Planning report · Cork County Council · 2000 m around the house · the last 12 months · 26 Oct 2026, 18:24

Cobh Rural ED, Municipal District of Cobh, County Cork, Munster, Éire / Ireland

51.87362, -8.27888

Homes here mostly date from before 1919. 98 homes approved 1.8 km away haven't started.

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1900–1918 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
Yes
Protected or listed · inside the zone around a recorded monument (CO075-038----)
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Monument zoneOn this site Ringfort - rath, Rosslague

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings9martello tower; Avonmore
Monuments60Brickworks; Ringfort - rath
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), Sites and Monuments Record, SMR zones of notification, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 83% approved.

New house in a garden or site6 decided · more info asked 0%
83% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 6 nearby, 4,502 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Appeals nearby 2 in the last 12 months
    • 324052 Granted · Carrignafoy, Cobh Co. cork · 1.5 km
    • 323970 Other · Carrignafoy, Cobh, Co. Cork · 1.9 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher25 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 4

    What's changing around you?

    Street map around Cobh Rural ED, Municipal District of Cobh, County Cork, Munster, Éire / Ireland with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedEmpty land zoned for homesApprovedNo decision yet
    1. 1Tay Road, Ballywilliam 26/2502No decision yet · 1.0 km
    2. 2Inis Álainn 25/6126Approved, no sign building has started · 1.6 km
    3. 3Inis Alainn Carrignafoy Cobh Co. Cork 21/5240Approved, not started, approval runs out within a year · 1.7 km
    4. 4Carrignafoy Cobh Co Cork 25/5474Approved, no sign building has started · 1.8 km
    5. 55.8 ha zoned for homesEmpty land zoned for homes · 1.5 km
    6. 65.2 ha zoned for homesEmpty land zoned for homes · 1.6 km
    7. 70.5 ha zoned for homesEmpty land zoned for homes · 1.8 km
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 1.8 km
    9. 9Ballydulea, Cobh 26/2064Approved with conditions · 412 m
    10. 10Ballynacrusha, Cobh 25/6524Approved with conditions · 652 m
    11. 11Pottery Road, Belvelly 26/1683Approved with conditions · 1.3 km
    12. 12Ballynacrusha, Cobh 25/6803Approved with conditions · 1.5 km
    13. 13The Glebe, Tay Road 26/0719Approved with conditions · 1.5 km
    14. 14Mike's Cottage, Lissanisky 26/0364No decision yet · 1.5 km
    15. 15The Laurels, Ballywilliam 26/2043Approved with conditions · 1.8 km
    Figure 3

    The next 30 days

    1 deadline within 2.0 km; the first closes 2 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-02 26/2502: application received — CONSTRUCT A SINGLE STOREY EXTENSION AS AN ANCILLARY DWELLING TO THE SIDE AND FRONT OF EXISTING MAIN DWELLING AND ASSOCIAtoday31 Oct5 Nov10 Nov15 Nov20 Nov25 Nov26/2502: application received — CONSTRUCT A SINGLE STOREY EXTENSION AS AN ANCILLARY DWELLING TO THE SIDE AND FRONT OF EXISTING MAIN DWELLING AND ASSOCIA · 1 km away · 2026-11-02
    Comments close
    • Comments close 2 Nov 20267 days left
      126/2502 · application received — CONSTRUCT A SINGLE STOREY EXTENSION AS AN ANCILLARY DWELLING TO THE SIDE AND FRONT OF EXISTING…
      €20 to the council · 1.0 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 4

    Approved, stalled or planned, not built yet

    98 homes 1.8 km away were approved Mar 2026 with no start notice yet; the permission runs to Mar 2031.

    Carrignafoy Cobh Co Cork · 98 homes: 98 homes approved Mar 2026, not started; Inis Alainn Carrignafoy… · 71 homes: 71 homes approved, not started; runs out May 2027; Inis Álainn · 33 homes: 33 homes approved Mar 2026, not started20222023202420252026202720282029203020312032Carrignafoy Cobh Co Cork · 98 homes1.8 km · 25/547498 homes approved Mar 2026, not started98 homes approved Mar 2026, not startedInis Alainn Carrignafoy… · 71 homes1.7 km · 21/524071 homes approved, not started; runs out May 202771 homes approved, not started; runs out May 2027Inis Álainn · 33 homes1.6 km · 25/612633 homes approved Mar 2026, not started33 homes approved Mar 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 7 within 2.0 km

    Approved, not started, approval running out 1

    Approved, not started 2

    Empty land zoned for homes 4

    • 55.8 ha zoned for homes · no homes built on it yet · 1.5 km
    • 65.2 ha zoned for homes · no homes built on it yet · 1.6 km
    • 70.5 ha zoned for homes · no homes built on it yet · 1.8 km
    • 80.2 ha zoned for homes · no homes built on it yet · 1.8 km

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 5

    Applications within 500 m, by year

    2021: 3, 2026: 205102021: 3 approved3’21*2026: 1 approved2026: 1 undecided2’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1Tay Road, Ballywilliam, Cobh, P24 PY09 comments close 2 Nov 2026
      Construct a single storey extension as an ancillary dwelling to the side and front of existing main dwelling…
      26/250228 Sept 20261.0 km
    Every application within 2.0 km 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Building work nearby 8 in the last 12 months
    4 not signed off4 no sign-off needed
    • Ballywilliam, Cobh, Cork · 16 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 25/5320 · 1.4 km
    • 14-34 incl., the Inlet, Ard Roibín, carrignafoy, Cobh, Co Cork, Cobh, Cork · 20 Aug 2026 · 99 homes · start notice not signed off · 24/04072 · 1.8 km
    • The Close, Ard Alainn, Carrignafoy, Cobh, Cork · 23 Jun 2026 · 2 homes · start notice not signed off · 25/4601 · 1.8 km
    • Ballywilliam, Cobh, Cork · 30 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 25/5320 · 1.4 km
    • Ballynacrusha, Cobh, Cork · 7 Apr 2026 · start notice not signed off · 22/06396 · 1.0 km
    • Ballywilliam Estate, Ballywilliam, Carrignafoy,, Cobh, Cork · 4 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 25/5639 · 1.8 km
    • Ballywilliam, COBH, Cobh, Cork, P24FK06 · 27 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 25/5892 · 1.3 km
    • 21 to 34 incl. the close ard roibin carrignafoy cobh co cork, Cobh, Cork, P24 XR89 · 20 Feb 2026 · 99 homes · start notice not signed off · 24/04072 · 1.8 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Homes coming 202 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    How busy is this area About as busy as most of Cork County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here1
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 5

    What's the area like?

    Figure 6

    This street block against the council

    49% of homes built before 1971 (council 28%). 82% owner-occupied (council 73%).

    Homes built before 1971
    49% · council 28%
    Homes built since 2001
    13% · council 36%
    Owner-occupied
    82% · council 73%
    Rented
    11% · council 22%
    Children under 15
    12% · council 21%
    Aged 65 and over
    13% · council 16%
    Households with 2+ cars
    57% · council 52%
    Work mainly from home
    7% · council 12%
    This small area (602 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047106025

    Schools, stops and the council

    Schools

    None nearby.

      Stops 3

        Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
        SourceLicenceFetchedLink
        Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
        Department of Education school listCC BY 4.027 Sept 2026, 23:32open
        Council consultation portalsPublic26 Oct 2026, 00:55open
        Council meetings (ModernGov)Public26 Oct 2026, 01:54open
        Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
        cso_saps_2022CC BY 4.0—open
        National Transport AuthorityCC BY 4.0——
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
        EPA strategic noise mapsCC BY 4.0——
        Fingal County CouncilCC BY 4.0——
        Question 6

        What to ask, and who

        1. Next to a recorded monument: does digging need notice?
          Ask for: Details of past works from the seller.
          Seller · council
        2. Application 1 km away open for comments until 2 Nov 2026: comment?
          Ask for: The plans on the council's website (€20 to comment).
          Council
        3. Any work done without planning permission?
          Ask for: An opinion of compliance for the whole house.
          Seller · solicitor
        Reference

        Where this is, the terms, the sources

        Townland
        Rosslague
        Electoral division
        Cobh Rural
        Electoral area
        Cobh
        Council
        Cork County Council
        Everything we found, as a list 8 lines
        • Monument zone; no vacant land tax.
        • 7 sites nearby could change: 3 approved schemes, 4 empty zoned plots.
        • 1 application open for comments nearby; nearest closes 2 Nov 2026.
        • 202 homes approved nearby, not started; largest 98 at Carrignafoy Cobh Co Cork.
        • No scheduled public transport within 800 m.
        • Here (2022 census): 82% owner-occupied (council 73%); 9% of homes empty (council 13%); most built before 1919; 65% drive to work (council 66%); population up 8% since 2016.
        • Around here the council decides in a median 57 days (about 8 weeks).
        • 14 applications nearby in the last 12 months; 100% approved (council 92%).
        What the terms mean 8 terms
        • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
        • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
        • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
        • Approved (Grant of permission): The council said yes, usually with conditions.
        • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
        • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
        • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
        • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
        Sources and licences 26
        SourcePublisherLicenceFetched
        EPA strategic noise maps—CC BY 4.0—
        Fingal County Council—CC BY 4.0—
        Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
        National Transport Authority—CC BY 4.0—
        services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
        data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
        data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
        services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
        services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
        dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
        www2.courts.ie—© the publisher25 Oct 2026
        cso.ie—CC BY 4.0—
        dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
        services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
        transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
        lda.ieLand Development AgencyCC BY 4.011 Sept 2026
        meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
        services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
        services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
        services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
        propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
        services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
        gov.ieDepartment of EducationCC BY 4.027 Sept 2026
        gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
        services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
        Measured
        counted from a public register
        Calculated
        a rate or median we worked out from those counts
        Our classification
        we sorted it by reading each description
        Estimate
        inferred from another source (census, map data)
        Rule summary
        the law, simplified: check before relying on it
        How we work this out
        Generated 26 Oct 2026, 18:24 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.