork · 420 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 4

    What's changing around you?

    Street map around Bromley Park with 11 numbered planning items
    ⌖ the houseOpen for commentsDerelict buildingEmpty land zoned for homesNo decision yetApproved
    1. 151 Bromley Park, Donnybrook 26/45104No decision yet · 114 m
    2. 235 Hillside, Grange 301Derelict building · 300 m
    3. 30.1 ha zoned for homesEmpty land zoned for homes · 37 m
    4. 40.1 ha zoned for homesEmpty land zoned for homes · 53 m
    5. 50.4 ha zoned for homesEmpty land zoned for homes · 66 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 100 m
    7. 70.4 ha zoned for homesEmpty land zoned for homes · 101 m
    8. 855 Grange Park, Douglas 26/44680No decision yet · 225 m
    9. 94 Grange Terrace, Grange Road 26/44799Approved with conditions · 378 m
    10. 1049, Calderwood Drive 25/44450Approved with conditions · 420 m
    11. 1119 Hillside, Grange 26/44752Approved with conditions · 424 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 39 permissions since 2016, 9 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.

    41 applications lodged within 500 m. Council: 39 approved, 0 refused. After appeals: 39 approved. Of those: 1 signed off, 5 built with the owner's opt-out, 3 started, 30 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT39: lodged → approved2: lodged → undecided39: approved → approved2: undecided → undecided30: approved → no start notice found5: approved → built, owner opted out3: approved → started, not signed off1: approved → signed off41 lodged41 lodged39 approved39 approved2 undecided2 undecided39 approved39 approved2 undecided2 undecided30 no start notice found30 no start notice found5 built, owner opted out5 built, owner opted out3 started, not signed off3 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured41 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 20 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-20 26/45104: application received — Permission to demolish a single storey extension to the rear of an existingtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 Dec26/45104: application received — Permission to demolish a single storey extension to the rear of an existing · 114 m away · 2026-11-20
    Comments close
    • Comments close 20 Nov 202619 days left
      126/45104 · application received — Permission to demolish a single storey extension to the rear of an existing
      €20 to the council · 114 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 9 within 500 m

    Derelict building 3

    • 235 Hillside, Grange · derelict since Jul 2011 · 300 m
    • 8 Grange Terrace, Grange Road · derelict since Nov 2022 · 356 m
    • Site adjacent to Pinecroft Inn, Grange Road · derelict since Nov 2023 · 423 m

    Empty land zoned for homes 6

    • 30.1 ha zoned for homes · no homes built on it yet · 37 m
    • 40.1 ha zoned for homes · no homes built on it yet · 53 m
    • 50.4 ha zoned for homes · no homes built on it yet · 66 m
    • 60.2 ha zoned for homes · no homes built on it yet · 100 m
    • 70.4 ha zoned for homes · no homes built on it yet · 101 m
    • 1.3 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 5 and 8 a year; busiest 2022. 100% of decisions were approvals.

    2021: 11, 2022: 8, 2023: 6, 2024: 7, 2025: 5, 2026: 4051015202021: 11 approved11’21*2022: 8 approved8’222023: 6 approved6’232024: 7 approved7’242025: 5 approved5’252026: 2 approved2026: 2 undecided4’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 5 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 3 in the last 12 months
    2 not signed off1 no sign-off needed
    • 17 Donnybrook Cottages, Donnybrook, Douglas, Cork, T12 FYX8 · 26 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2543833 · 341 m
    • Pinecroft Houses, Grange Road, Douglas, Cork · 4 Jun 2026 · 2 homes · start notice not signed off · 2241050 · 443 m
    • 35 Hillside, Douglas, Cork, T12 V8K1 · 24 Mar 2026 · 3 homes · start notice not signed off · 320 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Bel Childcare Ltd · Crèche30 Mar 2026 · report · Tusla Early Years Inspectorate172 m
    BEL Childcare · Crèche6 Feb 2025 · report · Tusla Early Years Inspectorate562 m
    Barbara Gaffney Montessori School · Crèche15 Jun 2023 · report · Tusla Early Years Inspectorate678 m
    Douglas Community Pre-School · Crèche14 Jan 2026 · report · Tusla Early Years Inspectorate832 m
    Springbrook Montessori · Crèche2 Dec 2025 · report · Tusla Early Years Inspectorate849 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Cork City Council.
    Homes approved
    Here82
    Council middle0
    Homes started
    Here604
    Council middle60
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    6% of homes built before 1971 (council 36%). 65% owner-occupied (council 56%).

    Homes built before 1971
    6% · council 36%
    Homes built since 2001
    20% · council 24%
    Owner-occupied
    65% · council 56%
    Rented
    29% · council 38%
    Children under 15
    20% · council 17%
    Aged 65 and over
    8% · council 15%
    Households with 2+ cars
    52% · council 36%
    Work mainly from home
    9% · council 12%
    This small area (284 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047132023

    Bus
    210 m
    Calderwood Road · 207 · busiest stop within 500 m: 4 an hour at peak
    Nearest school
    678 m
    St Columbas N.S, 377 pupils
    Schools, stops and the council

    Schools

    • St Columbas N.S · primary · 377 pupils · 678 m
    • Douglas B NS · primary · 353 pupils · 692 m
    • St Lukes NS Douglas · primary · 203 pupils · 827 m

    Stops 26

    • Calderwood Road · 207 · 2/hour at peak · 210 m
    • Calderwood Road · 207 · 2/hour at peak · 222 m
    • Donnybrook Trce · 207 · 2/hour at peak · 249 m
    • Grange Park · 206 · 4/hour at peak · 251 m
    • Donnybrook Trce · 207 · 2/hour at peak · 254 m
    • Hillcourt · 207 · 2/hour at peak · 260 m
    • Grange Park · 206 · 4/hour at peak · 262 m
    • Grange Wd Ct · 206 · 4/hour at peak · 277 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Columbas N.S · 678 m+1.9% pupils (377)
    • Douglas B NS · 692 m-3% pupils (353)
    • St Lukes NS Douglas · 827 m-1.9% pupils (203)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Work already done (2442926): work kept with permission. Done as approved?
      Ask for: The retention grant and an opinion of compliance.
      Seller · solicitor
    2. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    3. Application 114 m away open for comments until 20 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Carrigaline/Monkstown Rural/Douglas
    Electoral area
    Cork City South East
    Council
    Cork City Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 2442926, approved 2024, work already done.
    • Zoned R2 (existing residential); not protected; on the vacant land tax map.
    • 9 sites nearby could change: 3 derelict, 6 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 20 Nov 2026.
    • Donnybrook Hill (bus 206, 207) 493 m away: 7 an hour at morning peak; 48 from all stops within 500 m.
    • Here (2022 census): 65% owner-occupied (council 56%); 5% of homes empty (council 6%); most built 1991–2000; 55% drive to work (council 54%).
    • 1 home extension within 250 m since 2026.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 12 is asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 02:29 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.